HIGHWAY CONDITION REPORT AT 1745 HRS ON 8/16/13
CALTRANS HIGHWAY INFORMATION SECTION THE FOLLOWING CURRENT HIGHWAY CONDITIONS.
BE ALERT FOR FOG, CARRY TRACTION DEVICES IN MOUNTAIN AREAS AND WATCH FOR
HIGHWAY MAINTENANCE PERSONNEL. "SLOW FOR THE CONE ZONE"
TRAVEL IS NOT RECOMMENDED FOR CAMPERS, TRAILERS OR PERMIT LOADS IN THE AREAS
WITH A HIGH WIND ADVISORY POSTED.
------------------------------------------------------------------------------
SR 1
[IN THE SOUTHERN CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE CENTRAL CALIFORNIA AREA]
IS CLOSED 13.4 MI NORTH OF BIG SUR /AT ROCKY CREEK RD/ (MONTEREY CO) FROM
2100 HRS EACH NIGHT TO 0700 HRS EACH MORNING MONDAY THRU WEDNESDAY THRU 8/21/13
- DUE TO CONSTRUCTION - A DETOUR IS AVAILABLE
1-WAY CONTROLLED TRAFFIC 13.4 MI NORTH OF BIG SUR /AT ROCKY CREEK RD/
(MONTEREY CO) FROM 0700 HRS TO 1700 HRS & FROM 2100 HRS EACH NIGHT TO
0700 HRS EACH MORNING MONDAY THRU FRIDAY THRU 9/1/13 - DUE TO CONSTRUCTION
- MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.2 MI NORTH TO 4 MI
NORTH OF THE JCT OF SR 128 (MENDOCINO CO) 24 HRS A DAY 7 DAYS A WEEK THRU
0001 HRS ON 8/30/13 - DUE TO CONSTRUCTION
SR 2
[IN THE SOUTHERN CALIFORNIA AREA]
THE EASTBOUND CONNECTOR TO NORTHBOUND I 5 /IN LOS ANGELES/
(LOS ANGELES CO) IS CLOSED - DUE TO EMERGENCY REPAIRS - A DETOUR IS AVAILABLE
ALL TRACTOR-SEMI TRAILER COMBINATIONS WITH 3 AXLES OR GREATER ARE
PROHIBITED FROM THE JCT OF I 210 /IN LA CANADA-FLINTRIDGE/ TO THE
ANGELES FOREST HIGHWAY (LOS ANGELES CO) - ALTERNATE ROUTES ARE AVAILABLE
SR 3
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.5 MI NORTH OF
PEANUT TO 0.7 MI SOUTH OF HAYFORK (TRINITY CO) FROM 0700 HRS TO 1900 HRS
MONDAY THRU THURSDAY THRU 8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.2 MI SOUTH TO 1.3 MI
NORTH OF HAYFORK (TRINITY CO) FROM 0700 HRS TO 1900 HRS MONDAY THRU FRIDAY
THRU 8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 8.8 MI NORTH OF
TRINITY CENTER (TRINITY CO) TO 10.6 MI SOUTH OF THE TRININTY/SISKIYOU CO LINE
FROM 0600 HRS TO 1800 HRS MONDAY THRU FRIDAY THRU 8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC FROM 2.2 MI NORTH TO 2.7 MI NORTH OF CALLAHAN
(SISKIYOU CO) 24 HRS A DAY THRU 1500 HRS ON 8/19/13 - DUE TO CONSTRUCTION
SR 4
[IN THE CENTRAL CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC FROM 0.8 MI WEST TO 0.3 MI WEST OF STOCKTON
(SAN JOAQUIN CO) 24 HRS A DAY 7 DAYS A WEEK THRU 0001 HRS ON 11/1/13 -
DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
I 5
[IN THE SOUTHERN CALIFORNIA AREA]
NORTHBOUND TRAFFIC IS REDUCED TO 3 LANES 13.3 MI NORTH OF CASTAIC
(LOS ANGELES CO) TO THE LOS ANGELES/KERN CO LINE 24 HRS A DAY 7 DAYS A WEEK
THRU 9/6/13 - DUE TO CONSTRUCTION
SOUTHBOUND TRAFFIC IS REDUCED TO 3 LANES FROM THE KERN/LOS ANGELES CO LINE
TO 10.7 MI SOUTH OF THE KERN/LOS ANGELES CO LINE 24 HRS A DAY 7 DAYS A WEEK
THRU 8/29/13 - DUE TO CONSTRUCTION
[IN THE CENTRAL CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE NORTHERN CALIFORNIA AREA]
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION 1.6 MI NORTH TO
2 MI NORTH OF WILLOWS (GLENN CO) 24 HRS A DAY FROM 0500 HRS ON MONDAY TO
1000 HRS ON SATURDAY THRU 8/17/13 - DUE TO CONSTRUCTION
SR 18
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 173 TO
4.4 MI NORTH OF THE JCT OF SR 89 (SAN BERNARDINO CO) FROM 0900 HRS TO 1700 HRS
ON 8/16/13 - DUE TO MAINTENANCE - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO
15 MINUTES
SR 20
[IN THE NORTHERN CALIFORNIA AREA]
IS CLOSED FROM "G" ST TO "E" ST /IN MARYSVILLE/ (YUBA CO) 24 HRS A DAY
7 DAYS A WEEK THRU 0001 HRS ON 8/31/13 - DUE TO CONSTRUCITON - A DETOUR IS
AVAILABLE
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE LAKE/COLUSA CO LINE
TO 3.2 MI EAST OF THE LAKE/COLUSA CO LINE FROM 0600 HRS TO 1900 HRS MONDAY THRU
FRIDAY THRU 8/30/13 - DUE TO CONSTRUCTION
SR 22
[IN THE SOUTHERN CALIFORNIA AREA]
IS CLOSED TO EASTBOUND TRAFFIC FROM THE LOS ANGELES/ORANGE CO LINE TO
THE JCT OF I 405 /IN SEAL BEACH/ (ORANGE CO) FROM 2300 HRS EACH NIGHT TO
0500 HRS EACH MORNING MONDAY THRU FRIDAY THRU 9/17/13 - DUE TO CONSTRUCTION -
A DETOUR IS AVAILABLE
SR 24
[IN THE CENTRAL CALIFORNIA AREA]
EASTBOUND TRAFFIC IS REOPENED & REDUCED TO 1 LANE AT BROADWAY /IN OAKLAND/
(ALAMEDA CO) AT 1628 HRS ON 8/16/13 - DUE TO POLICE ACTIVITY
SR 32
[IN THE NORTHERN CALIFORNIA AREA]
IS CLOSED FROM 3.4 MI WEST TO 1.4 MI WEST OF THE JCT OF SR 36 (TEHAMA CO)
24 HRS A DAY FROM 0600 HRS MONDAY TO 0600 HRS FRIDAY THRU 8/30/13 - DUE TO
CONSTRUCTION - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3.4 MI WEST TO 1.4 MI
WEST OF THE JCT OF SR 36 (TEHAMA CO) FROM 0600 HRS TO 1800 HRS ON 8/16/13
- DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
SR 33
[IN THE SOUTHERN CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE CENTRAL CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM CASCADE ST /IN TAFT/ TO
8.8 MI SOUTH OF THE WEST JCT OF SR 58 (KERN CO) FROM 0600 HRS TO 1800 HRS
TUESDAY THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT
TO DELAYS OF UP TO 15 MINUTES
SR 36
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 3
(TRINITY CO) TO THE TRINITY/SHASTA CO LINE FROM 0730 HRS TO 1500 HRS MONDAY
THRU THURSDAY THRU 8/19/13 - DUE TO MAINTENANCE
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 1.4 MI EAST TO 2.4 MI
EAST OF THE JCT OF SR 3 (TRINITY CO) FROM 0700 HRS TO 1700 HRS MONDAY THRU
SATURDAY THRU 8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 6 MI EAST TO 11.5 MI
EAST OF THE SHASTA/TEHAMA CO LINE FROM 0600 HRS TO 1800 HRS MONDAY THRU FRIDAY
THRU 8/19/13 - DUE TO MAINTENANCE
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM BAKER RD TO ADOBE RD
/IN RED BLUFF/ (TEHAMA CO) FROM 0700 HRS TO 1600 HRS MONDAY THR FRIDAY THRU
8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE EAST JCT OF SR 172
TO 0.8 MI EAST OF THE JCT OF SR 172 (TEHAMA CO) FROM 0700 HRS TO 1630 HRS ON
8/19/13 - DUE TO CONSTRUCTION
SR 39
[IN THE SOUTHERN CALIFORNIA AREA]
IS CLOSED 4.5 MI SOUTH OF ISLIP SADDLE (LOS ANGELES CO) - DUE TO
STORM DAMAGE - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
SR 41
[IN THE CENTRAL CALIFORNIA AREA]
IS CLOSED FROM CURBARIL AVE TO SANTA YSABEL AVE /IN ATASCADERO/
(SAN LUIS OBISPO CO) FROM 1700 HRS TO 2030 HRS ON 8/16/13 - DUE TO
A SPECIAL EVENT - A DETOUR IS AVAILABLE
[YOSEMITE NAT'L PARK]
FOR YOSEMITE NAT'L PARK ROAD INFORMATION CALL 209-372-0200
SR 44
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.6 MI EAST OF REDDING
TO DESCHUTES RD /IN PALO CEDRO/ (SHASTA CO) FROM 1900 HRS EACH NIGHT TO
0700 HRS EACH MORNING 7 DAYS A WEEK THRU 8/17/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC FROM 3.5 MI WEST TO 3 MI WEST OF SHINGLETOWN
(SHASTA CO) FROM 0600 HRS TO 1630 HRS MONDAY THRU FRIDAY THRU 8/19/13 -
DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
SR 49
[IN THE CENTRAL CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM FORNI RD TO PATTERSON DR
/IN DIAMOND SPRINGS/ (EL DORADO CO) FROM 2000 HRS EACH NIGHT TO 0500 HRS EACH
MORNING 7 DAYS A WEEK THRU 8/17/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 153
TO MARSHALL RD /IN COLOMA/ (EL DORADO CO) FROM 0700 HRS TO 1900 HRS 7 DAYS
A WEEK THRU 8/17/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 193
/IN COOL/ (EL DORADO CO) TO THE PLACER/NEVADA CO LINE FROM 0700 HRS TO 1700 HRS
MONDAY THRU SATURDAY THRU 8/17/13 - DUE TO MAINTENANCE
US 50
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3 MI EAST OF STRAWBERRY
TO 2 MI EAST OF TWIN BRIDGES (EL DORADO CO) FROM 2000 HRS EACH NIGHT TO
0800 HRS EACH MORNING MONDAY THRU SATURDAY THRU 8/17/13 - DUE TO CONSTRUCTION
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM 2.5 MI
EAST OF MEYERS (EL DORADO CO) TO THE NEVADA STATE LINE FROM 2000 HRS EACH NIGHT
TO 1100 HRS EACH MORNING MONDAY THRU FRIDAY THRU 11/22/13 - DUE TO CONSTRUCTION
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM "F" ST
TO WILDWOOD AVE /IN SOUTH LAKE TAHOE/ (EL DORADO CO) FROM 2000 HRS EACH NIGHT
TO 1100 HRS EACH MORNING SUNDAY THRU FRIDAY THRU 11/22/13 - DUE TO CONSTRUCTION
SR 58
[IN THE CENTRAL CALIFORNIA AREA]
IS CLOSED TO WESTBOUND TRAFFIC FROM THE SAND CANYON INTERCHANGE TO 12.5 MI
WEST OF MOJAVE (KERN CO) 24 HRS A DAY 7 DAYS A WEEK THRU 2300 HRS ON 12/31/13
- DUE TO CONSTRUCTION
[IN THE SOUTHERN CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
SR 70
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC FROM 1.5 MI EAST TO 2 MI EAST OF THE
BUTTE/PLUMAS CO LINE 24 HRS A DAY THRU 2300 HRS ON 11/29/13 - DUE TO
CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2 MI EAST OF
THE BUTTE/PLUMAS CO LINE TO 2.4 MI WEST OF STORRIE (PLUMAS CO) 24 HRS A DAY
7 DAYS A WEEK THRU 2300 HRS ON 9/27/13 - DUE TO CONSTRUCTION - MOTORISTS ARE
SUBJECT TO DELAYS OF UP TO 20 MINUTES
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM 5TH ST
TO 24TH ST /IN MARYSVILLE/ (YUBA CO) FROM 2100 HRS EACH NIGHT TO 0600 HRS
EACH MORNING SUNDAY THRU FRIDAY THRU 1/3/14 - DUE TO CONSTRUCTION - MOTORISTS
ARE SUBJECT TO DELAYS OF UP TO 20 MINUTES
TRACTOR-SEMITRAILER COMBINATIONS OVER 65 FEET & ALL TRACTOR-SEMITRAILER
COMBINATIONS /DOUBLES/ OVER 75 FEET IN TOTAL LENGTH ARE PROHIBITED FROM
13 MI EAST OF THE JCT OF SR 191 TO THE NORTH JCT OF SR 89 /GREENVILLE WYE/
(PLUMAS CO) - ALTERNATE ROUTES ARE AVAILABLE
SR 74
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3.7 MI EAST TO 8.7 MI
EAST OF MOUNTAIN CENTER (RIVERSIDE CO) FROM 1900 HRS EACH NIGHT TO 0500 HRS
EACH MORNING 7 DAYS A WEEK THRU 8/22/13 - DUE TO CONSTRUCTION - MOTORISTS ARE
SUBJECT TO DELAYS OF UP TO 15 MINUTES
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM PINYON DR TO
CAHUILLA WAY /IN PALM DESERT/ (RIVERSIDE CO) FROM 1900 HRS EACH NIGHT TO
0500 HRS EACH MORNING 7 DAYS A WEEK THRU 8/22/13 - DUE TO CONSTRUCTION
- MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 15 MINUTES
SR 78
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.3 MI EAST OF RIPLEY
TO 4.5 MI WEST OF THE JCT OF I 10 (RIVERSIDE CO) FROM 0600 HRS TO 1600 HRS
7 DAYS A WEEK THRU 8/25/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO
DELAYS OF UP TO 30 MINUTES
I 80
[IN THE SAN FRANCISCO BAY AREA - SOLANO CO]
WILL BE CLOSED AT THE SAN FRANCISCO-OAKLAND BAY BRIDGE /IN SAN FRANCISCO/
(SAN FRANCISCO,ALAMEDA CO) 24 HRS A DAY FROM 2000 HRS ON 8/28/13 TO 0500 HRS ON
9/3/13 - DUE TO CONSTRUCTION - MOTORISTS ARE ADVISED TO USE AN ALTERNATE ROUTE
[IN THE NORTHERN CALIFORNIA AREA & SIERRA NEVADA]
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM THE
YOLO/SACRAMENTO CO LINE TO WATT AVE /IN SACRAMENTO/ (SACRAMENTO CO) FROM
2200 HRS EACH NIGHT TO 0500 HRS EACH MORNING 7 DAYS A WEEK THRU 12/10/14
- DUE TO CONSTRUCTION
SR 89
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE NORTHERN CALIFORNIA AREA & SIERRA NEVADA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE
EL DORADO/PLACER CO LINE TO THE JCT OF SR 28 /IN TAHOE CITY/ (PLACER CO)
24 HRS A DAY FROM 0700 HRS MONDAY TO 1000 HRS FRIDAY THRU 10/31/13 -
DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 28 TO
3.2 MI SOUTH OF SQUAW VALLEY RD (PLACER CO) FROM 2200 HRS EACH NIGHT TO
1000 HRS EACH MORNING MONDAY THRU FRIDAY THRU 10/31/13 - DUE TO MAINTENANCE
SR 91
[IN THE SOUTHERN CALIFORNIA AREA]
THE EASTBOUND CONNECTOR TO SOUTHBOUND I 215 /IN RIVERSIDE/ (RIVERSIDE CO)
IS CLOSED FROM 2200 HRS EACH NIGHT TO 0600 HRS EACH MORNING WEDNESDAY THRU
FRIDAY & FROM 2300 HRS FRIDAY TO 0700 HRS SATURDAY THRU 8/24/13 - DUE
TO CONSTRUCTION - A DETOUR IS AVAILABLE
SR 96
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC FROM 8.5 MI EAST TO 9 MI EAST OF SEIAD VALLEY
(SISKIYOU CO) FROM 0630 HRS TO 1830 HRS MONDAY THRU FRIDAY THRU FRIDAY THRU
8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.5 MI EAST TO 1.5 MI
EAST OF HORSE CREEK (SISKIYOU CO) 24 HRS A DAY 7 DAYS A WEEK THRU 2300 HRS ON
10/4/13 - DUE TO CONSTRUCTION - NO WIDE LOADS ARE PERMITTED - ALL VEHICLES
GREATER THAN 10.4 FEET IN WIDTH ARE PROHIBITED
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.5 MI WEST TO 1.5 MI
WEST OF THE JCT OF SR 263 (SISKIYOU CO) FROM 0700 HRS TO 1700 HRS MONDAY THRU
FRIDAY THRU 8/19/13 - DUE TO PERMIT WORK
SR 99
[IN THE CENTRAL CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 3.8 MI NORTH TO
5.7 MI NORTH OF THE JCT OF SR 70 (SUTTER CO) FROM 2100 HRS EACH NIGHT TO
0500 HRS EACH MORNING 7 DAYS A WEEK THRU 8/19/13 - DUE TO CONSTRUCTION
- MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 10 MI NORTH OF CHICO
(BUTTE CO) TO THE BUTTE/TEHAMA CO LINE FROM 1800 HRS EACH NIGHT TO 0600 HRS
EACH MORNING MONDAY THRU SATURDAY THRU 8/17/13 - DUE TO MAINTENANCE
- MOTORISTS ARE SUBJECT TO DELAYS OF UP TO 10 MINUTES
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 1.6 MI NORTH TO
2.6 MI NORTH OF LOS MOLINOS (TEHAMA CO) 24 HRS A DAY 7 DAYS A WEEK THRU 9/20/13
- DUE TO CONSTRUCTION
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM THE
SACRAMENTO/SUTTER CO LINE TO 5 MI SOUTH OF THE JCT OF SR 70 /AT SANKEY RD/
(SUTTER CO) FROM 2100 HRS EACH NIGHT TO 0500 HRS EACH MORNING MONDAY THRU
FRIDAY THRU 8/19/13 - DUE TO CONSTRUCTION
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM THE
JCT OF SR 32 TO EAST 1ST AVE /IN CHICO/ (BUTTE CO) FROM 2100 HRS EACH NIGHT
TO 0700 HRS EACH MORNING MONDAY THRU FRIDAY THRU 12/31/13 - DUE TO CONSTRUCTION
US 101
[IN THE SOUTHERN CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE CENTRAL CALIFORNIA AREA]
THE NORTHBOUND CONNECTOR TO NORTHBOUND & SOUTHBOUND SR 41 /IN ATASCADERO/
(SAN LUIS OBISPO CO) IS CLOSED FROM 1700 HRS TO 2030 HRS ON 8/16/13 - DUE TO
A SPECIAL EVENT - A DETOUR IS AVAILABLE
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM
7.2 MI NORTH OF GREENFIELD TO 2 MI NORTH OF SOLEDAD (MONTEREY CO) FROM
0001 HRS TO 1530 HRS MONDAY THRU THURSDAY & FROM 0001 HRS TO 1200 HRS ON
FRIDAY THRU 2/1/14 - DUE TO CONSTRUCTION
MOTORISTS ARE SUBJECT TO LANE REDUCTIONS IN EACH DIRECTION FROM
1.3 MI NORTH TO 4.3 MI NORTH OF CAMPHORA (MONTEREY CO) FROM 0001 HRS TO
1530 HRS MONDAY THRU THURSDAY & FROM 0001 HRS TO 1200 HRS ON FRIDAY THRU
2/1/14 - DUE TO CONSTRUCTION
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC 0.6 MI SOUTH OF THE JCT OF SR 169 (DEL NORTE CO)
24 HRS A DAY 7 DAYS A WEEK THRU 12/31/13 - DUE TO CONSTRUCTION - MOTORISTS ARE
SUBJECT TO DELAYS OF UP TO 10 MINUTES
SR 104
[IN THE CENTRAL CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 7.5 MI EAST OF HERALD
/AT RANCHO SECO RD/ (SACRAMENTO CO) TO 1.5 MI WEST OF IONE /AT FIVE MILE RD/
(AMADOR CO) FROM 0800 HRS TO 1100 HRS SATURDAY THRU SUNDAY THRU 9/8/13
- DUE TO A SPECIAL EVENT
SR 120
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 12.5 MI EAST TO 13.2 MI
EAST OF GROVELAND (TUOLUMNE CO) 24 HRS A DAY 7 DAYS A WEEK THRU 0700 HRS ON
9/20/13 - DUE TO MAINTENANCE
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF US 395 TO
5.7 MI EAST OF THE JCT OF US 395 (MONO CO) FROM 0700 HRS TO 1700 HRS MONDAY
THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
[YOSEMITE NAT'L PARK]
FOR YOSEMITE NAT'L PARK ROAD INFORMATION CALL 209-372-0200
SR 138
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 173 TO THE
JCT OF SR 18 (SAN BERNARDINO CO) FROM 0800 HRS TO 2000 HRS MONDAY THRU FRIDAY
THRU 8/16/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO
10 MINUTES
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 4.2 MI EAST OF THE
JCT OF SR 173 TO BURNT MILL CANYON RD /IN CRESTLINE/ (SAN BERNARDINO CO) FROM
0700 HRS TO 1700 HRS TUESDAY THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
SR 140
[IN THE CENTRAL CALIFORNIA AREA]
THE EASTBOUND CONNECTOR TO NORTHBOUND SR 99 /IN MERCED/ (MERCED CO)
IS CLOSED 24 HRS A DAY 7 DAYS A WEEK THRU 0900 HRS ON 5/5/14 - DUE TO
CONSTRUCTION - A DETOUR IS AVAILABLE
VEHICLES OVER 45 FEET ARE PROHIBITED & 1-WAY CONTROLLED TRAFFIC FOR ALL
OTHER VEHICLES 20 MI EAST OF MARIPOSA (MARIPOSA CO) 24 HRS A DAY 7 DAYS A WEEK
- DUE TO SLIDE REPAIRS
[YOSEMITE NAT'L PARK]
FOR YOSEMITE NAT'L PARK ROAD INFORMATION CALL 209-372-0200
SR 155
[IN THE CENTRAL CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.5 MI EAST OF DELANO TO
1.1 MI WEST OF THE JCT OF SR 65 (KERN CO) FROM 0600 HRS TO 1800 HRS MONDAY THRU
FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF
UP TO 15 MINUTES
SR 167
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 10 MI EAST OF THE
JCT OF US 395 (MONO CO) TO THE NEVADA STATE LINE FROM 0700 HRS TO 1700 HRS
MONDAY THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
SR 173
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 5.8 MI WEST OF THE
JCT OF SR 18 TO THE JCT OF SR 18 (SAN BERNARDINO CO) FROM 0800 HRS TO 2000 HRS
MONDAY THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT
TO DELAYS OF UP TO 10 MINUTES
IS CLOSED FROM 2 MI EAST OF HESPERIA /AT LAKE ARROWHEAD RD/ TO 8.6 MI WEST
OF THE JCT OF SR 189 /AT RIFLE RANGE RD/ (SAN BERNARDINO CO) 24 HRS A DAY
7 DAYS A WEEK - DUE TO SAFETY CONCERNS - MOTORISTS ARE ADVISED TO USE AN
ALTERNATE ROUTE
SR 189
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 18 TO THE
JCT OF SR 173 (SAN BERNARDINO CO) FROM 0800 HRS TO 2000 HRS MONDAY THRU FRIDAY
THRU 8/16/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF UP TO
10 MINUTES
SR 191
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 70 TO
BUSHMANN RD /IN PARADISE/ (BUTTE CO) FROM 0700 HRS TO 1600 HRS WEDNESDAY THRU
FRIDAY THRU 9/27/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO DELAYS OF
UP TO 10 MINUTES
SR 193
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 49
/IN COOL/ TO GREENWOOD RD /IN GEORGETOWN/ (EL DORADO CO) FROM 0700 HRS TO
1900 HRS 7 DAYS A WEEK THRU 8/24/13 - DUE TO CONSTRUCTION
I 210
[IN THE SOUTHERN CALIFORNIA AREA]
THE EASTBOUND & WESTBOUND CONNECTORS TO NORTHBOUND & SOUTHBOUND I 15
(SAN BERNARDINO CO) ARE CLOSED FROM 2100 HRS ON 8/16/13 TO 0700 HRS ON 8/17/13
- DUE TO CONSTRUCTION - DETOURS ARE AVAILABLE
ALL TRACTOR-SEMI TRAILER COMBINATIONS WITH 3 AXLES OR GREATER ARE
PROHIBITED ON SR 2 FROM THE JCT OF I 210 /IN LA CANADA-FLINTRIDGE/ TO THE
ANGELES FOREST HIGHWAY (LOS ANGELES CO) - ALTERNATE ROUTES ARE AVAILABLE
SR 243
[IN THE SOUTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 74 TO
7.5 MI NORTH OF THE JCT OF SR 74 (RIVERSIDE CO) FROM 0700 HRS TO 1800 HRS
7 DAYS A WEEK THRU 8/22/13 - DUE TO CONSTRUCTION - MOTORISTS ARE SUBJECT TO
DELAYS OF UP TO 15 MINUTES
SR 245
[IN THE CENTRAL CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 4 MI NORTH TO 9 MI
NORTH OF THE JCT OF SR 201 (TULARE CO) FROM 0600 HRS TO 1800 HRS THURSDAY
THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 4.9 MI SOUTH OF THE
TULARE/FRESNO CO LINE TO THE TULARE/FRESNO CO LINE FROM 0600 HRS TO 1800 HRS
THURSDAY THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
I 280
[IN THE CENTRAL CALIFORNIA AREA]
THE NORTHBOUND CONNECTOR TO EASTBOUND & WESTBOUND SR 92 (SAN MATEO CO)
IS CLOSED FROM 1900 HRS EACH NIGHT TO 0600 HRS EACH MORNING THURSDAY THRU
SATURDAY THRU 8/17/13 - DUE TO CONSTRUCTION - A DETOUR IS AVAILABLE
THE NORTHBOUND CONNECTOR TO EASTBOUND I 380 /IN SAN BRUNO/ (SAN MATEO CO)
IS CLOSED FROM 2200 HRS EACH NIGHT TO 0500 HRS EACH MORNING MONDAY THRU THURSDAY
THRU 8/22/13 - DUE TO CONSTRUCTION - A DETOUR IS AVAILABLE
SR 299
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.8 MI WEST TO 1.8 MI
WEST OF DEL LOMA (TRINITY CO) 24 HRS A DAY 7 DAYS A WEEK THRU 1500 HRS ON
8/23/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 0.8 MI EAST TO 1.8 MI
EAST OF DEL LOMA (TRINITY CO) 24 HRS A DAY 7 DAYS A WEEK THRU 2300 HRS ON
11/8/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 2.5 MI EAST OF THE
TRINITY/SHASTA CO LINE TO 19 MI WEST OF REDDING (SHASTA CO) FROM 0600 HRS TO
1900 HRS MONDAY THRU SATURDAY THRU 8/31/13 - DUE TO CONSTRUCTION - MOTORISTS
ARE SUBJECT TO DELAYS OF UP TO 60 MINUTES
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 10 MI EAST OF REDDING
TO ROUND MOUNTAIN (SHASTA CO) FROM 0830 HRS TO 1500 HRS 7 DAYS A WEEK THRU
8/19/13 - DUE TO CONSTRUCTION
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 5.4 MI WEST TO 4.1 MI
WEST OF THE JCT OF US 395 (MODOC CO) FROM 0600 HRS TO 1800 HRS MONDAY THRU
FRIDAY THRU 8/19/13 - DUE TO CONSTRUCTION
US 395
[IN THE SOUTHERN CALIFORNIA AREA]
NO TRAFFIC RESTRICTIONS ARE REPORTED FOR THIS AREA.
[IN THE CENTRAL CALIFORNIA AREA & SIERRA NEVADA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM THE JCT OF SR 167 TO
1.8 MI NORTH OFTHE JCT OF SR 167 (MONO CO) FROM 0700 HRS TO 1700 HRS MONDAY
THRU FRIDAY THRU 8/16/13 - DUE TO CONSTRUCTION
[IN THE NORTHERN CALIFORNIA AREA]
1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 5.5 MI SOUTH OF THE
JCT OF SR 36 TO THE JCT OF SR 36 (LASSEN CO) FROM 0700 HRS TO 1800 HRS MONDAY
THRU FRIDAY THRU 8/26/13 - DUE TO CONSTRUCTION
site logo
STATE OF NEVADABy Phone: 511/1-877-NV-ROADS HOMEABOUT
NDOTNEWSCAREERSDOCUMENTSSITE MAP
511 HOMETRAFFICTRAVEL LINKSSAFETY LINKSABOUT 511 NEVADASUGGESTIONS
MAP TOOLS
Incident Icon Incidents
Congestion Icon Congestion
Construction Icon Construction
Detour Icon Detour
Weather Icon Weather
Special Events Icon Special Events
Camera Icon Cameras
Dynamic Message Sign Icon Dynamic Message Signs
Road Weather Information System Icon Road Weather Information Systems
Rest Area Icon Rest Areas
Welcome Center Icon Welcome Centers
Truck Parking Icon Truck Parking
Live Traffic Speed
Free Flow Icon Free Flow
Medium Traffic Icon Moderate Traffic
Heavy Traffic Icon Heavy Traffic
Stop and Go Icon Stop and Go
No Information Icon No Information
Quick Views
State View
Las Vegas
Reno
Elko
Carson City
Road Weather Information System Link to Map Display Link to
Help/Information Station Listing For:
Nevada Reno Area (N.West NV) Elko Area (N.East NV) Las Vegas Area (Southern NV)
Atmospheric Readings
Station Info Gauge Display
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 0 SW 0 SW 84 12 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:17 PM 12 WSW 22 W 81 10 20 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:17 PM 14 WSW 20 W 82 10 19 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:10 PM 4 WSW 5 WNW No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:14 PM 11 WSW 21 WNW 82 14 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 3:22 PM 12 SSW 17 WSW 92 9 25 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:09 PM 8 SW 15 NNE 91 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:59 PM 6 NNE 12 SSE 90 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/15/2013 11:56 PM 0 SSW 1 NW 70 14 19 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:09 PM 5 E 17 WSW 90 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 1:18 PM 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:09 PM 12 NNE 20 ESE 91 32 57 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 9 W 13 N 85 9 21 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:10 PM 11 WNW 15 W 86 10 23 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 5 WNW 9 NW 90 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:59 PM 9 W 15 N 93 7 19 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:02 PM 11 SW 16 SW 90 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 6 SSE 13 WSW 81 13 26 err 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 7 ESE 12 S 93 10 30 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:42 PM 14 WSW 20 W 91 7 19 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:12 PM 9 W 18 NNW 89 9 23 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:52 PM 11 NNW 15 N 93 11 31 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:10 PM 13 NW 20 N 89 7 19 No 0
Information Button to Display Station Information Gauge
Image 9/22/2010 7:21 PM
Information Button to Display Station Information Gauge
Image 11/9/2010 9:00 AM
Information Button to Display Station Information Gauge
Image 7/24/2013 7:37 AM
Information Button to Display Station Information Gauge
Image 11/5/2010 5:21 AM
Information Button to Display Station Information Gauge
Image 8/16/2013 6:02 PM 4 W 12 NE 80 13 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 8 NNW 20 ENE 88 10 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 11 W 19 NNW 87 10 24 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:59 PM 11 NW 19 NNW 84 20 38 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:00 PM 5 SSE 12 WSW 74 20 31 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:24 PM 2 SSW 5 NW 78 30 43 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:02 PM 3 WNW 6 WNW 74 21 32 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:15 PM 8 SSE 15 SW 82 13 27 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 12 WSW 22 WNW 78 9 15 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:10 PM 14 W 24 NW 86 11 25 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:03 PM 11 W 17 NW 80 12 23 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:05 PM 4 ENE 9 WSW 71 12 16 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:07 PM 5 SW 12 NW 68 16 21 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:05 PM 0 SSW 0 NNW 75 15 24
Information Button to Display Station Information Gauge
Image 8/16/2013 5:37 PM 11 SW 23 W 64 18 19 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:46 PM 0 S 0 N 90 9 23 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:09 PM 14 WNW 23 NNW 82 10 21 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:07 PM 17 WSW 24 W 84 13 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:11 PM 16 SSE 22 SSW 81 13 24 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:11 PM 8 SSW 17 W 87 9 22 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:07 PM 12 NW 21 NNE 85 11 24 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:16 PM 18 WSW 25 WSW
Information Button to Display Station Information Gauge
Image 8/16/2013 6:12 PM 13 WSW 24 WNW No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:17 PM 13 WSW 19 W 78 10 18 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:38 PM 14 SW 20 W 87 11 25 No 0
Information Button to Display Station Information Gauge
Image 8/14/2013 1:41 AM 4 SE 5 SE 58 34 30 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:09 PM 9 W 17 NNW 73 23 33 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:40 PM 7 SW 13 WNW 85 10 21 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:57 PM 6 SW 14 NNW 77 21 34 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:01 PM 5 SSW 13 W 81 14 27 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 9 SW 17 WSW 86 11 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:43 PM 9 N 20 NE 83 12 25 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:44 PM 5 S 14 NNW 81 14 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:03 PM 7 NNE 13 ENE 90 11 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 10 WSW 24 NNW 78 14 25 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:13 PM 7 SW 18 NW 71 20 27 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:54 PM 14 SW 24 W 91 8 21 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:58 PM 14 WSW 22 WNW 84 12 27 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:49 PM 3 NNE 6 SSW 77 31 44 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:14 PM 11 SW 22 W 85 12 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:06 PM 5 S 11 WNW 82 16 32 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:23 PM 9 S 15 W 84 12 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:08 PM 3 S 7 NW 83 14 29 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:51 PM 5 SW 14 WNW 84 13 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:01 PM 10 SW 16 WNW 86 13 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:33 PM 4 SW 11 N 92 10 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:17 PM 11 WSW 19 W 88 11 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:04 PM 10 SW 16 WSW 87 12 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:40 PM 14 ESE 29 WSW
Information Button to Display Station Information Gauge
Image 8/16/2013 5:43 PM 6 SSE 16 NW
Information Button to Display Station Information Gauge
Image 8/16/2013 6:11 PM 11 WSW 18 W 90 11 29 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 5:59 PM 0 S 0 S 86 11 26 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:00 PM 9 WNW 13 NW 87 12 29 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:13 PM 8 W 17 NW 86 19 39
Information Button to Display Station Information Gauge
Image 8/16/2013 6:17 PM 12 NNE 17 NE 90 10 28 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:05 PM 4 SE 13 SW 87 16 36 No 0
Information Button to Display Station Information Gauge
Image 8/16/2013 6:11 PM 10 NNW 14 N 93 11 32 No 0
End of RWIS Station List
Data is subject to change. For weather forecasts, use the following links:
National Weather Service Office
Nevada State Information from IWIN
Disclaimer:
NDOT provides the foregoing information as a public service. This
information is published automatically and cannot be guaranteed as to
accuracy or timeliness. This information depends on a number of items,
including Internet availability, communications networks, and computer
equipment which are beyond the control of the NDOT and difficult to
predict.
Listing of roadway snow and ice conditions is not a guarantee that
NDOT has plowed or sanded all of these locations for travelers.
Plowing and sanding is generally done to different roads on a basic
priority system but that the actual determination of the amount and
timing of sanding and plowing of any particular section of highway is
up to the judgment of local road maintenance officials based on their
experience and local conditions at particular times.
Weather and road conditions change rapidly, and drivers are in the
best position to perceive such conditions and adjust their driving
accordingly. Those relying on the foregoing information do so at their
own risk, and neither the State of Nevada, the NDOT nor any of their
employees or agents shall be liable for either the accuracy of this
information nor any actions taken in reliance thereon.
NEVADA DEPARTMENT OF TRANSPORTATION
1263 South Stewart Street, Carson City Nevada 89712
Telephone: 775-888-7000 TTY: 1-855-878-NDOT (6368)
Email: info@dot.state.nv.us Visit NV.gov
Street Location Start Date End Date Issue
8th Street Between Charleston Blvd & Gass Ave 7/9/2013 10/31/2013 Building
Street Closure Bonneville Avenue Between Las Vegas Blvd & Maryland
Pkwy 6/26/2013 8/30/2013 Storm Drain)
Street Disruption Desert Foothills Drive At Alta
Drive 2/6/2013 8/22/2014 Intersection Build
Street Closure F Street Between Bonanza Rd & D
St 8/1/2013 8/1/2014 Bridge Construction
Street Closure Fremont Street Between 6th St & Las Vegas
Blvd 12/16/2011 6/4/2012 Fremont East (Weekends)
Martin L King Boulevard At Oakey Blvd 7/8/2013 9/16/2013 Storm Drain
Street Closure Mello Lane Between Bradley Road & Jones
Blvd 4/15/2013 9/30/2013 Bridge Build
Street Disruption Alta Drive Between Hualapai Wy & C.C.
215 Landscaping (Indefinite)
Alta Drive Between Valley View Blvd & Decatur Blvd 3/23/2013 8/23/2013 Gas
Street Disruption Anasazi Drive Between Lake Mead Blvd & Town Center
Dr Landscaping Maintenance (Indefinite)
Bonneville Avenue Between Main Street and Martin L King
Blvd 7/29/2013 12/31/2013 Landscaping / Maintenance
Street Disruption Bonneville Avenue Between Main St & Martin L King
Blvd 8/9/2013 10/8/2013 Concrete Repair
Bonneville Avenue Between Las Vegas Blvd & Maryland
Pkwy 1/28/2013 1/28/2014 street improvements
Buffalo Drive Between Lake Mead Blvd & Smoke Ranch Rd 5/15/2013 9/15/2013 Gas
Street Disruption Canyon Run Drive Between Town Center Dr & Rampart
Blvd Landscaping (Indefinite)
D Street Between Washington Ave & Owens Ave 3/22/2013 10/31/2013
Grand Central Parkway Between Charleston Blvd & City
Parkway 7/29/2013 12/31/2013 Landscaping / Maintenance
Street Disruption Hills Center Drive Between Village Center Cir & Lake
Mead Blvd Landscaping (Indefinite)
Street Disruption Hualapai Way Anasazi Dr & Town Center
Dr Landscaping (Indefinite)
Street Disruption Hualapai Way Between Charleston Blvd & Town Center
Dr Landscaping (Indefinite)
Street Disruption Jones Boulevard Between U.S. 95 and Sahara
Ave 10/31/2011 8/24/2013 Road Widening
Jones Boulevard At C.C. 215 5/15/2013 11/15/2013 Bridge Build
Street Disruption Lake Mead Boulevard Between Anasazi Dr & Town Center
Dr Landscaping Maintenance (Indefinite)
Street Disruption Lake Mead Boulevard Between Buffalo Dr & Rancho
Drive 6/15/2013 8/30/2013 Sewer Lining
Street Disruption Las Vegas Blvd Between Stewart Ave & US
95 7/11/2013 9/2/2013 Sidewalk & Paving
Main Street Between Clark Ave & Lewis Ave 7/9/2013 8/3/2013 sign
maintenance / landscaping
Street Disruption Martin L King Boulevard Between Bonneville Ave &
Symphony Parkway 8/12/2013 9/12/2013 Building Demo
Street Disruption Ogden Ave Between Las Vegas Blvd &
Main 4/15/2013 8/30/2013 Streetscape Improvements
Pavillion Center Drive At Regal Mesa 7/22/2013 8/22/2013 Island Work (CLV)
Street Disruption Rampart Boulevard at Cheyenne Ave Landscaping (Indefinite)
Street Disruption Stewart Ave Between Las Vegas Blvd &
Main 4/15/2013 6/30/2013 Streetscape Improvements
Street Disruption Tenaya Way Between Whispering Sands & Grand Teton
Drive 6/12/2013 9/30/2013 Road & Utilities Build
Street Disruption Torrey Pines Between Celeste Ave & Clarice
Ave 8/5/2013 9/5/2013 Building & Sidewalk Construction
Street Disruption Town Center Drive Between Charleston Blvd &
Summerlin Pkwy Landscaping (Indefinite)
Street Disruption Town Center Drive Between Summerlin Pkwy & Village
Center Circle Landscaping (Indefinite)
Valley View Boulevard Between US95 & Desert Inn
Rd 10/31/2011 8/30/2013 Road Widening
Vegas Drive Between Rancho Dr & Jones Blvd 1/15/2013 1/31/2014 street
improvements
Street Distruption Vegas Drive Between Rampart Blvd & Buffalo
Dr Landscaping (Indefinite)
Wyoming Avenue Between Industrial Rd & Martin L King
Blvd 7/8/2013 9/16/2013 Storm Drain
AMBER ALERT
AMBER ALERT
MISSING, ENDAGERED, PARENTAL ABDUCTION FROM ELKO, NV 8/14/13.
VICTIMS: Lilly Anna Ramires 9 yrs old. AND Martin Angel Rosales II 3
yrs old. Suspects: Martin Cisneras Rosales (AKA Martin Cisneros) 34
yrs old AND Amber Schenck 20 yrs old, 5'9'', 150 lbs, Sandy hair, blue
eyes. Possible Vehicle: Dark Blue Muistang with Possible Nebraska
plates or a temporary plate. Unknown year, but believed to be a late
80's to early 90's model. If you believe you have any information,
please call Elko Police Department at 775-777-7310, or 911.
Northwest Oregon Road Conditions by Route
Hwy100 MP 0 To 4
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures with
flaggers Motorists can expect daytime lane closures throughout the
project area with flaggers directing traffic between 7 a.m. and 5
p.m., Monday through Friday, for guardrail replacement. This project
will replace seven sections of old guardrail on the Historic Columbia
River Highway (U.S. 30) between the Troutdale Bridge over the Sandy
River and Dabney State Park. The new guardrail will look just like the
historic, white double-rail sections that are being replaced.
Updated: 07/26/2013 8:24 pm
I-5 MP 271.6 To 274.69
Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective
August 26, 2013, this section of I-5 will be restricted to 17 feet 01
in. in height. In addition, the on- and off-ramps to/from I-5
northbound and southbound Exit 271 to OR214 and OR219 will be
restricted to 16 feet 00 in. in width. Mobile homes with eaves are
allowed, provided the base width does not exceed 16 feet 00 in. in
width. Estimated date of completion is September 30, 2016.
Updated: 08/16/2013 10:00 am
I-5 MP 271.69 To 274.69
Informational only; Commercial Vehicle Information
Details: I-5 MP 271.35 to MP 276.01 NB & SB (Woodburn) Effective
August 26, 2013, this section of I-5 will be restricted to 17 feet 01
in. in height. In addition, the on- and off-ramps to/from I-5
northbound and southbound Exit 271 to OR214 and OR219 will be
restricted to 16 feet 00 in. in width. Mobile homes with eaves are
allowed, provided the base width does not exceed 16 feet 00 in. in
width. Estimated date of completion is September 30, 2016.
Updated: 08/16/2013 10:00 am
I-5 MP 283.88
OFF RAMP
No to Minimum Delay; Construction Work
Comments: None anticipated this week. This project is nearly complete.
For more information: Ramps Affected. Work is under way on a project
to improve safety on Wilsonville Road at the I-5 interchange. The
contractor will expand Wilsonville Road from six to eight lanes near
the I-5 interchange, improve the I-5 on- and off-ramps, and add
landscaping and bicycle and pedestrian facilities.
Updated: 07/26/2013 7:36 pm
I-5 MP 286.52
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from WB Elligsen Rd (North Wilsonville)
Effective September 6, 2013, the ramp from Elligsen Rd westbound to
I-5 northbound will be closed between the hours of 9 PM & 6 AM
(NIGHTTIME). Estimated date of completion is September 7, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 289.27
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Nyberg St (Tualatin) Effective August 23,
2013, the ramp from Nyberg St to I-5 southbound will be closed between
the hours of 9 PM & 6 AM. Estimated date of completion is August 24,
2013.
Updated: 08/16/2013 10:00 am
I-5 MP 290.75
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Lower Boones Ferry Rd and Bridgeport Rd
(Tualatin) Effective August 26, 2013, the ramp from Lower Boones Ferry
Rd and Bridgeport Rd to I-5 northbound will be closed between the
hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.86
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from OR217 SB (Tigard) Effective August 26,
2013, the ramp from OR217 southbound to I-5 southbound will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is September 6, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.89
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August
19, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound
will be intermittently closed between the hours of 11 PM & 5 AM
(NIGHTTIME). Estimated date of completion is October 25, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 292.56
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 292 to OR217 / Kruse Way (Tigard) Effective
August 26, 2013, the ramp from I-5 southbound Exit 292 will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 293.28
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 293 ramp to Haines St (Tigard) Effective
September 6, 2013, the ramp from I-5 southbound Exit 293 to Haines St
will be closed between the hours of 9 PM & 6 AM (NIGHTTIME). Estimated
date of completion is September 7, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.04 To 299.25
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramp from OR43/Hood St to SB I-5 will be
intermittently closed during the same times. Estimated date of
completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.041 To 298.93
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd &
OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the
same times. Estimated date of completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 297.55
Informational only; Commercial Vehicle Information
Details: I-5 SB MP 298.04 to MP 297.81 (Portland) Effective August 21,
2013, this section of I-5 southbound will be restricted to 12 feet 00
in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 298.48 To 297
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder
(Northbound) Median , All Lanes , Shoulder
Comments: The speed limit on I-5 is reduced to 50 mph in the work
area. This speed reduction is in effect 24 hours a day and will remain
in place. This project replaces a viaduct on I-5 that crosses a ravine
at SW Iowa Street, between Terwilliger Boulevard (exit 297) and
Corbett Avenue (exit 298) in Portland, and includes building a
temporary detour bridge on the west side of I-5.
Updated: 07/26/2013 7:36 pm
I-5 MP 299.52
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299B ramp to I-405 NB (Portland) Effective July
29, 2013, the ramp from I-5 northbound Exit 299B to I-405 northbound
will be restricted to 14 feet 00 in. in width bewteen the hours of 8
PM & 5 AM. Estimated date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 299.9 To 300.36
Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299.90 to MP 300.36 (Marquam Bridge - Portland)
Effective July 29, 2013, this section of I-5 northbound will be
restricted to 14 feet 00 in. in width, and 15 feet 11 in. in height
between the hours of 8 PM & 5 AM. Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 300.271
Informational only; Commercial Vehicle Information
Details: I-5 SB ramp to I-405 NB (Portland) Effective July 29, 2013,
the ramp from I-5 southbound to I-405 northbound will be 14 feet 00
in. in width between the hours of 8 PM & 5 AM. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 301.911
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 301 ramp to I-84 EB (Portland) Effective August
13, 2013, the ramp from I-5 southbound Exit 301 to I-84 eastbound will
be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 305.93
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Columbia Blvd (North Portland) Effective
August 25, 2013, the ramp from Columbia Blvd to I-5 southbound will be
closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date
of completion is August 27, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 0 To 8
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. None
anticipated this week. Preliminary schedule of weekend closures
(weather dependent): � Fri., July 12 (10 p.m.) to Mon., July 15 (5
a.m.): I-84 eastbound closed from I-205 to I-5 � Fri., July 19 (10
p.m.) to Mon., July 22 (5 a.m.): I-84 westbound closed from I-5 to
I-205 � Sat. Aug. 3 (11 p.m.) to Mon. Aug. 5 (5 a.m.): I-84 westbound
closed from I-5 to I-205 Project Description: This project will grind
and pave all lanes on I-84 between I-5 and I-205, pave most of the on
and off ramps, replace freeway signage, restripe the I-84 westbound
merge with I-5 and pave and repair the NE Halsey Street overpass at
82nd Avenue and I-84. This project will require several weekend
directional full closures of I-84 and full nighttime closures of I-84
and Halsey Street to complete.
Updated: 08/05/2013 05:27 am
I-84 MP .02 To 5.78
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP .07 To 5.79
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 5.41
Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 6 ramp to I-205 SB (Portland) Effective August
15, 2013, the ramp from I-84 eastbound Exit 6 to I-205 southbound will
be closed. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 5.44 To 6.59
Informational only; Commercial Vehicle Information
Details: I-84 MP 5.42 to MP 6.60 EB (Portland) Effective April 29,
2013, this section of I-84 eastbound will be restricted to 12 feet 00
in. in width, and 18 feet 00 in. in height on Sunday - Thursday nights
between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp
from I-84 eastbound Exit 7 to Halsey St will be intermittently closed
during the same hours. Estimated date of completion is November 5,
2013.
Updated: 08/16/2013 10:00 am
I-84 MP 6.29
Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 8 ramp to I-205 NB (Portland) Effective August
27, 2013, the ramp from I-84 eastbound Exit 8 to I-205 northbound will
be intermittently closed between the hours of 10 PM & 5 AM
(NIGHTTIME). Estimated date of completion is September 12, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 7 To 8
ON RAMP
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: None anticipated this week. Ramps Affected. Project
Description: This project will improve congestion and safety by adding
a new "auxiliary" lane to the two-lane section of I-84 eastbound
between Halsey Street (exit 7) and I-205 northbound (exit 8).
Updated: 07/26/2013 7:41 pm
I-84 MP 15.19
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder
Comments: There will be occasional daytime shoulder closures this week
for various work activities. Project Description: This project will
install a new electronic variable message sign on I-84 westbound near
NE 223rd/Fairview Avenue in Fairview.
Updated: 07/26/2013 7:45 pm
I-84 MP 17
No to Minimum Delay; Construction Work
Comments: There will be occasional daytime and nighttime single lane
closures on Marine Drive southbound, just north of the North Frontage
Road for various work Project Description: This project will install
new electronic variable message signs on 257th Avenue just north of
the factory outlet mall and on Marine Drive just north of the North
Frontage Road in Troutdale. The new signs will help alert motorists to
traffic problems on I-84 before they get on the freeway.
Updated: 07/26/2013 7:48 pm
I-84 MP 17.37 To 18.06
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this
section of I-84 will be restricted to 16 feet 00 in. in width between
the hours of 9 PM & 7 AM. Estimated date of completion is November 30,
2014.
Updated: 08/16/2013 10:00 am
I-84 MP 17.65
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: Traffic on I-84 has been shifted to a new temporary
alignment and the speed limit is reduced to 50 mph. Project
Description: This project replaces two bridges on I-84 over the Sandy
River east of exit 17 in Troutdale, and repairs two bridges over
Jordan Road east of the Sandy River at exit 18.
Updated: 07/26/2013 7:51 pm
I-84 MP 17.68
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge - Troutdale) I-84 WB
crossing the Sandy River Bridge is restricted to single trip permits
beyond Weight Table 5.
Updated: 08/16/2013 10:00 am
I-84 MP 17.82
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective
September 1, 2010, the Jordan Rd underpass at Exit 18 will be
restricted to 13 feet 00 in. in width. This restriction is NOT on the
I-84 mainline. Effective April 15, 2013, the height will be restricted
to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date
of completion is November 1, 2014.
Updated: 08/16/2013 10:00 am
I-84 MP 18
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: Expect alternating one-way traffic controlled by temporary
signals on Jordan Road at I-84. Please obey parking restrictions in
this area. Project Description: This project replaces two bridges on
I-84 over the Sandy River east of exit 17 in Troutdale, and repairs
two bridges over Jordan Road east of the Sandy River at exit 18.
Traffic Impacts: None anticipated this week. For more information:
Updated: 07/26/2013 8:25 pm
I-84 MP 18.15 To 17.37
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this
section of I-84 will be restricted to 16 feet 00 in. in width between
the hours of 9 PM & 7 AM. Estimated date of completion is November 30,
2014.
Updated: 08/16/2013 10:00 am
I-84 MP 22.1 To 47.62
Informational only; Commercial Vehicle Information
Details: I-84 MP 22 to MP 49 EB & WB (east of Portland) Effective
September 9, 2013, this section of I-84 will be restricted to 16 feet
00 in. in width between the hours of 7 AM & 4 PM (DAYTIME). In
addition, the height will be restricted to 16 feet 05 in. in height
eastbound, and 16 feet 03 in. in height westbound during the same
time. Estimated date of completion is September 19, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 31.39
No to Minimum Delay; Construction Work
Comments: No traffic impacts. Motorists can expect to see the parking
lot lighting continuously on day and night for seven days for testing.
Project Description: This project will install a new "Parking
Management System" at Multnomah Falls that will help prevent traffic
from backing up onto I-84 when the parking lot is full during busy
weekends at this popular attraction. The project will also install
lighting in the parking lot.
Updated: 07/26/2013 7:59 pm
I-84 MP 35 To 44
Estimated delay under 20 minutes; Construction Work
Comments: The right and left lanes of I-84 eastbound near exit 35 and
the right or left lane of I-84 westbound at milepost 35 will close
intermittently. Project Description: This project will replace the
driving surface on four bridges on I-84 between exit 35
(Dodson/Ainsworth State Park) and exit 44 (Cascade Locks/Bridge of the
Gods) in the Bonneville Dam area. The bridges being resurfaced are:
I-84 westbound at Dodson, just west of exit 35 I-84 eastbound at
Dodson, just west of exit 35
Updated: 07/26/2013 7:55 pm
I-84 MP 35.14 To 35.23
Informational only; Commercial Vehicle Information
Details: I-84 MP 35 EB & WB (Dodson) Effective July 8, 2013, this
section of I-84 will be restricted to 10 feet 00 in. in width per the
following schedule: Monday - Thursday nights between the hours of 6 PM
& 6 AM; Friday - Sunday nights between the hours of 8 PM & 6 AM. In
addition, the I-84 eastbound Exit 35 off-ramp to Dodson/Ainsworth
State Park and the I-84 westbound on-ramp from Dodson/Ainsworth State
Park will be intermittently closed at the same time. Estimated date of
completion is August 15, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 35.16 To 35.31
Informational only; Commercial Vehicle Information
Details: I-84 MP 35 EB & WB (Dodson) Effective July 8, 2013, this
section of I-84 will be restricted to 10 feet 00 in. in width per the
following schedule: Monday - Thursday nights between the hours of 6 PM
& 6 AM; Friday - Sunday nights between the hours of 8 PM & 6 AM. In
addition, the I-84 eastbound Exit 35 off-ramp to Dodson/Ainsworth
State Park and the I-84 westbound on-ramp from Dodson/Ainsworth State
Park will be intermittently closed at the same time. Estimated date of
completion is August 15, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 37
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: The right lane of I-84 eastbound near exit 37 and the right
or left lane of I-84 westbound at milepost 39 will close
intermittently Project Description: This project constructs a new
1.6-mile section of the Historic Columbia River Highway State Trail
adjacent to I-84, between John B. Yeon State Park and Moffett Creek.
Updated: 07/26/2013 8:03 pm
I-84 MP 37.12 To 38.98
Informational only; Commercial Vehicle Information
Details: I-84 MP 36.75 to MP 39 EB & WB Effective September 6, 2012,
this section of I-84 is restricted to 19 feet 00 in. in width
Monday-Friday between the hours of 7:30 AM & 5:30 PM. Estimated date
of completion is October 1, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 10.83 To 12.94
Informational only; Commercial Vehicle Information
Details: I-205 NB MP 10.83 to MP 12.94 (Clackamas) Effective August
18, 2013, this section of I-205 northbound will be closed between the
hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is
August 20, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 18.89 To 21.49
Informational only; Commercial Vehicle Information
Details: I-205 NB MP 18.89 to MP 21.49 (Portland) Effective August 20,
2013, this section of I-205 northbound will be closed between the
hours of 12:01 AM & 4 AM (NIGHTTIME). Estimated date of completion is
August 21, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 19.61
No to Minimum Delay; Construction Work
Comments: There will be intermittent daytime impacts to path users on
the north side of Division Street this week. Project Description: This
project will build a new section of the I-205 Multi-Use Path that will
split off from the existing path approximately 360 feet north of SE
Division Street, cross under Division Street next to the MAX Green
Line and reconnect with the multi-use path at the north end of the
Division Street Max stop. This new route will offer path users a
non-stop connection through Division Street, without the need to wait
for the signal at the crosswalk.
Updated: 07/26/2013 8:08 pm
I-205 MP 23.02 To 24.92
Informational only; Commercial Vehicle Information
Details: I-205 MP 23 to MP 25 NB (Portland) Effective June 12, 2013,
this section of I-205 northbound will be restricted to 17 feet 00 in.
in width, and 16 feet 10 in. in height between the hours of 10 PM & 5
AM (NIGHTTIME). Estimated date of completion is September 19, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 24.5
Estimated delay under 20 minutes; Construction Work
Comments: This week, motorists can expect daytime lane closures at the
Airport Way/I-205 ramps in both directions at, from 8 a.m. to 2 p.m.
Project Description: This project will help improve traffic flow at
this busy interchange by constructing a new free-flowing on ramp from
Airport Way westbound onto I-205 northbound. Motorists on Airport Way
eastbound will have two left turn lanes onto I-205 northbound and will
no longer have to share signal time with westbound motorists on
Airport Way.
Updated: 07/26/2013 8:05 pm
I-205 MP 24.92
Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April
1, 2013, the ramp from Airport Way to I-205 northbound will be
restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height
between the hours of 7 PM & 2 PM. No restrictions will be in place
between 2 PM & 7 PM. Beginning June 18, 2013, these restrictions will
be in place at all hours. Estimated date of completion is December 31,
2013.
Updated: 08/16/2013 10:00 am
I-405 MP 0
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 SB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 southbound will be restricted to
14 feet 00 in. in width between the hours if 8 PM & 5 AM. Estimated
date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-405 MP .77 To .8
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 northbound will be restricted to
14 feet 00 in. in width, and 15 feet 05 in. in height between the
hours of 8 PM & 5 AM. In addition, the ramp from SW 5th St to I-405
southbound will be closed during the same time. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
ORE6 MP .75 To 2.52
Estimated delay under 20 minutes; Construction Work
Comments: OR6 @ Wilson River Loop Road, flaggers are controlling
traffic, expect delays and drive with caution. This project consists
of rebuilding the roadway at the intersection of Wilson River Highway
and Wilson River Loop Road just east of Tillamook. The scheduled work
includes construction of the new roadway. Flaggers will control single
lane traffic during construction activities as required. Expect delays
of up to 20 minutes and drive through the area with caution. Oregon
State Police will be enforcing the speed limit through the work zone
area. The project is scheduled to be completed in October 2013.
Updated: 03/27/2013 09:56 am
ORE8 MP 11.28 To 14.66
Informational only; Commercial Vehicle Information
Details: OR8 MP 11.28 to MP 14.66 EB & WB (Hillsboro) Effective June
1, 2013, this section of OR8 will be restricted to 10 feet 00 in. in
width between the hours of 6 PM & 6 AM, and 14 feet 00 in. in width
between the hours of 9 AM & 3 PM. Estimated date of completion is
September 30, 2013.
Updated: 08/16/2013 10:00 am
ORE8 MP 11.28 To 14.66
Estimated delay under 20 minutes; Construction Work
Comments: A paving and utility project is underway with daytime and
nighttime lane closures. ODOT and City of Hillsboro are partnering on
a paving and utility improvement project on Tualatin Valley (TV)
Highway (OR 8) between Minter Bridge Road and 331st Avenue. Work on TV
Highway involves grinding, reconstructing, paving and restriping;
significantly upgrading the City�s water and storm water systems;
improving more than 100 ADA ramps (accessible curb ramps); and
repairing and paving the Dairy Creek Bridge. Traffic Impacts: From
Monday, July 29nd through Friday, August 2nd there will be
intermittent daytime lane closures on TV Highway/Baseline Street/Oak
from 6 a.m. to 3 p.m. on Monday for installation of sidewalk ramps,
under deck bridge work, utility trench repairs, and installation of
erosion control devices. Nighttime lane closures on OR 8, Monday �
Friday, from 7 p.m. to 6 a.m. for utility work, restriping, waterline
work, sewer replacement, .and pavement removal. Expect the area from
11th St. to Maple in Hillsboro to be very noisy at night for sewer
replacement. There will be temporary sidewalk ramp closures at
Baseline Street and Main Street and at 17th Avenue.
Updated: 07/26/2013 4:39 pm
ORE18 MP 51.57
Informational only; Commercial Vehicle Information
Details: OR18 MP 51.57 Yamhill River near Dayton MP 51.57 Yamhill
River Bridge near Dayton is restricted to 20,000 lbs. single axle,
34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2 Divisible
loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs.
GVW., Weight Table 3 Non-Divisible loads
Updated: 08/16/2013 10:00 am
ORE22 MP 1.29 To 2.12
Informational only; Commercial Vehicle Information
Details: OR22 EB MP 1.28 to MP 2.63 (east of Salem) Effective March
18, 2013, this section of OR22 eastbound will be restricted to 16 feet
00 in. in width, and 17 feet 04 in. in height during the following
times: Monday-Thursday from 12:01 AM to 3 PM, and from 6 PM to
midnight; Friday from 12:01 AM to 3 PM. Estimated date of completion
is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 1.38 To 2.08
Informational only; Commercial Vehicle Information
Details: OR22 WB MP 2.63 to MP 1.28 (east of Salem) Effective March
18, 2013, this section of OR22 westbound will be restricted to 16 feet
00 in. in width, and 17 feet 04 in. in height. Estimated date of
completion is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 1.6 To 5.2
Estimated delay under 20 minutes; Construction Work
Comments: The speed has been reduced to 45 mph in the construction
zone. Law enforcement is providing extra patrols on the project. This
project will improve the vertical clearance over the highway at four
overcrossings and resurface the highway between I-5 and Joseph Street.
At the Lancaster Avenue (MP 1.9) and Cordon Road (MP 2.8)
overcrossings the work will consist of lowering the highway
approximately 3 feet. The work will be done in stages. The 72nd Avenue
(MP 5.9) and Albus Road (MP 10.0) overcrossings will be raised
approximately 3 feet. The highway will be resurfaced between I-5 (MP
1.7) and Joseph Street (MP 5.2). This resurfacing will correct
drainage issues on the highway in this section. Starting on August 19,
traffic on OR22 between the Deer Park/Gaffin Road interchange and
Joseph Street will be down to one lane in each direction until the
completion of paving on Friday, September 13. In addition, the Deer
Park/Gaffic Road eastbound on ramp and Joseph Street westbound on ram
will be closed during this time period. However, all lanes on OR 22
will be open during the Labor Day weekend. The detour for the Deer
Park/Gaffin ramp closure is Ganon Drive to 71st Street to Joseph
Street to OR22 and for the Joseph Street closure is to 71st Street to
Ganon Drive to OR22.
Updated: 08/15/2013 10:40 am
ORE22 MP 3.81
Informational only; Commercial Vehicle Information
Details: OR22 EB on-ramp from Deer Park Rd (East of Salem) Effective
August 21, 2013, the ramp from Deer Park Rd to OR22 eastbound will be
closed. Estimated date of completion is September 16, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 3.99 To 5.44
Informational only; Commercial Vehicle Information
Details: OR22 MP 3.90 to MP 5.44 EB & WB (East of Salem) Effective
August 19, 2013, this section of OR22 will be restricted to 14 feet 00
in. in width. Mobile homes with eaves are allowed, provided the base
width does not exceed 14 feet 00 in. in width. No restrictions will be
in place between August 29, 2013 and September 2, 2013. Estimated date
of completion is September 16, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 5.21
Informational only; Commercial Vehicle Information
Details: OR22 WB on-ramp from Joseph St (East of Salem) Effective
August 21, 2013, the on-ramp from Joseph St to OR22 westbound will be
closed. Estimated date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 5.7 To 6.1
Estimated delay under 20 minutes; Construction Work
Comments: Expect work on the shoulders. 72nd Ave. over Highway 22
closed June 17 through August 15. Use Aumsville Highway and Joseph
Street as a detour.
Updated: 07/25/2013 1:56 pm
ORE22 MP 10.49
Informational only; Commercial Vehicle Information
Details: OR22 MP 10.49 Louie Creek Bridge OR22 Louie Creek Bridge at
MP10.49 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem
axle; Weight Table 3 only.
Updated: 08/16/2013 10:00 am
ORE22 MP 10.66
Informational only; Commercial Vehicle Information
Details: OR22 MP 10.66 Louie Creek Bridge OR22 Louie Creek Bridge at
MP10.66 is restricted to 21,500 lbs. single axle, 43,000 lbs. tandem
axle; Weight Table 3 only.
Updated: 08/16/2013 10:00 am
ORE22 MP 30.03
Informational only; Commercial Vehicle Information
Details: OR22 Mill City Bridge (not on main OR22) Bridge actually on
Connector 162AY MP 1C30.29 - 1st Street crossing over the Santiam
River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 08/16/2013 10:00 am
ORE43 MP 0
Informational only; Commercial Vehicle Information
Details: OR43 NB ramp to US26 WB/Kelly Ave (Portland) Effective July
15, 2013, the NB OR43 ramp to US26 WB/Kelly Ave will be intermittently
closed Monday - Friday between the hours of 9 PM & 5:30 AM. Estimated
date of completion is September 1, 2013.
Updated: 08/16/2013 10:00 am
ORE43 MP 11.43
Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Arch Bridge - Oregon City) The Oregon City
Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 08/16/2013 10:00 am
ORE53 MP 5.981
Informational only; Commercial Vehicle Information
Details: OR53 MP 5.98 Jack Horner Creek OR53 Jack Horner Creek Bridge
at MP5.98 is restricted to 20,000 lbs. single axle, 40,000 lbs tandem
axle; Weight Table 3.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.22
Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective
January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from
US26/Kelly Ave will be restricted to 10 feet 00 in. in width.
Estimated date of completion is September 3, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.45 To 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 3.2
Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August
24, 2010, this section of OR99W will be restricted to 14 feet 00 in.
in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are
allowed. In addition, the height will be restricted to 17 feet 00 in.
in height at the same time. Estimated date of completion is December
31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 5.93 To 6.3
Informational only; Commercial Vehicle Information
Details: OR99E MP 5.93 to MP 6.30 NB & SB (Milwaukie) Effective August
12, 2013, this section of OR99E northbound and southbound will be
restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height on
Monday to Friday between the hours of 10 AM & 3 PM (DAYTIME).
Estimated date of completion is August 23, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 12.18 To 16.66
Informational only; Commercial Vehicle Information
Details: OR99W MP 12.03 to MP 16.68 NB & SB (Tualatin) Effective April
15, 2013, this section of OR99W will be restricted to 10 feet 00 in.
in width between the hours of 8 PM & 6 AM. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 12.2
Informational only; Commercial Vehicle Information
Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin
River Bridge in King City is restricted to 20,000 lbs. single axle,
34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 08/16/2013 10:00 am
ORE99 MP 58.57
Informational only; Commercial Vehicle Information
Details: OR99W MP 58.57 NB & SB (south of Rickreall) Effective August
20, 2013, this section of OR99W northbound and southbound will be
restricted to 14 feet 00 in. in width. Estimated date of completion is
August 20, 2013.
Updated: 08/16/2013 10:00 am
ORE120 MP .38
Informational only; Commercial Vehicle Information
Details: OR120 MP 0.38 Columbia Slough Bridge (Swift Hwy in Portland)
This bridge is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 08/16/2013 10:00 am
ORE130 MP 3.23
Informational only; Commercial Vehicle Information
Details: OR130 MP 3.23 Panther Creek MP 3.23 Panther Creek 3.23 miles
east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 08/16/2013 10:00 am
ORE130 MP 3.6
Informational only; Commercial Vehicle Information
Details: OR130 MP 3.60 Squaw Creek MP 3.60 Squaw Creek 3.60 miles east
of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 105,500 lbs. GVW., Weight Table 2
Updated: 08/16/2013 10:00 am
ORE130 MP 3.82
Informational only; Commercial Vehicle Information
Details: OR130 MP 3.82 Austin Creek MP 3.82 Austin Creek 3.82 miles
east of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 08/16/2013 10:00 am
ORE130 MP 4.15
Informational only; Commercial Vehicle Information
Details: OR130 MP 4.15 Little Nestucca MP 4.15 Little Nestucca River
4.15 miles east of US101 is restricted to 20,000 lbs. single axle,
34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2
Updated: 08/16/2013 10:00 am
ORE130 MP 4.76
Informational only; Commercial Vehicle Information
Details: OR130 MP 4.76 Bear Creek MP 4.76 Bear Creek 4.76 miles east
of US101 is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 105,500 lbs. GVW., Weight Table 2
Updated: 08/16/2013 10:00 am
ORE153 MP 5.88
Informational only; Commercial Vehicle Information
Details: OR153 MP 5.88 Bellvue-Hopewell Hwy OR153 MP 5.88 Salt Creek
Bridge (Ash Swale) just west of Amity is restricted to 21,500 lbs.
single axle, 43,000 lbs. tandem axle, Wt. Table 3
Updated: 08/16/2013 10:00 am
ORE164 MP 6.24
Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge) -
Jefferson OR164 at MP 6.24 crossing the Santiam River Bridge is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs.
single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3
for Non-Divisible loads.
Updated: 08/16/2013 10:00 am
ORE213 MP 24 To 25
Estimated delay under 20 minutes; Construction Work
Comments: One lane and right shoulder traffic will be periodically
interrupted by closure or flagging. Speed limit reduced to 45 miles
per hour. OR213 1/4 mile south of intersection with Wagon Rd. to 1/2
mile north of Butte Creek Bridge. Grading, drainage, bridge
replacement, paving, signing and roadside development project.
Updated: 07/18/2013 11:02 am
ORE214 MP 22.06 To 38.94
Informational only; Commercial Vehicle Information
Details: OR214 MP 21.2 to MP 39.1 (south of Silverton) Effective July
15, 2013, this section of OR214 will be restricted to 12 feet 00 in.
in width. Estimated date of completion is September 15, 2013.
Updated: 08/16/2013 10:00 am
ORE214 MP 36.63 To 37.87
Informational only; Commercial Vehicle Information
Details: OR214 EB & WB MP 36.24 to MP 37.87 (Woodburn) Effective
August 26, 2013, OR214 between Willow Ave (west of I-5) and
Settlemeier Ave (east of I-5) will be restricted to 14 feet 00 in. in
width. Mobile homes with eaves are allowed, provided the base width
does not exceed 14 feet 00 in. in width. Estimated date of completion
is September 30, 2016.
Updated: 08/16/2013 10:00 am
ORE214 MP 36.78 To 37.87
Estimated delay under 20 minutes; Construction Work
Comments: Work to widen bridge, reconstruct and widen OR214 from
Willow Ave to Broughton Way. Construction of a transit facility at
Evergreen Road. Signing, illumination and landscaping will also be
done.
Updated: 07/30/2013 08:02 am
ORE217 MP 0 To 7.52
Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013,
OR217 will be restricted to 13 feet 00 in. in width between the hours
of 9:30 PM & 5 AM. In addition, the height will be restricted to 15
feet 11 in. going northbound and 15 feet 07 in. going southbound
between the hours of 8 PM & 5 AM. Estimated date of completion is
December 31, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 0 To 7.52
Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217.
This project will make operational and safety improvements on OR 217,
including widening the right shoulders on three sections of OR 217,
paving both directions of OR 217 from TV Highway to I-5, improving
signage in the OR 217 corridor, and upgrading the center median
barrier. There will be ongoing lane and shoulder closures both
northbound and southbound at nighttime (7:30 PM to 6 AM Monday-Friday
and until 7 a.m. on Saturday) for roadway grinding and paving. There
will be ongoing shoulder work during the day. On Friday, July 26th
northbound lanes will be closed between S.W. Canyon Rd. and Tualatin
Valley Highway for paving. Detours will be in place. On Monday, July
29th the southbound lanes between S.W. Canyon Rd. and Tualatin Valley
Highway will be closed for paving. A traffic detour will be in place.
Updated: 07/26/2013 4:20 pm
ORE217 MP 1.47 To 1.76
Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May
13, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should
take Exit 2A and re-enter OR217. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.56 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.81 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 4.94
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) Median , 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 07/24/2013 02:33 am
ORE217 MP 4.95 To 5.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective
September 16, 2013, this section of OR217 will be intermittently
closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date
of completion is October 11, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.19 To 6.69
Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective September
16, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is
October 25, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.87 To 6.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 7.00 to MP 6.87 NB (Tigard) Effective August 1,
2013, this section of OR217 northbound will be restricted to 10 feet
00 in. in width between the hours of 9 PM & 5:30 AM (NIGHTTIME).
Estimated date of completion is September 20, 2013.
Updated: 08/16/2013 10:00 am
ORE219 MP 23.46
Informational only; Commercial Vehicle Information
Details: OR219 MP 23.46 Willamette River near Newberg MP 23.46
Willamette River Bridge near Newberg is restricted to 20,000 lbs.
single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table
2 Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle -
98,000 lbs. GVW., Weight Table 3 Non-Divisible loads
Updated: 08/16/2013 10:00 am
ORE224 MP -.01 To .93
Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February
4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in
width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of
completion is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE226 MP 19 To 23
Future Event: Estimated delay under 20 minutes; Maintenance Work
Expected Start Date: 8/21/2013 7:00:00 AM
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: A crew will be chip sealing and striping. Work hours will be
7 AM to 7 PM. Flaggers and pilot car will direct traffic.
Updated: 08/08/2013 09:01 am
ORE99E MP 1 To 1.5
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures
Motorists can expect daytime lane closures with flaggers controlling
traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday.
The right lane on OR 99E (Martin Luther King, Jr. Boulevard)
southbound starting at Division Street may also be closed this week
between 9 a.m. and 3 p.m. This project will pave and adjust manhole
covers on the �jughandle� on-ramp from SE Ivon Street/SE 4th Place
onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound
viaduct. Construction will be complete by May 2013.
Updated: 07/30/2013 8:16 pm
ORE99E MP 5.93 To 6.3
Informational only; Construction Work
Comments: Expect shoulder closures for Portland-Milwaukie Light Rail
Project. Full weekend closure will occurr in this area Aug. 16-19.
Construction of the Portland-Milwaukie Light Rail Transit Project
requires the closure of McLoughlin Blvd/Hwy 99E between SE Washington
Street and SE River Road from 10 p.m. Friday, August 16 to 5 a.m.
Monday, August 19. Construction crews will be placing large steel
bridge girders over McLoughlin Blvd/ Hwy 99E in order to create the
bridge that will carry light rail from downtown Milwaukie to the west
side of McLoughlin/Hwy 99E. Crews will work 24 hours a day to complete
the work in the shortest time possible. Construction outside normal
hours is approved under a City of Milwaukie noise variance
(503-786-7500). Access to local residences and businesses will be
maintained. McLoughlin will be open for local access only between SE
River Road/Bluebird Street and Park Avenue, and between SE Harrison
and Washington streets. TriMet bus line 33-McLoughlin will be rerouted
to Oatfield Road via Park Avenue. Travelers wanting to get around the
closure will follow a signed detour and use OR 224 and I-205. For more
informaiton and detour maps:
Updated: 08/15/2013 4:23 pm
ORE99W MP 10.95
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays,
use caution. This safety project will widen OR 99W at Beef Bend Road
in Tigard/King City in order to build a dedicated right turn lane for
southbound motorists. This week, there may be brief traffic delays
during the day as trucks enter and exit the work zone from Beef Bend
Road. The contractor will maintain the temporary bike/ped access
through the project area this week. Bicyclists and pedestrians using
the trail near Beef Bend Road should use caution and watch for
equipment and construction activities along the path.
Updated: 07/26/2013 8:22 pm
ORE99W MP 16.58 To 12.15
Estimated delay under 20 minutes; Construction Work
Comments: Nighttime paving on OR 99W through the summer. Expect short
delays between 8 p.m. and 6 a.m. This project will grind off the old
pavement, repave and restripe OR 99W in both directions between the
Tualatin River Bridge in King City and Sunset Boulevard in Sherwood.
This week, motorists can expect nighttime single lane closures on OR
99W in both directions throughout the entire project area from 8 p.m.
to 6 a.m., Monday through Friday, for paving.
Updated: 07/26/2013 8:24 pm
US20 MP 15.24 To 24.25
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Watch for increased truck traffic. Flaggers will be used to
control traffic. Delays are expected to be 5 mintues or less. This
project straightens the current US20 alignment by removing a very
sharp curve to the east of Eddyville. Signs, pavement marking,
drainage features, and traffic warning devices will also be removed,
adjusted, and installed throughout the project.
Updated: 08/09/2013 12:04 pm
US20 MP 15.25 To 24.25
Informational only; Commercial Vehicle Information
Details: US20 MP 15.24 to MP 24.25 EB & WB) (Eddyville) Effective July
30, 2013, this section of US20 will be restricted to 12 feet 00 in. in
width per the following schedule: MP 15.24 to MP 17 - Monday to
Saturday between 6 PM & 8 AM; MP 17 to MP 24.25 - Monday to Friday
between 7 AM & 5:30 PM. In addition, the Yaquina River Bridge on
Monday to Friday between 7 AM & 5:30 PM will be restricted to 20,000
lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight
Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs.
tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Loads that are normally allowed to exceed these weights by straddling
the centerline and reducing travel speed to 25 mph will not be able to
during these times without advance notice and coordination. Contact
the Over-Dimension Permit Unit at 503-373-0000 to coordinate a
date/time this may be allowed. Estimated date of completion is
September 15, 2013.
Updated: 08/16/2013 10:00 am
US20 MP 16.29 To 21.88
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: The project will be installing horizontal drains, 78"
structural plate pipe, rock drainage features and earthwork. No delays
anticipated.
Updated: 08/09/2013 11:59 am
US20 MP 23.38
Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge -
Eddyville) Effective May 19, 2006, the Yaquina River Bridge near
Eddyville is restricted to the following weights: 20,000 lbs. single
axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for
divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle,
98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles
exceeding these weights may cross the bridge if they straddle the
centerline, do not exceed 25 MPH and are the only vehicle on the
bridge. Certified flaggers are required to stop traffic.
Updated: 08/16/2013 10:00 am
US26 MP .01
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave WB ramp to OR99W/Naito Parkway NB (Portland)
Effective July 15, 2013, the US26/Kelly Ave WB ramp to OR99W/Naito
Parkway NB will be intermittently closed Monday - Friday between the
hours of 9 PM & 5:30 AM. Estimated date of completion is September 1,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .01
OFF RAMP
No to Minimum Delay; Construction Work
Comments: Random shoulder closures including Saturday, July 20 from
7:00 a.m. to 3:30 p.m. No impact to traffic other than on S.W. Meade
St. which is closed Ramps Affected. Project Description: This project
will replace the concrete pavement on the southbound Ross Island Way
ramp from SW Arthur Street to the Ross Island Bridge, and make various
bicycle and pedestrian safety improvements along SW Kelly Avenue on
the west side of the Ross Island Bridge adjacent to the National
College of Natural Medicine.
Updated: 07/26/2013 8:12 pm
US26 MP .16 To .32
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .22
Informational only; Commercial Vehicle Information
Details: US26/Ross Island Bridge WB ramp to I-5 SB & OR43 SB
(Portland) Effective July 15, 2013, the US26/Ross Island WB ramp to
I-5 SB & OR43 SB will be intermittently closed Monday - Friday between
the hours of 9 PM & 5:30 AM. Estimated date of completion is October
15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .25
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave EB ramp to I-5 SB & OR43 SB (Portland)
Effective July 15, 2013, the US26/Kelly Ave EB ramp to I-5 SB & OR43
SB will be intermittently closed Monday - Friday between the hours of
9 PM & 5:30 AM. Estimated date of completion is October 15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .31 To 0
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP 1.46
Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June
15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will
be closed. Estimated date of re-opening is September 1, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 6.03 To 9.96
Informational only; Commercial Vehicle Information
Details: US26 MP 6.00 to MP 10.15 EB & WB (East Portland) Effective
June 24, 2013, this section of US26 will be restricted to 10 feet 00
in. in width per the following schedule: Sunday - Thursday nights
between the hours of 8 PM & 6 AM; Friday night between the hours of 8
PM & 9 AM; Saturday night between the hours of 8 PM & 10 AM. The
estimated date of completion is October 28, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 6.64
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: During night time hours, various intersections will close to
one lane only in each direction. Project Description: The project
includes safety upgrades and new pavement. The work includes: Traffic
signal upgrades to reduce crashes New curb ramps to meet Americans
with Disabilities (ADA) standards New pedestrian signals Three new
crosswalks with rapid flash beacons at Southeast 119th, 141st,and
156th avenues An eight foot shoulder through the corridor The project,
which began July 8, 2013, will be completed in mid-October, 2013
Updated: 07/26/2013 8:15 pm
US26 MP 32.47 To 30.43
Informational only; Commercial Vehicle Information
Details: US26 WB MP 32.47 to MP 30.43 (east of Portland) Effective
August 23, 2013, this section of US26 westbound will be restricted to
12 feet 00 in. in width between the hours of 8 AM & 11 PM. Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 42.8 To 43
Estimated delay under 20 minutes; Construction Work
Comments: Expect single lane closures in both directions Monday
through Friday. S&K Painting of Clackamas will remove rust and repaint
the bridge beams of the Zig Zag River Bridge on U.S. 26 (Mt. Hood
Highway) at milepost 43.8 west of Rhododendron. This work is needed to
preserve the bridge for years to come. Traffic Impacts One right lane
will remain closed in each direction during this work. The contractor
will place equipment and scaffolding in the closed lanes. Travelers
should expect minor delays through the work zone. One lane in each
direction will remain open at all times. � Most of the work will
happen under the bridge out of the view of travelers using U.S. 26.
So, although you might not see workers, this is an active work zone.
Updated: 08/08/2013 10:32 am
US26 MP 56.93 To 57.33
Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North
Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and
off-ramp to/from Glencoe Rd will be intermittently closed per the
following schedule: Monday through Friday nights, 9:30 PM to 5 AM;
Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on
the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 56.98 To 57.38
Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North
Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and
off-ramp to/from Glencoe Rd will be intermittently closed per the
following schedule: Monday through Friday nights, 9:30 PM to 5 AM;
Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on
the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 57
Estimated delay under 20 minutes; Construction Work
Comments: Construction is occurring near the roadway. Please use
caution. Project Description: This project replaces the Glencoe Road
overpass at U.S. 26 in North Plains and improves the highway ramps,
bicycle and pedestrian connections, signs, traffic signals, striping
and drainage at this interchange. A culvert under Glencoe Road will
also be replaced with a bridge. Traffic Impacts: None this week as the
contractor is working on tasks off the roadway. For more information:
Updated: 05/22/2013 08:42 am
US26 MP 65.9 To 64.3
Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: there may be lane closures on U.S. 26 around the Bethany
Boulevard overpass for Washington County project. Project Description:
This project widened U.S. 26 between NW Cornell Road and 185th Avenue
in Beaverton to three lanes in each direction, added median cable
barrier and widened the shoulders
Updated: 07/26/2013 8:22 pm
US26 MP 72.36
Informational only; Commercial Vehicle Information
Details: US26 EB on-ramp from Knights Blvd - Zoo - Forestry Center
(East Portland) Effective August 25, 2013, the ramp from Knights Blvd
- Washington Park Zoo - Forestry Center to US26 eastbound will be
closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date
of completion is August 27, 2013.
Updated: 08/16/2013 10:00 am
US30 MP .03
Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River
Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing
the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 08/16/2013 10:00 am
US30 MP 12.5 To 17.93
Estimated delay under 20 minutes; Construction Work
Comments: Daytime lane closures & delays for paving; some access
restrictions This week, motorists can expect daily lane closures and
traffic shifts on U.S. 30 westbound (towards Scappose) from 3 a.m. to
3 p.m., Monday through Friday, for grinding and paving. Direct access
to driveways and cross-roads will be restricted at certain times as
the paving operation moves through. Motorists will be able to drive
past the paving work zone, make a u-turn and access these roads and
driveways from the other direction. Motorists will be driving on a
rough surface with a two-inch lip between lanes in certain areas.
Please slow down and use caution. This project will repave US 30 in
both directions between McNamee Road and milepost 17.93, just east of
the Columbia County line, and apply a waterproof membrane to the
bridge over McCarty Creek.
Updated: 07/26/2013 8:24 pm
US30 MP 12.69
Informational only; Commercial Vehicle Information
Details: US30 WB MP 12.62 to MP 12.76 (south of Scappoose) Effective
August 23, 2013, this section of US30 westbound will be restricted to
14 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
US30 MP 13.14
Informational only; Commercial Vehicle Information
Details: US30 MP 13.14 Historic Columbia River Highway Historic US30
MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000
lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 08/16/2013 10:00 am
US30 MP 13.24
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays,
use caution. There is daytime shoulder work planned this week on US 30
as the contractor begins work on this project. This project will
improve safety and mobility at this intersection by lengthening
existing turn lanes from US 30 onto Cornelius Pass Road, adding new
dedicated right and left turn lanes from Cornelius Pass Road onto US
30 and upgrading traffic signals.
Updated: 05/09/2013 3:56 pm
US30 MP 17.68
Informational only; Commercial Vehicle Information
Details: US30 MP 17.68 Historic Columbia River Highway (W Multnomah
Falls Bridge) Historic US30 MP 17.68 West Multnomah Falls Bridge is
restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2
combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 08/16/2013 10:00 am
US30 MP 20.39
Informational only; Commercial Vehicle Information
Details: US30 MP 20.39 Historic Columbia River Highway Historic US30
MP 20.39 Horsetail Creek Bridge is restricted to 20,000 lbs. single
axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 08/16/2013 10:00 am
US30 MP 31.7 To 37.2
Estimated delay under 20 minutes; Construction Work
Comments: Expect daytime and nighttime lane closures as a contractor
paves U.S. 30 from Jones Road to Columbia City. A paving project is
under way on U.S. 30 (Lower Columbia River Highway) in both directions
from just north/west of Pacific Street in Columbia City to Jones Road,
a distance of approximately 5.5 miles. Work will finish by the end of
May 2013. The contractor plans to primarily work at night, Monday
through Thursday, from 7 p.m. to 6 a.m. There will be occasional
daytime work on weekdays between 9 a.m. and 4 p.m. This work is
weather dependent and will be delayed in wet weather. Road users
should expect short delays and increased congestion in this area
during this project. Please drive carefully through the construction
zone.
Updated: 04/22/2013 4:12 pm
US30 MP 48.67
Informational only; Commercial Vehicle Information
Details: US30 OR/WA Border at Rainier (Lewis & Clark Bridge) This
bridge belongs to Washington State. Restricted to 21,500 lbs. per
axle. No gross weight restriction.
Updated: 08/16/2013 10:00 am
US30 MP 94.42 To 95.11
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. (Lower Columbia
River Highway, mile post 94.42 to 95.11) This project consists of
replacing a culvert with a bridge along US30 just east of Astoria. The
scheduled work includes construction of the bridge and new roadway
alignment. The access to the old Columbia River Highway located at the
project site has been permanently closed. Flaggers will control single
lane traffic during construction activities as required. Expect delays
of up to 20 minutes and drive through the area with caution. Oregon
State Police will be enforcing the speed limit through the work zone
area. The project is scheduled to be completed in September 2014.
Updated: 04/02/2013 12:23 pm
US101 MP 4.78
Informational only; Commercial Vehicle Information
Details: US101 Business MP 4.78 (Lewis & Clark River Bridge) MP 4.78
Drawbridge crossing Lewis & Clark River (2.5 miles south of Astoria)
is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
80,000 lbs. GVW. Weight Table 1.
Updated: 08/16/2013 10:00 am
US101 MP 6.89
Informational only; Commercial Vehicle Information
Details: US101 Business MP 6.89 (Old Youngs Bay Bridge) MP 6.89.
Effective November 10, 2009 the Old Youngs Bay Bridge in Astoria will
be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW Weight Table 2.
Updated: 08/16/2013 10:00 am
US101 MP 40.71
Informational only; Commercial Vehicle Information
Details: US101 MP 40.71 Neahkahnie Mtn Chasm (near Manzanita)
Effective November 15, 2004 at MP 40.71 Neahkahnie Mountain Chasm
Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 08/16/2013 10:00 am
US101 MP 90.33 To 105.64
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Contractor pavement repairs have started. Due to high
traffic all work will be done at night. Expect delyas between 6 PM and
9 AM. Expected project completion date will be by the end of August
2013. All of the work is planned to be done during the night.
Updated: 08/09/2013 12:21 pm
US101 MP 103.9
Estimated delay under 20 minutes; Crash/Hazard
Comments: A crash has occurred, use caution.
Last Updated: 08/16/2013 5:19 pm
US101 MP 134.08 To 139.11
Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Beginning mid August through late September, US101 will be
paved from Beverly Beach Park to the north end of Newport. All work
will be done at night.
Updated: 07/26/2013 1:23 pm
US101 MP 141.67
Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge) Effective March 1, 2013,
the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single
axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for
Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle -
98,000 lbs. GVW, Weight Table 3 for Non-Divisible loads. Non-divisible
loads exceeding these weights (up to Weight Table 5) may cross the
bridge if they stop traffic/straddle the centerline and are the only
vehicle on the bridge when crossing. Certified flaggers are required
to stop both northbound and southbound traffic. The rolling stop
method is not allowed.
Updated: 08/16/2013 10:00 am
US30BY MP 12.4 To 13.7
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: No work is planned this week. Project Description: This
safety improvement project will add a center left-turn lane to this
section of Sandy Boulevard, striped bike lanes in both directions and
sidewalk on the south side of the road. It will also upgrade the
traffic signals at NE 122nd Avenue and NE 138th Avenue and making
pedestrian crossing improvements at NE 131st Place. Traffic Impacts:
None anticipated this week. This project is in "winter shutdown mode,"
with only limited work activities anticipated through early spring.
For more information:
Updated: 07/28/2013 07:07 am
North Oregon Road Conditions by Route
I-84 MP 35 To 44
Estimated delay under 20 minutes; Construction Work
Comments: The right and left lanes of I-84 eastbound near exit 35 and
the right or left lane of I-84 westbound at milepost 35 will close
intermittently. Project Description: This project will replace the
driving surface on four bridges on I-84 between exit 35
(Dodson/Ainsworth State Park) and exit 44 (Cascade Locks/Bridge of the
Gods) in the Bonneville Dam area. The bridges being resurfaced are:
I-84 westbound at Dodson, just west of exit 35 I-84 eastbound at
Dodson, just west of exit 35
Updated: 07/26/2013 7:55 pm
I-84 MP 37
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: The right lane of I-84 eastbound near exit 37 and the right
or left lane of I-84 westbound at milepost 39 will close
intermittently Project Description: This project constructs a new
1.6-mile section of the Historic Columbia River Highway State Trail
adjacent to I-84, between John B. Yeon State Park and Moffett Creek.
Updated: 07/26/2013 8:03 pm
I-84 MP 37.12 To 38.98
Informational only; Commercial Vehicle Information
Details: I-84 MP 36.75 to MP 39 EB & WB Effective September 6, 2012,
this section of I-84 is restricted to 19 feet 00 in. in width
Monday-Friday between the hours of 7:30 AM & 5:30 PM. Estimated date
of completion is October 1, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 64.15 To 64.44
Informational only; Commercial Vehicle Information
Details: I-84 MP 64.14 to MP 64.49 EB & WB (East Hood River) Effective
August 15, 2013, this section of I-84 will be restricted to 16 feet 00
in. in width. In addition, the ramps from OR35/US30 to I-84 eastbound
and westbound will be closed. Estimated date of completion is August
31, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 69.79
Informational only; Commercial Vehicle Information
Details: I-84 MP 69.79 Mosier Interchange crossing over I-84 (Mosier)
Effective August 2, 2013, Mosier Interchange crossing over I-84 is
restricted to the following weights: 44,000 lbs for solo trucks;
68,000 lbs for truck tractor/semitrailer combinations; 80,000 lbs for
truck and trailer combinations, doubles combinations, and triples
combinations; no unit, in a combination, double, or triple can exceed
44,000 lbs.
Updated: 08/16/2013 10:00 am
I-84 MP 103.75 To 104.83
Informational only; Commercial Vehicle Information
Details: I-84 MP 103.5 to MP 105.0 EB & WB (Biggs Junction) Effective
July 22, 2013, this section of I-84 will be restricted to 19 feet 00
in. in width. In addition, the height will be restricted to 19 feet 03
in. in height eastbound, and 17 feet 09 in. in height westbound.
Estimated date of completion is December 1, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 104.37 To 104.78
Informational only; Commercial Vehicle Information
Details: I-84 MP 103.5 to MP 105.0 EB & WB (Biggs Junction) Effective
July 22, 2013, this section of I-84 will be restricted to 19 feet 00
in. in width. In addition, the height will be restricted to 19 feet 03
in. in height eastbound, and 17 feet 09 in. in height westbound.
Estimated date of completion is December 1, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 104.5 To 106
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes (Eastbound) 2 Lanes
Comments: Expect no to minimum delays During the week of August 18th
to August 24th the contractor will be building construction accesses,
building shoreing, and excavating along US97 South of the
intersection. Expect construction activity on shoulders thoughout the
project site. Traffic on I-84 will be reduced to one lane in both EB
and WB directions. Expect construction traffic on US97. There should
be no delays on either US97 or I-84
Updated: 08/15/2013 10:19 am
I-84 MP 114.03 To 114.6
Informational only; Commercial Vehicle Information
Details: I-84 MP 114 to MP 115 (John Day River Bridge) Effective
August 8, 2013, this section of I-84 will be restricted to 16 feet 00
in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM
until 1/2 hr after sunset. In addition, this section of I-84 will be
restricted to 12 feet 00 in. in width from 1/2 hr after sunset until
1/2 hr before sunrise. Estimated date of completion is August 22,
2013.
Updated: 08/16/2013 10:00 am
I-84 MP 114.23 To 114.6
Informational only; Commercial Vehicle Information
Details: I-84 MP 114 to MP 115 (John Day River Bridge) Effective
August 8, 2013, this section of I-84 will be restricted to 16 feet 00
in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM
until 1/2 hr after sunset. In addition, this section of I-84 will be
restricted to 12 feet 00 in. in width from 1/2 hr after sunset until
1/2 hr before sunrise. Estimated date of completion is August 22,
2013.
Updated: 08/16/2013 10:00 am
ORE35 MP 101.82
Informational only; Commercial Vehicle Information
Details: OR35 OR/WA Border at Hood River OR35 White Salmon Bridge at
Hood River is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle, 80,000 lbs. GVW; Weight Table 1. Bridge belongs to Port
of Hood River.
Updated: 08/16/2013 10:00 am
ORE206 MP 2
Unconfirmed; Crash/Hazard
Comments: An unconfirmed report of falling rock has been received, use caution.
Last Updated: 08/16/2013 5:59 pm
ORE207 MP 11.86
Informational only; Commercial Vehicle Information
Details: OR207 MP 11.86 MP11.86 (5.5 miles south of Hermiston) is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle,
105,500 lbs GVW, Wt. Table 2 Divisible Load; 21,500 lbs. single axle,
43,000 lbs. tandem axle, 98,000 lbs. GVW, Non-divisible Load.
Updated: 08/16/2013 10:00 am
US26 MP 42.8 To 43
Estimated delay under 20 minutes; Construction Work
Comments: Expect single lane closures in both directions Monday
through Friday. S&K Painting of Clackamas will remove rust and repaint
the bridge beams of the Zig Zag River Bridge on U.S. 26 (Mt. Hood
Highway) at milepost 43.8 west of Rhododendron. This work is needed to
preserve the bridge for years to come. Traffic Impacts One right lane
will remain closed in each direction during this work. The contractor
will place equipment and scaffolding in the closed lanes. Travelers
should expect minor delays through the work zone. One lane in each
direction will remain open at all times. � Most of the work will
happen under the bridge out of the view of travelers using U.S. 26.
So, although you might not see workers, this is an active work zone.
Updated: 08/08/2013 10:32 am
US26 MP 91 To 102.6
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect single lane closures and traffic will be controlled
by flaggers and pilot cars. Expect 20 min or less delays. During the
week of August 18th to August 24th the contractor will be constructing
the EB passing lane. Traffic will be controlled by flaggers and pilot
cars. Delays will be less than 20 minutes.
Updated: 08/15/2013 12:50 pm
US26 MP 103.27 To 91.71
Informational only; Commercial Vehicle Information
Details: US26 MP 91.74 to MP 102.62 EB & WB (Warm Springs) Effective
July 15, 2013, this section of US26 will be restricted to 18 feet 00
in. in width between the hours of 7 AM & 7 PM. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 105.26
Informational only; Commercial Vehicle Information
Details: US26 MP 105.26 WB (Warm Springs) Effective August 12, 2013,
this section of US26 westbound will be restricted to 16 feet 00 in. in
width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of
completion is August 30, 2013.
Updated: 08/16/2013 10:00 am
US30 MP 30.42
Informational only; Commercial Vehicle Information
Details: US30 MP 30.42 (Bridge of the Gods - Cascade Locks) Effective
July 16, 2013, the Bridge of the Gods at US30 MP 30.42 is restricted
to 16,000 lbs. This bridge belongs to the Port of Cascade Locks.
Updated: 08/16/2013 10:00 am
US97 MP .43 To 2
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes (Southbound) 2 Lanes
Comments: Expect construction activity on shoulders throughout the
project site. Expect delays of less than 20 minutes.
Updated: 07/22/2013 10:22 am
US197 MP 0
Informational only; Commercial Vehicle Information
Details: US197 MP 0.00 NB & SB (Columbia River Bridge - The Dalles)
Effective September 16, 2013, this section of US197 will be restricted
to 14 feet 00 in. in width on Monday to Thursday between the hours of
6:30 AM & 5 PM (DAYTIME). No restrictions will be in place from 5 PM
Thursday until 6:30 AM Monday. Mobile homes with eaves are allowed,
provided the base width does not exceed 14 feet 00 in. in width.
Estimated date of completion is October 3, 2013.
Updated: 08/16/2013 10:00 am
US197 MP 45.84
Informational only; Commercial Vehicle Information
Details: US197 MP 45.84 NB & SB (Deschutes River Bridge - Maupin)
Effective September 9, 2013, this section of US197 will be restricted
to 8 feet 06 in. in width (LEGAL WIDTH) between the hours of 7 AM & 5
PM (DAYTIME). Estimated date of completion is September 12, 2013.
Updated: 08/16/2013 10:00 am
Northeast Oregon Road Conditions by Route
I-84 MP 217 To 245
No to Minimum Delay; Construction Work
Lanes Affected: (Eastbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays,
use caution.
Updated: 07/22/2013 10:19 am
I-84 MP 245.85 To 260.67
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect minimal slow lane closures for road construction in
the area, use caution.
Updated: 07/22/2013 10:12 am
I-84 MP 248.54 To 260.29
Informational only; Commercial Vehicle Information
Details: I-84 MP 248.0 to MP 260.7 EB (west of La Grande) Effective
May 20, 2013, this section of I-84 eastbound will be restricted to 13
feet 00 in. in width. Mobile homes with eaves allowed provided the
base width does not exceed 13 feet 00 in. Estimated date of completion
is November 1, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 256.4
Informational only; Commercial Vehicle Information
Details: I-84 MP 256.42 Upper Perry Interchange crossing over I-84
(Perry) Upper Perry Interchange crossing over I-84 is restricted to
the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem
axle, 105,500 lbs. GVW, Weight Table 2 for divisible loads; 21,500
lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight
Table 3 for non-divisible loads.
Updated: 08/16/2013 10:00 am
I-84 MP 259 To 260
No to Minimum Delay; Maintenance Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring causing no to
minimum delays, use caution.
Updated: 08/14/2013 10:21 am
I-84 MP 264.25
No to Minimum Delay; Traffic Congestion
Lanes Affected: (Westbound) 1 Lane
Comments: Right lane will be closed at milepost 259 while debris is
being removed from the freeway, use caution. Watch for truck traffic.
Last Updated: 08/14/2013 10:05 am
I-84 MP 278
Estimated delay under 20 minutes; Traffic Congestion
Lanes Affected: (Westbound) 1 Lane
Comments: Slow traffic, use caution. Contractors are blasting part of
the rock face above the freeway to widen the bench space that helps
prevent rocks from falling onto the road surface. The additional area
will also be easier to access for clearing away accumulated debris.
Last Updated: 08/16/2013 10:01 am
ORE86 MP 51.33 To 63.71
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Guardrail construction is occurring, use caution.
Updated: 08/12/2013 07:03 am
ORE339 MP 2.76
Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 2.76 West Crockett Branch OR339 MP
2.76 West Crockett Bridge is restricted to 21,500 lbs. single axle,
43,000 lbs. tandem axle, 60,000 lbs. tri-axle; Wt. Table 4.
Updated: 08/16/2013 10:00 am
ORE339 MP 3.16
Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 3.16 East Fork Little Walla Walla
River OR339 MP 3.16 Little Walla Walla River Bridge is restricted to
21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs.
tri-axle; Wt. Table 4.
Updated: 08/16/2013 10:00 am
ORE339 MP 3.31
Informational only; Commercial Vehicle Information
Details: OR339/Freewater Hwy MP 3.31 West Fork Little Walla Walla
River OR339 MP 3.31 Little Walla Walla River Bridge is restricted to
21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs.
tri-axle; Wt. Table 4.
Updated: 08/16/2013 10:00 am
West Oregon Road Conditions by Route
99 MP 12.21
Informational only; Commercial Vehicle Information
Details: Old OR99 (DC388) Old Winchester Bridge (Roseburg) Old
Winchester Bridge on DC388 (Old 99) at MP12.21 is restricted to 20,000
lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW.- Weight
Table 2 Divisible Loads; 21,500 lbs. single axle, 43,000 lbs. tandem
axle - 98,000 lbs. GVW.- Weight Table 3 Non- Divisible Loads.
Updated: 08/16/2013 10:00 am
I-5 MP 121.69 To 125.72
Informational only; Commercial Vehicle Information
Details: I-5 MP 121.69 to MP 126.00 NB & SB (Roseburg) Effective
August 8, 2013, this section of I-5 will be restricted to 16 feet 00
in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM
until 1/2 hr after sunset. This section of I-5 will be restricted to
12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before
sunrise. In addition, this section of I-5 will be restricted to 16
feet 02 in. in height northbound, and 16 feet 05 in. in height
southbound between the hours of 7 PM & 7 AM. No restrictions will be
in place from 7 AM Friday until 7 PM Sunday. Estimated date of
completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 121.87
Informational only; Commercial Vehicle Information
Details: I-5 MP 121.69 NB & SB (south Roseburg) Effective September
22, 2013, this section of I-5 will be restricted to 16 feet 00 in. in
width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2
hr after sunset. This section of I-5 will be restricted to 12 feet 00
in. in width from 1/2 hr after sunset until 1/2 hr before sunrise. In
addition, the ramp from I-5 southbound Exit 121 to McLain Ave will be
intermittently closed during the same time. No restrictions will be in
place from 7 AM Friday until 7 PM Sunday. Estimated date of completion
is October 3, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 123.8 To 124.37
Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 124 on- and off-ramps to/from OR138
(Roseburg) Effective September 15, 2013, the on- and off-ramps to/from
I-5 Exit 124 will be intermittently closed on Sunday to Thursday
nights between the hours of 8 PM & 7 AM. No ramp closures will be in
place from 7 AM Friday until 8 PM Sunday. Estimated date of completion
is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 123.91 To 124.16
Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 124 on- and off-ramps to/from OR138
(Roseburg) Effective September 15, 2013, the on- and off-ramps to/from
I-5 Exit 124 will be intermittently closed on Sunday to Thursday
nights between the hours of 8 PM & 7 AM. No ramp closures will be in
place from 7 AM Friday until 8 PM Sunday. Estimated date of completion
is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 136.48
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 136 ramp to OR138 (Sutherlin) Effective September
25, 2013, the ramp from I-5 southbound Exit 136 to OR138 will be
intermittently closed on Sunday to Thursday nights between the hours
of 7 PM & 7 AM. No ramp closures will be in place from 7 AM Friday
until 7 PM Sunday. Estiamted date of completion is October 6, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 136.52
Informational only; Commercial Vehicle Information
Details: I-5 MP 136.52 NB & SB (Sutherlin) Effective September 15,
2013, this section of I-5 will be restricted to 16 feet 00 in. in
width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2
hr after sunset. In addition, this section of I-5 will be restricted
to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr
before sunrise. No restrictions will be in place from 7 AM Friday
until 7 PM Sunday. Estimated date of completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 151.8
Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson
Rd crossing over I-5 is restricted to the following weights: 20,000
lbs. single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight
Table 2 for divisible loads; 21,500 lbs. single axle, 43,000 lbs.
tandem axle, 98,000 lbs. GVW., Weight Table 3 for non-divisible loads.
Updated: 08/16/2013 10:00 am
I-5 MP 151.81
Informational only; Commercial Vehicle Information
Details: I-5 MP 151.81 Wilson Rd crossing over I-5 (Yoncalla) Wilson
Rd crossing over I-5 is restricted to 20,000 lbs. single axle, 34,000
lbs. tandem axle - 105,500 lbs. GVW. Weight Table 2 for Divisible
loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs.
GVW. Weight Table 3 for Non-Divisible loads.
Updated: 08/16/2013 10:00 am
I-5 MP 176
No to Minimum Delay; Crash/Hazard
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 08/16/2013 6:16 pm
I-5 MP 189.65
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 189 ramp to 30th Ave & OR225/McVay Hwy Effective
August 11, 2013, the ramp from I-5 northbound Exit 189 to 30th Ave &
OR225/McVay Hwy will be intermittently closed Sunday - Thursday nights
between the hours of 7 PM & 6 AM. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 192 To 193.5
Estimated delay under 20 minutes; Construction Work
Comments: Southbound speed limit reduced to 50 mph. Watch for
construction vehicles, work crews and traffic sign changes. Expect
night time lane closures. Interstate 5 (between mileposts 192.0 and
193.5): The southbound speed limit is reduced to 50 mph. Watch for
construction vehicles entering and exiting the travel lanes at the
median in both directions. Please drive carefully through the work
zone. Watch for temporary traffic signs, roadside work crews and
equipment. Watch for nighttime single-lane and shoulder closures.
Updated: 08/16/2013 2:30 pm
I-5 MP 192.1 To 193.4
Estimated delay under 20 minutes; Construction Work
Comments: Watch for lane and shoulder closures in both directions. Use
extra caution at the intersection of Franklin and Jenkins Drive.
Franklin Boulevard under I-5: Watch for roadside work crews and
construction vehicles entering and exiting the travel lanes from the
roadway shoulder and at the intersection of Franklin Boulevard and
Jenkins Drive. Watch for single-lane and shoulder closures in both
directions. Please drive carefully and obey all construction signs and
flagger instructions.
Updated: 08/16/2013 2:30 pm
I-5 MP 195.02 To 195.46
Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April
9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in
width and 16 feet 03 in. in height on Monday - Thursday nights between
the hours of 7 PM & 6:30 AM. Estimated date of completion is November
30, 2014.
Updated: 08/16/2013 10:00 am
I-5 MP 195.45 To 195.46
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: Speed reduction to 35 MPH on Beltline; and 50 MPH on I 5
through construction zone. Watch for lane closures and trucks entering
or exiting highway. A speed limit reduction to 35 MPH is now in effect
on Beltline. A speed limit reduction to 50 MPH is now in effect for
I-5 through the construction zone. Most work will be happening behind
barrier. Look for periodic lane closures and trucks entering and
exiting the highway. Project Summary: This project will rebuild the
interchange at Interstate 5 and Randy Pape� Beltline Highway to meet
modern design and safety standards. State funds from the Jobs and
Transportation Act will build: - A new I-5 southbound to westbound
Beltline off-ramp. - A new I-5 southbound to eastbound Beltline
off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new
Beltline Bridge over I-5 - And base construction and structures for a
new multi-use path to connect south of the interchange to north of the
interchange. The path will open upon completion of Unit 4 scheduled to
be constructed in 2016. This is a two year project. Construction of
Unit 3 is scheduled to be completed by November 2014.
Updated: 08/16/2013 2:42 pm
I-5 MP 195.45 To 195.46
Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the
Beltline bridge and 50 on Interstate 5 near the interchange due to
construction work zone. New, lower speed limits have been implemented
on the Randy Pap� Beltline bridge over Interstate 5, and on I-5
beneath the bridge where construction has begun on a two-year project
to improve the I-5/Beltline interchange. Beginning Wednesday, April
17, 2013, the posted, enforceable speed limit on the Beltline bridge
over I-5 will be 35 miles per hour. The speed limit on I-5 near the
interchange will be reduced to 50 miles per hour. The speed limit
reductions will be enforced until the project is completed in fall of
2014. The speed limit reductions are intended to improve work zone
safety for all highway users and construction workers. From 2007
through 2011 in Oregon, 53 people died and more than 2,200 were
injured in work zone crashes. The majority of people injured or killed
in these crashes were drivers, passengers or pedestrians, not workers.
The single biggest factor in crashes is driver inattention; that�s why
orange cones, variable message signs and other tools are used to alert
motorists. The other major contributing factor is speed, which is why
work zones often require lower speed limits. National Work Zone
Awareness Week is April 16-19. To learn more about work zone safety,
visit ODOT�s safety website at:
http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 07/25/2013 4:27 pm
I-5 MP 198.39 To 199.38
Informational only; Commercial Vehicle Information
Details: I-5 MP 198.01 to MP 199.41 NB & SB (Coburg) Effective June
24, 2013, this section of I-5 will be restricted to 16 feet 00 in. in
width on Monday to Thursday between the hours of 8 PM & 6 AM. In
addition, the height will be restricted to 15 feet 10 in. in height
southbound during the same time. Estimated date of completion is
August 24, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 199.15
Informational only; Commercial Vehicle Information
Details: I-5 MP 199.15 NB & SB (Coburg) Effective August 12, 2013,
this section of I-5 will be closed between the hours of 8 PM & 6 AM.
When closed, traffic will be directed to take Exit 199 and re-enter
I-5. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 216
Estimated delay of 20 minutes - 2 hours; Information
Lanes Affected: (Southbound) 1 Lane (Northbound) 1 Lane
Comments: A music event is taking place on Hwy 228 in Brownsville
causing possible delays or traffic issues on I-5. Please proceed with
use caution.
Last Updated: 08/16/2013 3:08 pm
I-105 MP .18
Informational only; Commercial Vehicle Information
Details: I-105 WB ramp to OR99 / W 6th Ave NB (Eugene) Effective
August 24, 2013, the ramp from I-105 eastbound to OR99 (W 6th Ave)
nothbound will be closed between the hours of 10 PM & 6 AM. Estimated
date of completion is August 25, 2013.
Updated: 08/16/2013 10:00 am
I-105 MP .21
Informational only; Commercial Vehicle Information
Details: I-105 EB ramp from OR99 / W 6th Ave NB (Eugene) Effective
August 23, 2013, the ramp from OR99 (W 6th Ave) northbound to I-105
eastbound will be closed between the hours of 10 PM & 6 AM. Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
I-105 MP .26 To .261
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays
between 10 p.m. and 6 a.m. each day until bridge work is done. Use
caution. This project will seal small cracks in the decks of various
concrete bridges on Randy Pape� Beltline Highway and I-105 in Eugene.
Remarks: Work will be done at night between 10pm and 6am at the
following locations: Thurs August 15th I-105 WB to 7th Ave. Fri August
16th 7th Ave to I-105 EB Mon August 19th 7th Ave to I-105 EB Tues
August 20th 7th Ave to I-105 EB Weds August 21st 7th Ave to I-105 EB
Thurs August 22nd I-105 Future Ramp Fri August 23rd Ramp from 6th Ave
to I-105 East Sat August 24th I-105 ramp down to 6th Ave West
Updated: 08/16/2013 3:06 pm
ORE22 MP 30.03
Informational only; Commercial Vehicle Information
Details: OR22 Mill City Bridge (not on main OR22) Bridge actually on
Connector 162AY MP 1C30.29 - 1st Street crossing over the Santiam
River is restricted to 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 08/16/2013 10:00 am
ORE34 MP .13
Informational only; Commercial Vehicle Information
Details: Old OR34 Van Buren St Bridge (Corvallis) MP 0.13 Willamette
River (Van Buren Street) in Corvallis is restricted to 20,000 lbs.
single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW., Weight Table
1
Updated: 08/16/2013 10:00 am
ORE42 MP 23 To 38
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect traffic control with flaggers and pilot car for chip
sealing. Use caution and watch for loose rock in the roadway.
Updated: 08/09/2013 9:36 pm
ORE58 MP 56 To 56.2
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Monday to Thursday evening closures from 8 p.m. to 6 a.m.
includes holidays. One lane will remain open during the day with up to
20 minute delays. Lane restrictions and nighttime closures at the OR
58: Salt Creek Tunnel continue. The highway has been reduced to a
single lane for two-way traffic during the day time. Flaggers and a
pilot car will control travel in alternating directions. Motorists
should anticipate delays of up to 20 minutes. The highway will be
closed to ALL traffic in both directions Monday through Thursday
nights only between 8 p.m. and 6 a.m., including holidays. There is no
local detour available and motorists will need to use an alternate
route. There will be no nighttime complete closures from Friday at 6
a.m. until Monday at 8 p.m. during the construction season. The single
lane restriction will remain in place during all hours when the tunnel
is open. Project Summary: Built in 1939, the tunnel needs serious
repair and the adjacent west half viaduct and the three east viaducts
are failing and need to be replaced. The OR 58: Salt Creek Tunnel and
Half-Viaduct project will: � Replace the half viaduct west of the
tunnel � Replace the three half viaducts east of the tunnel � Repair
the tunnel liner � Lower the tunnel floor Construction continue into
2014.
Updated: 08/16/2013 3:00 pm
ORE58 MP 56.1
Informational only; Commercial Vehicle Information
Details: OR58 MP 56 to MP 59 EB & WB (Salt Creek Tunnel) Effective
April 17, 2013, this section of OR58 at the Salt Creek Tunnel will be
CLOSED to all traffic in both directions at night Monday-Thursday
nights between the hours of 8 PM & 6 AM. In addition, this section of
highway will be restricted to 8 feet 06 in. in width (LEGAL WIDTH) and
14 feet 00 in. in height (LEGAL HEIGHT) at all times (day or night)
when the highway is open (including Friday / Saturday / Sunday).
Estimated date of completion is October 15, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 14.65 To 14.79
Informational only; Commercial Vehicle Information
Details: OR99 MP 14.65 to MP 14.79 SB (Cottage Grove) Effective April
22, 2013, this section of OR99 southbound will be closed on Monday -
Friday nights between the hours of 10 PM & 7 AM. In addition,
effective May 6, 2013, this section of OR99 southbound will be closed
at all hours. Estimated date of completion is June 30, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 14.69 To 14.86
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Watch for lane closures and flaggers directing traffic.
Detour signs are in place. Some night time closures should be
expected. Weeknight construction will take place at the Highway
99-East Main Street intersection until late August. The one-block
section of Highway 99 (9th Street) between Whiteaker Ave. and East
Main will be closed on weeknights (10 p.m. to 7 a.m., Sunday night to
Friday morning) and motorists should expect lane closures on East
Main. Flaggers will provide traffic control. Local traffic may detour
onto East Main Street, River Road and Woodson Place. Motorists should
watch for detour signage and traffic control devices. Some sidewalks
will be closed during construction and pedestrians should look for
detour signage. Due to ongoing construction, the surface of the
intersection will be packed gravel until August. Project Summary: This
project will realign the intersection of East Main and OR 99 to
improve safety, construct streetscape enhancements, improve bike and
pedestrian facilities and upgrade and improve traffic signals at 4th
and at East Main and OR 99. In addition, a new water main will be
constructed for the City of Cottage Grove.
Updated: 08/16/2013 3:48 pm
ORE99 MP 14.79
Informational only; Commercial Vehicle Information
Details: OR99 MP 14.80 to MP 14.86 NB & SB (Cottage Grove) Effective
July 8, 2013, this section of OR99 northbound and southbound will be
closed at all hours. Estimated date of completion is September 30,
2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 58.57
Informational only; Commercial Vehicle Information
Details: OR99W MP 58.57 NB & SB (south of Rickreall) Effective August
20, 2013, this section of OR99W northbound and southbound will be
restricted to 14 feet 00 in. in width. Estimated date of completion is
August 20, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 100.68 To 101.08
Informational only; Commercial Vehicle Information
Details: OR99W MP 100.68 to MP 101.08 NB & SB (Monroe) Effective
August 31, 2013, this section of OR99W will be closed between the
hours of 9 AM & 10 AM for one day only.
Updated: 08/16/2013 10:00 am
ORE99 MP 108.76 To 109.76
Informational only; Commercial Vehicle Information
Details: OR99 MP 108.76 to MP 109.76 NB & SB (Junction City) Effective
September 28, 2013, this section of OR99 will be closed between the
hours of 6 PM & 11 PM for one day only.
Updated: 08/16/2013 10:00 am
ORE126 MP 1.34
Informational only; Commercial Vehicle Information
Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34
Willamette River Bridge (1 mile east of I-5 in Springfield) is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single
axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3
Non-Divisible loads
Updated: 08/16/2013 10:00 am
ORE126 MP 3.79
Informational only; Commercial Vehicle Information
Details: OR126 WB ramp to I-5 NB (Springfield) Effective July 23,
2013, the ramp from OR126 westbound to I-5 northbound will be
intermittently closed on Monday - Thursday nights between the hours of
7 PM & 5:30 AM. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 3.8 To 9.9
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect single lane and ramp closures off and on in both
directions between I-5 and Main Street through September. Most work is
being done at night. Construction will continue until late September.
Much of the work will be completed at night to avoid peak travel
times. During construction, motorists can expect single lane closures
in both directions; ramp closures; and a weekend closure of the 42nd
Street eastbound interchange. Upcoming lane closures and ramps
closures include: � Cable Median Barrier � Mohawk to Main Street: Some
work in the median and short-term lane closures are possible during
the day, nighttime work and short-term lane closures. Work to begin
Aug. 19th, and will continue through mid-September. � Paving � Pioneer
Parkway, Mohawk, 42nd St, and Main Street ramps: Night time ramp
closures and lane closures Monday night will continue through Tuesday
night (Wednesday morning) Aug. 13th (morning of Aug. 14th) to grind
and pave Highway 126. � Paving � 42nd St to Main Street: Night time
paving to occur on Friday night, Aug. 9th (morning of Aug. 10th) on
eastbound Hwy 126 from 28th Street to Main Street. The fast lane
closure will close off left turns at 52nd Street. � Irregular surfaces
on bridge decks � Pioneer Parkway Bridge, 5th Street Bridge 28th
Street Bridges, and McKenzie Overflow Bridges (near 52nd Street):
Mircromill of pavement on bridge decks is complete some have been
repaved. Abrupt edges along the center stripes can occur for 24 hours
and are signed for no lane changes. Some locations receive a paving
wedge, but are still posted for no lane changes. Pavement will be
replaced during night paving operations, anticipated to be complete by
August 14th. � Traffic Loops � Pioneer Parkway, 42nd St. ramp, and
52nd St. intersection: Night time ramp closures will occur on Pioneer
Parkway and 42nd St. ramps for traffic loop installation from Aug.
12th through Aug. 20th. The loops at the 52nd St. intersection will be
installed Aug. 15th through the 20th. � Bridge Joints � Pioneer
Parkway to Overflow Bridges (near 52nd St.): Night time closures of
single lanes at bridge ends will occur Aug 20th through mid-September
to complete bridge joint work. � Permanent Striping � I-5 to Main
Street: Nighttime lane closures will occur Aug. 12th through Aug. 15th
for permanent striping. Project Summary: This project will preserve
the existing highway by grinding and replacing two inches of asphalt
in most areas and reconstructing the eastbound portions of the 42nd
Street interchange. The project will also improve safety by
constructing cable median barrier between Mohawk Blvd. and East Main
Street (MP 6.24-9.97). Residents and businesses along the highway
should anticipate noise consistent with road construction.
Updated: 08/16/2013 3:00 pm
ORE126 MP 4.34 To 4.94
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Pioneer Pkwy (OR528) & "Q"
St (Springfield) Effective July 9, 2013, the on/off ramps to/from
OR126 EB & WB to Pioneer Pkwy (OR528) and "Q" St will be
intermittently closed Monday - Thursday nights between the hours of 7
PM & 8 AM. No closures will be in place from 8 AM Friday until 7 PM
Monday. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 5.9 To 6.29
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Mohawk Blvd (Springfield)
Effective June 27, 2013, the on- and off-ramp to/from Mohawk Blvd will
be intermittently closed per the following schedule: eastbound -
Monday through Thursday nights, 7 PM to 8 AM; westbound - Monday
through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on
the OR126 mainline. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 7.16 To 7.44
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield)
Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be
intermittently closed per the following schedule: eastbound - Monday
through Thursday nights, 7 PM to 11 AM; westbound - Monday through
Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126
mainline. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 7.19 To 7.47
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield)
Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be
intermittently closed per the following schedule: eastbound - Monday
through Thursday nights, 7 PM to 11 AM; westbound - Monday through
Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126
mainline. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE138 MP 52.5
Informational only; Crash/Hazard
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Hazardous debris, use caution. Watch for possible rocks and
tree debris in the area.
Last Updated: 08/06/2013 11:26 am
ORE164 MP 6.24
Informational only; Commercial Vehicle Information
Details: OR164 (Jefferson Hwy) MP 6.24 (Santiam River Bridge) -
Jefferson OR164 at MP 6.24 crossing the Santiam River Bridge is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs.
single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3
for Non-Divisible loads.
Updated: 08/16/2013 10:00 am
ORE226 MP 19 To 23
Future Event: Estimated delay under 20 minutes; Maintenance Work
Expected Start Date: 8/21/2013 7:00:00 AM
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: A crew will be chip sealing and striping. Work hours will be
7 AM to 7 PM. Flaggers and pilot car will direct traffic.
Updated: 08/08/2013 09:01 am
ORE228 MP .01 To 20
Estimated delay of 20 minutes - 2 hours; Information
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: A music event is taking place off of Hwy 228 in the
Brownsville area. This may cause traffic delays. Please proceed with
caution.
Last Updated: 08/16/2013 3:08 pm
ORE241 MP .51
Informational only; Commercial Vehicle Information
Details: OR241 MP 0.51 (Isthmus Slough) MP 0.51 Isthmus Slough (1/2
mile from US101) is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle - 80,000 lbs. GVW., Weight Table 1
Updated: 08/16/2013 10:00 am
ORE569 MP 8.46
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays
between 10 p.m. and 6 a.m. each day until bridge work is done. Use
caution. This project will seal small cracks in the decks of various
concrete bridges on Randy Pape' Beltline Highway and I-105 in Eugene.
Current schedule: 8/12 Beltline over River Rd. both directions
8/13 I-105 WB to 7th Ave. 8/14 I-105 WB to 7th Ave. 8/15 I-105 WB to
7th Ave. 8/16 7th Ave. to I-105 EB 8/19 7th Ave. to I-105 EB 8/20 7th
Ave. to I-105 EB 8/21 I-105 Future Ramp both directions 8/22 I-105
Future Ramp if needed 8/23 Ramp from 6th Ave to I-105 East 8/24 I-105
ramp down to 6th Ave. West
Updated: 08/16/2013 3:01 pm
ORE569 MP 12.26 To 13
Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9,
2013, this section of OR569 will be restricted to 14 feet 00 in. in
width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM.
In addition, the height will be restricted to 19 feet 01 in. in height
eastbound, and 18 feet 09 in. in height westbound during the same
time. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.53 To 12.95
Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9,
2013, this section of OR569 will be restricted to 14 feet 00 in. in
width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM.
In addition, the height will be restricted to 19 feet 01 in. in height
eastbound, and 18 feet 09 in. in height westbound during the same
time. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.76
Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the
ramp from OR569 westbound to I-5 southbound will be intermittently
closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30
AM. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.79
Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the
ramp from OR569 eastbound to I-5 northbound will be intermittently
closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30
AM. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
US20 MP 15.24 To 24.25
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Watch for increased truck traffic. Flaggers will be used to
control traffic. Delays are expected to be 5 mintues or less. This
project straightens the current US20 alignment by removing a very
sharp curve to the east of Eddyville. Signs, pavement marking,
drainage features, and traffic warning devices will also be removed,
adjusted, and installed throughout the project.
Updated: 08/09/2013 12:04 pm
US20 MP 15.25 To 24.25
Informational only; Commercial Vehicle Information
Details: US20 MP 15.24 to MP 24.25 EB & WB) (Eddyville) Effective July
30, 2013, this section of US20 will be restricted to 12 feet 00 in. in
width per the following schedule: MP 15.24 to MP 17 - Monday to
Saturday between 6 PM & 8 AM; MP 17 to MP 24.25 - Monday to Friday
between 7 AM & 5:30 PM. In addition, the Yaquina River Bridge on
Monday to Friday between 7 AM & 5:30 PM will be restricted to 20,000
lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight
Table 2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs.
tandem axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Loads that are normally allowed to exceed these weights by straddling
the centerline and reducing travel speed to 25 mph will not be able to
during these times without advance notice and coordination. Contact
the Over-Dimension Permit Unit at 503-373-0000 to coordinate a
date/time this may be allowed. Estimated date of completion is
September 15, 2013.
Updated: 08/16/2013 10:00 am
US20 MP 16.29 To 21.88
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: The project will be installing horizontal drains, 78"
structural plate pipe, rock drainage features and earthwork. No delays
anticipated.
Updated: 08/09/2013 11:59 am
US20 MP 23.38
Informational only; Commercial Vehicle Information
Details: US20 (Corvallis-Newport Hwy) MP 23.38 (Yaquina River Bridge -
Eddyville) Effective May 19, 2006, the Yaquina River Bridge near
Eddyville is restricted to the following weights: 20,000 lbs. single
axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW., Weight Table 2 for
divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle,
98,000 lbs. GVW., Weight Table 3 for non-divisible loads. Vehicles
exceeding these weights may cross the bridge if they straddle the
centerline, do not exceed 25 MPH and are the only vehicle on the
bridge. Certified flaggers are required to stop traffic.
Updated: 08/16/2013 10:00 am
US20 MP 25.14 To 27.54
Informational only; Commercial Vehicle Information
Details: US20 MP 25.1 to MP 27.7 EB & WB (Eddyville) Effective August
18, 2013, this section of US20 will be restricted to 12 feet 00 in. in
width from 7 PM until 1/2 hr after sunset, and from 1/2 hr before
sunrise until 7 AM. In addition, this section of US20 will be
restricted to 11 feet 00 in. in width from 1/2 hr after sunset until
1/2 hr before sunrise (NIGHTTIME). No restrictions will be in place
from 7 AM Friday until 7 PM Sunday. Estimated date of completion is
September 12, 2013.
Updated: 08/16/2013 10:00 am
US97 MP 194.65 To 200.3
Estimated delay under 20 minutes; Construction Work
Comments: Construction work continuing. Expect delays up to 20 Minutes
No work scheduled for this week 8/19/2013
Updated: 08/15/2013 2:38 pm
US101 MP 134.08 To 139.11
Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Beginning mid August through late September, US101 will be
paved from Beverly Beach Park to the north end of Newport. All work
will be done at night.
Updated: 07/26/2013 1:23 pm
US101 MP 141.67
Informational only; Commercial Vehicle Information
Details: US101 MP 141.67 (Yaquina Bay Bridge) Effective March 1, 2013,
the Yaquina Bay Bridge in Newport is restricted to 20,000 lbs. single
axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 for
Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle -
98,000 lbs. GVW, Weight Table 3 for Non-Divisible loads. Non-divisible
loads exceeding these weights (up to Weight Table 5) may cross the
bridge if they stop traffic/straddle the centerline and are the only
vehicle on the bridge when crossing. Certified flaggers are required
to stop both northbound and southbound traffic. The rolling stop
method is not allowed.
Updated: 08/16/2013 10:00 am
US101 MP 146.9 To 153.2
Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Beginning mid August into September, US101 will be paved
from Lost Creek to Seal Rock. All work is planned to be done at night.
Updated: 07/26/2013 1:25 pm
US101 MP 154.7 To 155.25
Informational only; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: US101 will be paved from Alsea Bay Bridge extending north a
half mile, starting mid August thru September. All work is planned to
be done at night.
Updated: 07/26/2013 1:18 pm
US101 MP 155
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: The one lane of travel will be closed during the painting of
the bridge. Flaggers will direct traffic. Delays are not expected.
This project will remove rust and paint the outer and inner arches of
the Alsea Bay Bridge in Waldport. In addition, the project will also
paint the pedestrian rails and other portions of the bridge not
painted before. Project will construct a new steel walkway below the
bridge deck. This walkway will allow access for routine bridge
inspections.
Updated: 08/09/2013 12:25 pm
US101 MP 190.98
Informational only; Commercial Vehicle Information
Details: US101 MP 190.98 Siuslaw River (Florence) Effective March 17,
2003 at MP 190.98 Siuslaw River Bridge is restricted to 20,000 lbs.
single axle, 34,000 lbs. tandem axle - 105,500 lbs. GVW. Weight Table
2 for Divisible loads; 21,500 lbs. single axle, 43,000 lbs. tandem
axle - 98,000 lbs. GVW. Weight Table 3 for Non-Divisible loads.
Updated: 08/16/2013 10:00 am
US101 MP 233.47 To 234.5
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) Median , 1 Lane (Southbound) Median , 1 Lane
Comments: Expect intermittent week-night lane closures on the
McCullough Bridge.
Updated: 08/09/2013 9:34 pm
US101 MP 234 To 238
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Expect intermittent lane and shoulder closures, use caution.
There are nighttime lane closures, 7 PM to 7 AM, on US Hwy 101. This
project is replacing traffic signals in preparation for paving, summer
of 2013, from McCullough Bridge in North Bend to Fir Street. in Coos
Bay.
Updated: 08/09/2013 9:35 pm
Central Oregon Road Conditions by Route
ORE27 MP 1.9
Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 1.90 This bridge is restricted to
21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs.
tri-axle; Weight Table 4.
Updated: 08/16/2013 10:00 am
ORE27 MP 2.88
Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 2.88 This bridge is restricted to
21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs.
tri-axle; Weight Table 4.
Updated: 08/16/2013 10:00 am
ORE27 MP 4.62
Informational only; Commercial Vehicle Information
Details: OR27 Irrigation Ditch at MP 4.59 This bridge is restricted to
21,500 lbs. single axle, 43,000 lbs. tandem axle, 60,000 lbs.
tri-axle; Weight Table 4.
Updated: 08/16/2013 10:00 am
ORE27 MP 27.23
Informational only; Commercial Vehicle Information
Details: OR27 MP 27.23 Bear Creek OR27 MP27.23 Bear Creek Bridge is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle,
105,500 lbs GVW; Weight Table 2.
Updated: 08/16/2013 10:00 am
US20 MP 99 To 100
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Road construction is occurring causing no to minimum delays,
use caution. Barclay Drive temporarily closed between Larch and Camp
Polk Road (Locust) till August 16 for road reconstruction, with a
detour route using US20 and Larch. Barclay Drive from Locust to Pine
Street will be paved during the week of August 12 during daytime
requiring single lane closures with flaggers. Motorists are familiar
with the Barclay Drive as it is the alternate east-west route through
downtown Sisters. Possible shoulder work on westbound US20 at the east
end of town approaching Locust.
Updated: 08/13/2013 1:29 pm
US20 MP 131.44 To 131.92
Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.44 to MP 131.92 (Burns) Effective September
7, 2013, this section of US20/US395 will be closed between the hours
of 9 AM & 11 AM for one day only.
Updated: 08/16/2013 10:00 am
US20 MP 131.5 To 131.92
Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.50 to MP 131.92 (Burns) Effective September
9, 2013, this section of US20/US395 will be closed between the hours
of 11 AM & 11 PM for one day only.
Updated: 08/16/2013 10:00 am
US26 MP 33.99 To 37.44
Informational only; Commercial Vehicle Information
Details: US26 MP 33.99 to MP 37.44 EB & WB (east of Prineville)
Effective August 8, 2013, this section of US26 will be restricted to
14 feet 00 in. in width. No restrictions will be in place from 3 PM
Friday until 12 midnight Sunday. Estimated date of completion is
September 22, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 91 To 102.6
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Expect single lane closures and traffic will be controlled
by flaggers and pilot cars. Expect 20 min or less delays. During the
week of August 18th to August 24th the contractor will be constructing
the EB passing lane. Traffic will be controlled by flaggers and pilot
cars. Delays will be less than 20 minutes.
Updated: 08/15/2013 12:50 pm
US26 MP 103.27 To 91.71
Informational only; Commercial Vehicle Information
Details: US26 MP 91.74 to MP 102.62 EB & WB (Warm Springs) Effective
July 15, 2013, this section of US26 will be restricted to 18 feet 00
in. in width between the hours of 7 AM & 7 PM. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 105.26
Informational only; Commercial Vehicle Information
Details: US26 MP 105.26 WB (Warm Springs) Effective August 12, 2013,
this section of US26 westbound will be restricted to 16 feet 00 in. in
width between the hours of 6 AM & 5 PM (DAYTIME). Estimated date of
completion is August 30, 2013.
Updated: 08/16/2013 10:00 am
US97 MP 130.35
Informational only; Commercial Vehicle Information
Details: US97 MP 130.35 NB & SB (north of Bend) Effective August 8,
2013, this section of US97 will be restricted to 16 feet 00 in. in
width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2
hr after sunset. This section of US97 will be restricted to 12 feet 00
in. in width from 1/2 hr after sunset until 1/2 hr before sunrise. In
addition, this section of US97 will be restricted to 17 feet 08 in. in
height northbound, and 17 feet 04 in. in height southbound between the
hours of 7 PM & 7 AM. No restrictions will be in place from 7 AM
Friday until 7 PM Sunday. Estimated date of completion is August 22,
2013.
Updated: 08/16/2013 10:00 am
US97 MP 140 To 142
No to Minimum Delay; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Traffic control will be in place with a single lane closure
in each direction from 8 PM to 7AM. Flaggers will control traffic in
the work zone. Sanitary sewer installation on Brookswood Boulevard
from Pinebrook Boulevard to Finchwood Drive is planned during the
week. Work will occur Mondays through Fridays, from 7AM to 4PM, with
an expected completion date on Brookswood of August 30. Flaggers will
control traffic in the work zone in a manner sensitive to the
commuting traffic patterns. Starting the week of August 19, sewer work
will begin on Deer Valley Road. Starting August 19, Pinebrook between
US97 and 3rd Street will be reconstructed. Motorists normally using
Pinebrook between US97 and 3rd Street should plan to take alternate
routes during the reconstruction. The reconstruction is expected to
take approximately 3 weeks.
Updated: 08/13/2013 10:16 am
US97 MP 194.65 To 200.3
Estimated delay under 20 minutes; Construction Work
Comments: Construction work continuing. Expect delays up to 20 Minutes
No work scheduled for this week 8/19/2013
Updated: 08/15/2013 2:38 pm
East Oregon Road Conditions by Route
I-84 MP 369.99 To 377.9
Informational only; Commercial Vehicle Information
Details: I-84 MP 368.16 to MP 377.93 EB & WB (near Ontario) Effective
March 19, 2013, this section of I-84 will be restricted to 13 feet 00
in. in width between the hours of 6 PM & 6 AM. In addition, this
section of I-84 will be restricted to 16 feet 00 in. in width between
the hours of 6 AM & 6 PM. Estimated date of completion is October 31,
2013.
Updated: 08/16/2013 10:00 am
I-84 MP 371.45
Informational only; Commercial Vehicle Information
Details: I-84 MP 371.45 EB & WB crossing under Stanton Blvd (west of
Ontario) Effective March 19, 2013, this section of I-84 will be
restricted to 16 feet 09 in. in height. Estimated date of completion
is October 31, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 371.46
Informational only; Commercial Vehicle Information
Details: I-84 MP 371.45 EB & WB crossing under Stanton Blvd (west of
Ontario) Effective March 19, 2013, this section of I-84 will be
restricted to 16 feet 09 in. in height. Estimated date of completion
is October 31, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 373.08
Informational only; Commercial Vehicle Information
Details: I-84 MP 373.08 EB & WB crossing under Chester Blvd (west of
Ontario) Effective March 19, 2013, this section of I-84 will be
restricted to 16 feet 04 in. in height. Estimated date of completion
is October 31, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 378 To 368
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) 2 Lanes
Comments: Road construction is occurring, use caution. Detours are
available. Travelers can expect lane closures over the next few weeks
as crews install construction signs and build four crossovers in the
median at different locations. Temporary ramp closures at the Stanton
Blvd. Interchange (I-84 Exit 371), the North Ontario Interchange (Exit
374) and the East Idaho Avenue Interchange (Exit 376) will also be
required to accommodate paving operations. A three-day closure of the
westbound on-ramp at Exit 374 (OR 201 overpass) is scheduled to begin
March 6. This closure will require travelers to detour eastbound on
I-84 to Exit 376B, where they can cross the overpass and access the
westbound freeway.
Updated: 08/07/2013 07:09 am
US20 MP 131.44 To 131.92
Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.44 to MP 131.92 (Burns) Effective September
7, 2013, this section of US20/US395 will be closed between the hours
of 9 AM & 11 AM for one day only.
Updated: 08/16/2013 10:00 am
US20 MP 131.5 To 131.92
Informational only; Commercial Vehicle Information
Details: US20/US395 MP 131.50 to MP 131.92 (Burns) Effective September
9, 2013, this section of US20/US395 will be closed between the hours
of 11 AM & 11 PM for one day only.
Updated: 08/16/2013 10:00 am
US30 MP .46
Informational only; Commercial Vehicle Information
Details: US30 (Huntington Hwy) MP 0.46 Effective June 16, 2011, the
Burnt River Bridge on US30 at MP 0.46 in Lime just off I-84 is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW. Weight Table 2 for Divisible loads; 21,500 lbs.
single axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW. Weight Table 3
for Non-Divisible loads.
Updated: 08/16/2013 10:00 am
Southwest Oregon Road Conditions by Route
I-5 MP 14.96 To 26.87
Informational only; Commercial Vehicle Information
Details: I-5 MP 14.96 to MP 27.09 NB & SB (north of Ashland) Effective
July 28, 2013, this section of I-5 will be restricted to 16 feet 00
in. in width from 1/2 hr before sunrise until 7 AM, and from 7 PM
until 1/2 hr after sunset. This section of I-5 will be restricted to
12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr before
sunrise. In addition, this section of I-5 will be restricted to 16
feet 01 in. in height southbound, and 16 feet 11 in. in height
northbound between the hours of 7 PM & 7 AM. Estimated date of
completion is September 15, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 35.27
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 35 ramp to OR99 and Blackwell Rd / Hwy #270
(Central Point) Effective August 20, 2013, the ramp from I-5
northbound Exit 35 to OR99 and Blackwell Rd / Hwy #270 will be closed
between the hours of 6 PM & 6 AM. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 36.6 To 44.1
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes
Comments: There will be ramp closures Sunday and Monday nights, then
lane closures from 6 PM to 6 AM, weeknights, for paving. Work is
scheduled to continue through the end of August.
Updated: 08/09/2013 10:11 pm
I-5 MP 36.64
Informational only; Commercial Vehicle Information
Details: I-5 MP 36.64 Tolo Rd crossing over I-5 (Central Point)
Effective July 22, 2013, Tolo Rd crossing over I-5 is restricted to
the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem
axle - 80,000 lbs. GVW. Weight Table 1.
Updated: 08/16/2013 10:00 am
I-5 MP 40
OFF RAMP
No to Minimum Delay; Construction Work
Comments: Expect intermittent ramp and lane closures. Use caution, as
crews are doing finish work in the area. Watch for signs and
equipment. Ramps Affected.
Updated: 08/09/2013 9:59 pm
I-5 MP 40.65 To 41.02
Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 40 on- and off-ramps (Gold Hill) Effective
August 6, 2013, the on- and off-ramps to/from I-5 northbound and
southbound Exit 40 to Gold Hill will be intermittently closed between
the hours of 6 PM & 6 AM. The closures are NOT on the I-5 mainline.
Estimated date of completion is August 19, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 40.66 To 40.97
Informational only; Commercial Vehicle Information
Details: I-5 NB & SB Exit 40 on- and off-ramps (Gold Hill) Effective
August 6, 2013, the on- and off-ramps to/from I-5 northbound and
southbound Exit 40 to Gold Hill will be intermittently closed between
the hours of 6 PM & 6 AM. The closures are NOT on the I-5 mainline.
Estimated date of completion is August 19, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 48 To 83
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Southbound) 2 Lanes (Northbound) 2 Lanes , Shoulder
Comments: Expect intermittent single lane closures both night and
daytime, for paving. Use caution and watch for signs and construction
equipment. The NB shoulder from Hugo to Sexton Pass, (MP 66-69),is
closed until this fall, for building a climbing lane. This is part of
a project to pave I-5 between Hugo and Glendale, and make safety
improvements. Use caution and watch for construction equipment and
workers in the area.
Updated: 08/09/2013 9:37 pm
I-5 MP 48.51 To 55.4
Informational only; Commercial Vehicle Information
Details: I-5 MP 48.00 to MP 55.42 NB & SB (south of Grants Pass)
Effective August 25, 2013, this section of I-5 will be restricted to
16 feet 00 in. in width from 1/2 hr before sunrise until 7 AM, and
from 7 PM until 1/2 hr after sunset. In addition, this section of I-5
will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset
until 1/2 hr before sunrise. No restrictions will be in place from 7
AM Friday until 7 PM Sunday. Estimated date of completion is September
20, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 48.52 To 55.4
Informational only; Commercial Vehicle Information
Details: I-5 MP 48.00 to MP 55.42 NB & SB (south of Grants Pass)
Effective August 25, 2013, this section of I-5 will be restricted to
16 feet 00 in. in width from 1/2 hr before sunrise until 7 AM, and
from 7 PM until 1/2 hr after sunset. In addition, this section of I-5
will be restricted to 12 feet 00 in. in width from 1/2 hr after sunset
until 1/2 hr before sunrise. No restrictions will be in place from 7
AM Friday until 7 PM Sunday. Estimated date of completion is September
20, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 49.01
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 48 to Depot St (Rogue River) Effective August 25,
2013, the I-5 southbound Exit 48 off-ramp to Depot St will be closed
between the hours of 7 PM & 7 AM. Estimated date of completion is
September 26, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 49.03
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Depot St (Rogue River) Effective August
25, 2013, the ramp from Depot St to I-5 northbound will be closed
between the hours of 7 PM & 7 AM. Estimated date of completion is
September 26, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 66.55 To 81.08
Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass)
Effective May 19, 2013, this section of I-5 will be restricted to 12
feet 00 in. in width and 16 feet 08 in. in height between the hours of
7 PM & 9 AM. In addition, the following ramps will be intermittently
closed during the same time: Exit 71 (Sunny Valley); Exit 76 (Wolf
Creek); Exit 78 (Speaker Rd); Exit 80 (Glendale). No restrictions will
be in place from 9 AM Friday until 7 PM Sunday. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 66.64 To 81.08
Informational only; Commercial Vehicle Information
Details: I-5 MP 66.5 to MP 81.7 NB & SB (north of Grants Pass)
Effective May 19, 2013, this section of I-5 will be restricted to 12
feet 00 in. in width and 16 feet 08 in. in height between the hours of
7 PM & 9 AM. In addition, the following ramps will be intermittently
closed during the same time: Exit 71 (Sunny Valley); Exit 76 (Wolf
Creek); Exit 78 (Speaker Rd); Exit 80 (Glendale). No restrictions will
be in place from 9 AM Friday until 7 PM Sunday. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 69.08 To 74.1
Informational only; Commercial Vehicle Information
Details: I-5 SB MP 75.5 to MP 69.7 SB (Sunny Valley) Effective June
17, 2013, this section of I-5 southbound will be restricted to 11 feet
00 in. in width between the hours of 7 PM & 9 AM. No restrictions will
be in place from 9 AM Friday until 7 PM Sunday. Estimated date of
completion is July 22, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 71.34 To 71.72
Informational only; Commercial Vehicle Information
Details: I-5 MP 71.2 to MP 71.9 NB & SB (Sunny Valley) Effective July
28, 2013, this section of I-5 will be restricted to 16 feet 00 in. in
width. Estimated date of completion is August 4, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 71.36 To 71.72
Informational only; Commercial Vehicle Information
Details: I-5 MP 71.2 to MP 71.9 NB & SB (Sunny Valley) Effective July
28, 2013, this section of I-5 will be restricted to 16 feet 00 in. in
width. Estimated date of completion is August 4, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 71.59
Informational only; Commercial Vehicle Information
Details: I-5 Exit 71 NB & SB off-ramps (Sunny Valley) Effective
September 8, 2013, the ramps from I-5 Exit 71 to Sunny Valley will be
intermittently closed on Sunday to Thursday nights between the hours
of 7 PM & 7 AM. No ramp closures will be in place from 7 AM Friday
until 7 PM Sunday. Estimated date of completion is September 19, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 71.72
Informational only; Commercial Vehicle Information
Details: I-5 MP 71.72 NB & SB (Sunny Valley) Effective September 8,
2013, this section of I-5 will be restricted to 16 feet 00 in. in
width from 1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2
hr after sunset. In addition, this section of I-5 will be restricted
to 12 feet 00 in. in width from 1/2 hr after sunset until 1/2 hr
before sunrise. No restrictions will be in place from 7 AM Friday
until 7 PM Sunday. Estimated date of completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 99.53
Informational only; Commercial Vehicle Information
Details: I-5 MP 99.53 NB & SB (Canyonville) Effective July 30, 2013,
this section of I-5 will be restricted to 16 feet 00 in. in width from
1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2 hr after
sunset. In addition, this section of I-5 will be restricted to 12 feet
00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise.
No restrictions will be in place from 7 AM Friday until 7 PM Sunday.
Estimated date of completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 99.57
Informational only; Commercial Vehicle Information
Details: I-5 MP 99.53 NB & SB (Canyonville) Effective July 30, 2013,
this section of I-5 will be restricted to 16 feet 00 in. in width from
1/2 hr before sunrise until 7 AM, and from 7 PM until 1/2 hr after
sunset. In addition, this section of I-5 will be restricted to 12 feet
00 in. in width from 1/2 hr after sunset until 1/2 hr before sunrise.
No restrictions will be in place from 7 AM Friday until 7 PM Sunday.
Estimated date of completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 104.85
Informational only; Commercial Vehicle Information
Details: I-5 MP 104.85 Chadwick Ln crossing over I-5 (near Riddle)
Chadwick Ln crossing over I-5 is restricted to the following weights:
20,000 single axle, 34,000 lbs. tandem axle - 80,000 lbs. GVW. Weight
Table 1.
Updated: 08/16/2013 10:00 am
ORE39 MP -.14 To .15
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Intermittent
traffic control with flaggers. Sidewalk construction scheduled for
this week.
Updated: 08/09/2013 9:14 pm
ORE39 MP 13.6 To 14.5
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution, at the
Merrill/Lakeview Jct and 6th st. Intermittent traffic control with
flaggers. 7PM to 7 AM Mon-Fri.
Updated: 08/09/2013 9:23 pm
ORE42 MP 23 To 38
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect traffic control with flaggers and pilot car for chip
sealing. Use caution and watch for loose rock in the roadway.
Updated: 08/09/2013 9:36 pm
ORE62 MP 10 To 13
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder
Comments: Expect single-lane closures with flaggers for night work.
Hours will be 7 PM to 7 AM. The Barton Road intersection at the
highway will be closed during this time.
Updated: 08/09/2013 9:57 pm
ORE62 MP 10.09 To 12.99
Informational only; Commercial Vehicle Information
Details: OR62 MP 10.0 to MP 13.5 EB & WB (Eagle Point) Effective June
26, 2013, this section of OR62 will be restricted to 12 feet 00 in. in
width. Estimated date of completion is October 18, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 11.15
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes
Comments: Intermittent lane closures and flaggers for utility work,
throughout the interchange area. This is in preparation for the
interchange project scheduled to begin early next year.
Updated: 08/09/2013 10:29 pm
ORE234 MP .04
Informational only; Commercial Vehicle Information
Details: OR234 MP 0.04 - Rogue River Bridge - Gold Hill OR234 Rogue
River Bridge at MP 0.04 is restricted to 20,000 lbs. single axle,
34,000 lbs. tandem axle - 105,500 lbs. GVW, Weight Table 2 Divisible
Loads; 21,500 lbs. single axle, 43,000 lbs. tandem axle - 98,000 lbs.
GVW, Weight Table 3 Non-Divisible Loads.
Updated: 08/16/2013 10:00 am
ORE422 MP 5
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intermittent traffic control with flaggers. Use caution.
Waterline relocation is scheduled for this week. This bridge work is
in Chiloquin; the Williamson River bridge.
Updated: 08/09/2013 9:01 pm
US101 MP 338.9 To 339.71
Informational only; Commercial Vehicle Information
Details: US101 MP 339.02 to MP 339.50 NB & SB Effective August 26,
2013, this section of US101 will be restricted to 11 feet 00 in. in
width. Estimated date of completion is October 27, 2013.
Updated: 08/16/2013 10:00 am
US101 MP 339.1 To 339.71
Informational only; Commercial Vehicle Information
Details: US101 MP 339.02 to MP 339.50 NB & SB Effective December 12,
2012, this section of US101 will be restricted to 17 feet 00 in. in
height. Estimated date of completion is December 30, 2013.
Updated: 08/16/2013 10:00 am
US101 MP 339.2 To 340
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intermittent traffic control with flaggers for work on the
Pistol River Bridge. There is a temporary traffic signal in place,
expect delays. The temporary signal is the contractor's
responsibility.
Updated: 08/09/2013 9:36 pm
US101 MP 339.71 To 339.1
Informational only; Commercial Vehicle Information
Details: US101 MP 339.02 to MP 339.50 NB & SB Effective December 26,
2012, this section of US101 will be restricted to 16 feet 00 in. in
width. Estimated date of completion is August 26, 2013.
Updated: 08/16/2013 10:00 am
US199 MP 6.9
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane , Shoulder (Southbound) 1 Lane , Shoulder
Comments: Expect intermittent, weeknight, lane closures for work on
the Applegate River Bridge. All lanes are open on weekends and from 10
AM and 6 PM weekdays. Watch for workers and equipment on the shoulder
of the highway on US 199 and Riverbanks Road.
Updated: 08/09/2013 9:50 pm
South Oregon Road Conditions by Route
ORE39 MP -.14 To .15
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. Intermittent
traffic control with flaggers. Sidewalk construction scheduled for
this week.
Updated: 08/09/2013 9:14 pm
ORE39 MP 13.6 To 14.5
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Road construction is occurring, use caution, at the
Merrill/Lakeview Jct and 6th st. Intermittent traffic control with
flaggers. 7PM to 7 AM Mon-Fri.
Updated: 08/09/2013 9:23 pm
ORE422 MP 5
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: Intermittent traffic control with flaggers. Use caution.
Waterline relocation is scheduled for this week. This bridge work is
in Chiloquin; the Williamson River bridge.
Updated: 08/09/2013 9:01 pm
US395 MP 128
No to Minimum Delay; Crash/Hazard
Lanes Affected: (Northbound) 1 Lane (Southbound) 1 Lane
Comments: A crash has occurred causing no to minimum delays, use caution.
Last Updated: 08/16/2013 5:31 pm
Southeast Oregon Road Conditions by Route
No adverse road conditions reported at this time.
City of Bend Road Conditions by Route
US97 MP 20.99
Informational only; Commercial Vehicle Information
Details: US97 Business (3rd St) at railroad crossing south of US20
(Bend) Effective June 17, 2013, US97 Business (3rd St) at the railroad
crossing south of US20 will be closed between the hours of 7 PM & 7
AM. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
City of Eugene Road Conditions by Route
I-5 MP 189.65
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 189 ramp to 30th Ave & OR225/McVay Hwy Effective
August 11, 2013, the ramp from I-5 northbound Exit 189 to 30th Ave &
OR225/McVay Hwy will be intermittently closed Sunday - Thursday nights
between the hours of 7 PM & 6 AM. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 192 To 193.5
Estimated delay under 20 minutes; Construction Work
Comments: Southbound speed limit reduced to 50 mph. Watch for
construction vehicles, work crews and traffic sign changes. Expect
night time lane closures. Interstate 5 (between mileposts 192.0 and
193.5): The southbound speed limit is reduced to 50 mph. Watch for
construction vehicles entering and exiting the travel lanes at the
median in both directions. Please drive carefully through the work
zone. Watch for temporary traffic signs, roadside work crews and
equipment. Watch for nighttime single-lane and shoulder closures.
Updated: 08/16/2013 2:30 pm
I-5 MP 192.1 To 193.4
Estimated delay under 20 minutes; Construction Work
Comments: Watch for lane and shoulder closures in both directions. Use
extra caution at the intersection of Franklin and Jenkins Drive.
Franklin Boulevard under I-5: Watch for roadside work crews and
construction vehicles entering and exiting the travel lanes from the
roadway shoulder and at the intersection of Franklin Boulevard and
Jenkins Drive. Watch for single-lane and shoulder closures in both
directions. Please drive carefully and obey all construction signs and
flagger instructions.
Updated: 08/16/2013 2:30 pm
I-5 MP 195.02 To 195.46
Informational only; Commercial Vehicle Information
Details: I-5 MP 195.00 to MP 195.46 NB & SB (Eugene) Effective April
9, 2013, this section of I-5 will be restricted to 17 feet 00 in. in
width and 16 feet 03 in. in height on Monday - Thursday nights between
the hours of 7 PM & 6:30 AM. Estimated date of completion is November
30, 2014.
Updated: 08/16/2013 10:00 am
I-5 MP 195.45 To 195.46
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , Shoulder (Northbound) Median , Shoulder
Comments: Speed reduction to 35 MPH on Beltline; and 50 MPH on I 5
through construction zone. Watch for lane closures and trucks entering
or exiting highway. A speed limit reduction to 35 MPH is now in effect
on Beltline. A speed limit reduction to 50 MPH is now in effect for
I-5 through the construction zone. Most work will be happening behind
barrier. Look for periodic lane closures and trucks entering and
exiting the highway. Project Summary: This project will rebuild the
interchange at Interstate 5 and Randy Pape� Beltline Highway to meet
modern design and safety standards. State funds from the Jobs and
Transportation Act will build: - A new I-5 southbound to westbound
Beltline off-ramp. - A new I-5 southbound to eastbound Beltline
off-ramp. - A new westbound Beltline to southbound I-5 on-ramp - A new
Beltline Bridge over I-5 - And base construction and structures for a
new multi-use path to connect south of the interchange to north of the
interchange. The path will open upon completion of Unit 4 scheduled to
be constructed in 2016. This is a two year project. Construction of
Unit 3 is scheduled to be completed by November 2014.
Updated: 08/16/2013 2:42 pm
I-5 MP 195.45 To 195.46
Informational only; Construction Work
Lanes Affected: (Southbound) 3 Lanes (Northbound) 3 Lanes
Comments: The posted speed limit has been reduced to 35 on the
Beltline bridge and 50 on Interstate 5 near the interchange due to
construction work zone. New, lower speed limits have been implemented
on the Randy Pap� Beltline bridge over Interstate 5, and on I-5
beneath the bridge where construction has begun on a two-year project
to improve the I-5/Beltline interchange. Beginning Wednesday, April
17, 2013, the posted, enforceable speed limit on the Beltline bridge
over I-5 will be 35 miles per hour. The speed limit on I-5 near the
interchange will be reduced to 50 miles per hour. The speed limit
reductions will be enforced until the project is completed in fall of
2014. The speed limit reductions are intended to improve work zone
safety for all highway users and construction workers. From 2007
through 2011 in Oregon, 53 people died and more than 2,200 were
injured in work zone crashes. The majority of people injured or killed
in these crashes were drivers, passengers or pedestrians, not workers.
The single biggest factor in crashes is driver inattention; that�s why
orange cones, variable message signs and other tools are used to alert
motorists. The other major contributing factor is speed, which is why
work zones often require lower speed limits. National Work Zone
Awareness Week is April 16-19. To learn more about work zone safety,
visit ODOT�s safety website at:
http://www.oregon.gov/ODOT/TS/pages/workzonesafety.aspx
Updated: 07/25/2013 4:27 pm
I-5 MP 198.39 To 199.38
Informational only; Commercial Vehicle Information
Details: I-5 MP 198.01 to MP 199.41 NB & SB (Coburg) Effective June
24, 2013, this section of I-5 will be restricted to 16 feet 00 in. in
width on Monday to Thursday between the hours of 8 PM & 6 AM. In
addition, the height will be restricted to 15 feet 10 in. in height
southbound during the same time. Estimated date of completion is
August 24, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 199.15
Informational only; Commercial Vehicle Information
Details: I-5 MP 199.15 NB & SB (Coburg) Effective August 12, 2013,
this section of I-5 will be closed between the hours of 8 PM & 6 AM.
When closed, traffic will be directed to take Exit 199 and re-enter
I-5. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-105 MP .18
Informational only; Commercial Vehicle Information
Details: I-105 WB ramp to OR99 / W 6th Ave NB (Eugene) Effective
August 24, 2013, the ramp from I-105 eastbound to OR99 (W 6th Ave)
nothbound will be closed between the hours of 10 PM & 6 AM. Estimated
date of completion is August 25, 2013.
Updated: 08/16/2013 10:00 am
I-105 MP .21
Informational only; Commercial Vehicle Information
Details: I-105 EB ramp from OR99 / W 6th Ave NB (Eugene) Effective
August 23, 2013, the ramp from OR99 (W 6th Ave) northbound to I-105
eastbound will be closed between the hours of 10 PM & 6 AM. Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
I-105 MP .26 To .261
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays
between 10 p.m. and 6 a.m. each day until bridge work is done. Use
caution. This project will seal small cracks in the decks of various
concrete bridges on Randy Pape� Beltline Highway and I-105 in Eugene.
Remarks: Work will be done at night between 10pm and 6am at the
following locations: Thurs August 15th I-105 WB to 7th Ave. Fri August
16th 7th Ave to I-105 EB Mon August 19th 7th Ave to I-105 EB Tues
August 20th 7th Ave to I-105 EB Weds August 21st 7th Ave to I-105 EB
Thurs August 22nd I-105 Future Ramp Fri August 23rd Ramp from 6th Ave
to I-105 East Sat August 24th I-105 ramp down to 6th Ave West
Updated: 08/16/2013 3:06 pm
ORE126 MP 1.34
Informational only; Commercial Vehicle Information
Details: OR126 Business WB MP 1.34 (Main St. Springfield) MP 1.34
Willamette River Bridge (1 mile east of I-5 in Springfield) is
restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle -
105,500 lbs. GVW., Weight Table 2 Divisible loads; 21,500 lbs. single
axle, 43,000 lbs. tandem axle - 98,000 lbs. GVW., Weight Table 3
Non-Divisible loads
Updated: 08/16/2013 10:00 am
ORE126 MP 3.79
Informational only; Commercial Vehicle Information
Details: OR126 WB ramp to I-5 NB (Springfield) Effective July 23,
2013, the ramp from OR126 westbound to I-5 northbound will be
intermittently closed on Monday - Thursday nights between the hours of
7 PM & 5:30 AM. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 3.8 To 9.9
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) 1 Lane (Eastbound) 1 Lane
Comments: Expect single lane and ramp closures off and on in both
directions between I-5 and Main Street through September. Most work is
being done at night. Construction will continue until late September.
Much of the work will be completed at night to avoid peak travel
times. During construction, motorists can expect single lane closures
in both directions; ramp closures; and a weekend closure of the 42nd
Street eastbound interchange. Upcoming lane closures and ramps
closures include: � Cable Median Barrier � Mohawk to Main Street: Some
work in the median and short-term lane closures are possible during
the day, nighttime work and short-term lane closures. Work to begin
Aug. 19th, and will continue through mid-September. � Paving � Pioneer
Parkway, Mohawk, 42nd St, and Main Street ramps: Night time ramp
closures and lane closures Monday night will continue through Tuesday
night (Wednesday morning) Aug. 13th (morning of Aug. 14th) to grind
and pave Highway 126. � Paving � 42nd St to Main Street: Night time
paving to occur on Friday night, Aug. 9th (morning of Aug. 10th) on
eastbound Hwy 126 from 28th Street to Main Street. The fast lane
closure will close off left turns at 52nd Street. � Irregular surfaces
on bridge decks � Pioneer Parkway Bridge, 5th Street Bridge 28th
Street Bridges, and McKenzie Overflow Bridges (near 52nd Street):
Mircromill of pavement on bridge decks is complete some have been
repaved. Abrupt edges along the center stripes can occur for 24 hours
and are signed for no lane changes. Some locations receive a paving
wedge, but are still posted for no lane changes. Pavement will be
replaced during night paving operations, anticipated to be complete by
August 14th. � Traffic Loops � Pioneer Parkway, 42nd St. ramp, and
52nd St. intersection: Night time ramp closures will occur on Pioneer
Parkway and 42nd St. ramps for traffic loop installation from Aug.
12th through Aug. 20th. The loops at the 52nd St. intersection will be
installed Aug. 15th through the 20th. � Bridge Joints � Pioneer
Parkway to Overflow Bridges (near 52nd St.): Night time closures of
single lanes at bridge ends will occur Aug 20th through mid-September
to complete bridge joint work. � Permanent Striping � I-5 to Main
Street: Nighttime lane closures will occur Aug. 12th through Aug. 15th
for permanent striping. Project Summary: This project will preserve
the existing highway by grinding and replacing two inches of asphalt
in most areas and reconstructing the eastbound portions of the 42nd
Street interchange. The project will also improve safety by
constructing cable median barrier between Mohawk Blvd. and East Main
Street (MP 6.24-9.97). Residents and businesses along the highway
should anticipate noise consistent with road construction.
Updated: 08/16/2013 3:00 pm
ORE126 MP 4.34 To 4.94
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Pioneer Pkwy (OR528) & "Q"
St (Springfield) Effective July 9, 2013, the on/off ramps to/from
OR126 EB & WB to Pioneer Pkwy (OR528) and "Q" St will be
intermittently closed Monday - Thursday nights between the hours of 7
PM & 8 AM. No closures will be in place from 8 AM Friday until 7 PM
Monday. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 5.9 To 6.29
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from Mohawk Blvd (Springfield)
Effective June 27, 2013, the on- and off-ramp to/from Mohawk Blvd will
be intermittently closed per the following schedule: eastbound -
Monday through Thursday nights, 7 PM to 8 AM; westbound - Monday
through Thursday nights, 6 PM to 5:30 AM. These closures are NOT on
the OR126 mainline. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 7.16 To 7.44
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield)
Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be
intermittently closed per the following schedule: eastbound - Monday
through Thursday nights, 7 PM to 11 AM; westbound - Monday through
Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126
mainline. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE126 MP 7.19 To 7.47
Informational only; Commercial Vehicle Information
Details: OR126 EB & WB on/off ramps to/from 42nd Ave (Springfield)
Effective June 26, 2013, the on- and off-ramp to/from 42nd Ave will be
intermittently closed per the following schedule: eastbound - Monday
through Thursday nights, 7 PM to 11 AM; westbound - Monday through
Thursday nights, 6 PM to 5:30 AM. These closures are NOT on the OR126
mainline. Estimated date of completion is September 13, 2013.
Updated: 08/16/2013 10:00 am
ORE569 MP 8.46
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays
between 10 p.m. and 6 a.m. each day until bridge work is done. Use
caution. This project will seal small cracks in the decks of various
concrete bridges on Randy Pape' Beltline Highway and I-105 in Eugene.
Current schedule: 8/12 Beltline over River Rd. both directions
8/13 I-105 WB to 7th Ave. 8/14 I-105 WB to 7th Ave. 8/15 I-105 WB to
7th Ave. 8/16 7th Ave. to I-105 EB 8/19 7th Ave. to I-105 EB 8/20 7th
Ave. to I-105 EB 8/21 I-105 Future Ramp both directions 8/22 I-105
Future Ramp if needed 8/23 Ramp from 6th Ave to I-105 East 8/24 I-105
ramp down to 6th Ave. West
Updated: 08/16/2013 3:01 pm
ORE569 MP 12.26 To 13
Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9,
2013, this section of OR569 will be restricted to 14 feet 00 in. in
width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM.
In addition, the height will be restricted to 19 feet 01 in. in height
eastbound, and 18 feet 09 in. in height westbound during the same
time. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.53 To 12.95
Informational only; Commercial Vehicle Information
Details: OR569 MP 12 to MP 13 EB & WB (Eugene) Effective April 9,
2013, this section of OR569 will be restricted to 14 feet 00 in. in
width on Monday - Thursday nights between the hours of 7 PM & 6:30 AM.
In addition, the height will be restricted to 19 feet 01 in. in height
eastbound, and 18 feet 09 in. in height westbound during the same
time. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.76
Informational only; Commercial Vehicle Information
Details: OR569 WB ramp to I-5 SB (Eugene) Effective May 20, 2013, the
ramp from OR569 westbound to I-5 southbound will be intermittently
closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30
AM. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
ORE569 MP 12.79
Informational only; Commercial Vehicle Information
Details: OR569 EB ramp to I-5 NB (Eugene) Effective May 20, 2013, the
ramp from OR569 eastbound to I-5 northbound will be intermittently
closed on weeknights (Monday-Friday) between the hours of 8 PM & 5:30
AM. Estimated date of completion is November 30, 2014.
Updated: 08/16/2013 10:00 am
City of La Grande Road Conditions by Route
I-84 MP 259 To 260
No to Minimum Delay; Maintenance Work
Lanes Affected: (Eastbound) 1 Lane
Comments: Road maintenance operations are occurring causing no to
minimum delays, use caution.
Updated: 08/14/2013 10:21 am
I-84 MP 264.25
No to Minimum Delay; Traffic Congestion
Lanes Affected: (Westbound) 1 Lane
Comments: Right lane will be closed at milepost 259 while debris is
being removed from the freeway, use caution. Watch for truck traffic.
Last Updated: 08/14/2013 10:05 am
City of Medford Road Conditions by Route
I-5 MP 35.27
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 35 ramp to OR99 and Blackwell Rd / Hwy #270
(Central Point) Effective August 20, 2013, the ramp from I-5
northbound Exit 35 to OR99 and Blackwell Rd / Hwy #270 will be closed
between the hours of 6 PM & 6 AM. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
Portland Metro Road Conditions by Route
Hwy100 MP 0 To 4
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures with
flaggers Motorists can expect daytime lane closures throughout the
project area with flaggers directing traffic between 7 a.m. and 5
p.m., Monday through Friday, for guardrail replacement. This project
will replace seven sections of old guardrail on the Historic Columbia
River Highway (U.S. 30) between the Troutdale Bridge over the Sandy
River and Dabney State Park. The new guardrail will look just like the
historic, white double-rail sections that are being replaced.
Updated: 07/26/2013 8:24 pm
I-5 MP 286.52
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from WB Elligsen Rd (North Wilsonville)
Effective September 6, 2013, the ramp from Elligsen Rd westbound to
I-5 northbound will be closed between the hours of 9 PM & 6 AM
(NIGHTTIME). Estimated date of completion is September 7, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 289.27
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Nyberg St (Tualatin) Effective August 23,
2013, the ramp from Nyberg St to I-5 southbound will be closed between
the hours of 9 PM & 6 AM. Estimated date of completion is August 24,
2013.
Updated: 08/16/2013 10:00 am
I-5 MP 290.75
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Lower Boones Ferry Rd and Bridgeport Rd
(Tualatin) Effective August 26, 2013, the ramp from Lower Boones Ferry
Rd and Bridgeport Rd to I-5 northbound will be closed between the
hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.86
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from OR217 SB (Tigard) Effective August 26,
2013, the ramp from OR217 southbound to I-5 southbound will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is September 6, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.89
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August
19, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound
will be intermittently closed between the hours of 11 PM & 5 AM
(NIGHTTIME). Estimated date of completion is October 25, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 292.56
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 292 to OR217 / Kruse Way (Tigard) Effective
August 26, 2013, the ramp from I-5 southbound Exit 292 will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 293.28
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 293 ramp to Haines St (Tigard) Effective
September 6, 2013, the ramp from I-5 southbound Exit 293 to Haines St
will be closed between the hours of 9 PM & 6 AM (NIGHTTIME). Estimated
date of completion is September 7, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.04 To 299.25
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramp from OR43/Hood St to SB I-5 will be
intermittently closed during the same times. Estimated date of
completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.041 To 298.93
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd &
OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the
same times. Estimated date of completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 297.55
Informational only; Commercial Vehicle Information
Details: I-5 SB MP 298.04 to MP 297.81 (Portland) Effective August 21,
2013, this section of I-5 southbound will be restricted to 12 feet 00
in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 298.48 To 297
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder
(Northbound) Median , All Lanes , Shoulder
Comments: The speed limit on I-5 is reduced to 50 mph in the work
area. This speed reduction is in effect 24 hours a day and will remain
in place. This project replaces a viaduct on I-5 that crosses a ravine
at SW Iowa Street, between Terwilliger Boulevard (exit 297) and
Corbett Avenue (exit 298) in Portland, and includes building a
temporary detour bridge on the west side of I-5.
Updated: 07/26/2013 7:36 pm
I-5 MP 299.52
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299B ramp to I-405 NB (Portland) Effective July
29, 2013, the ramp from I-5 northbound Exit 299B to I-405 northbound
will be restricted to 14 feet 00 in. in width bewteen the hours of 8
PM & 5 AM. Estimated date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 299.9 To 300.36
Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299.90 to MP 300.36 (Marquam Bridge - Portland)
Effective July 29, 2013, this section of I-5 northbound will be
restricted to 14 feet 00 in. in width, and 15 feet 11 in. in height
between the hours of 8 PM & 5 AM. Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 300.271
Informational only; Commercial Vehicle Information
Details: I-5 SB ramp to I-405 NB (Portland) Effective July 29, 2013,
the ramp from I-5 southbound to I-405 northbound will be 14 feet 00
in. in width between the hours of 8 PM & 5 AM. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 301.911
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 301 ramp to I-84 EB (Portland) Effective August
13, 2013, the ramp from I-5 southbound Exit 301 to I-84 eastbound will
be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 305.93
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from Columbia Blvd (North Portland) Effective
August 25, 2013, the ramp from Columbia Blvd to I-5 southbound will be
closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date
of completion is August 27, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 0 To 8
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring, use caution. None
anticipated this week. Preliminary schedule of weekend closures
(weather dependent): � Fri., July 12 (10 p.m.) to Mon., July 15 (5
a.m.): I-84 eastbound closed from I-205 to I-5 � Fri., July 19 (10
p.m.) to Mon., July 22 (5 a.m.): I-84 westbound closed from I-5 to
I-205 � Sat. Aug. 3 (11 p.m.) to Mon. Aug. 5 (5 a.m.): I-84 westbound
closed from I-5 to I-205 Project Description: This project will grind
and pave all lanes on I-84 between I-5 and I-205, pave most of the on
and off ramps, replace freeway signage, restripe the I-84 westbound
merge with I-5 and pave and repair the NE Halsey Street overpass at
82nd Avenue and I-84. This project will require several weekend
directional full closures of I-84 and full nighttime closures of I-84
and Halsey Street to complete.
Updated: 08/05/2013 05:27 am
I-84 MP .02 To 5.78
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP .07 To 5.79
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 5.41
Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 6 ramp to I-205 SB (Portland) Effective August
15, 2013, the ramp from I-84 eastbound Exit 6 to I-205 southbound will
be closed. Estimated date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 5.44 To 6.59
Informational only; Commercial Vehicle Information
Details: I-84 MP 5.42 to MP 6.60 EB (Portland) Effective April 29,
2013, this section of I-84 eastbound will be restricted to 12 feet 00
in. in width, and 18 feet 00 in. in height on Sunday - Thursday nights
between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the ramp
from I-84 eastbound Exit 7 to Halsey St will be intermittently closed
during the same hours. Estimated date of completion is November 5,
2013.
Updated: 08/16/2013 10:00 am
I-84 MP 6.29
Informational only; Commercial Vehicle Information
Details: I-84 EB Exit 8 ramp to I-205 NB (Portland) Effective August
27, 2013, the ramp from I-84 eastbound Exit 8 to I-205 northbound will
be intermittently closed between the hours of 10 PM & 5 AM
(NIGHTTIME). Estimated date of completion is September 12, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP 7 To 8
ON RAMP
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: None anticipated this week. Ramps Affected. Project
Description: This project will improve congestion and safety by adding
a new "auxiliary" lane to the two-lane section of I-84 eastbound
between Halsey Street (exit 7) and I-205 northbound (exit 8).
Updated: 07/26/2013 7:41 pm
I-84 MP 15.19
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder
Comments: There will be occasional daytime shoulder closures this week
for various work activities. Project Description: This project will
install a new electronic variable message sign on I-84 westbound near
NE 223rd/Fairview Avenue in Fairview.
Updated: 07/26/2013 7:45 pm
I-84 MP 17
No to Minimum Delay; Construction Work
Comments: There will be occasional daytime and nighttime single lane
closures on Marine Drive southbound, just north of the North Frontage
Road for various work Project Description: This project will install
new electronic variable message signs on 257th Avenue just north of
the factory outlet mall and on Marine Drive just north of the North
Frontage Road in Troutdale. The new signs will help alert motorists to
traffic problems on I-84 before they get on the freeway.
Updated: 07/26/2013 7:48 pm
I-84 MP 17.37 To 18.06
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this
section of I-84 will be restricted to 16 feet 00 in. in width between
the hours of 9 PM & 7 AM. Estimated date of completion is November 30,
2014.
Updated: 08/16/2013 10:00 am
I-84 MP 17.65
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: Traffic on I-84 has been shifted to a new temporary
alignment and the speed limit is reduced to 50 mph. Project
Description: This project replaces two bridges on I-84 over the Sandy
River east of exit 17 in Troutdale, and repairs two bridges over
Jordan Road east of the Sandy River at exit 18.
Updated: 07/26/2013 7:51 pm
I-84 MP 17.68
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.68 WB (Sandy River Bridge - Troutdale) I-84 WB
crossing the Sandy River Bridge is restricted to single trip permits
beyond Weight Table 5.
Updated: 08/16/2013 10:00 am
I-84 MP 17.82
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.82 EB & WB (Jordan Rd Underpass) Effective
September 1, 2010, the Jordan Rd underpass at Exit 18 will be
restricted to 13 feet 00 in. in width. This restriction is NOT on the
I-84 mainline. Effective April 15, 2013, the height will be restricted
to 14 feet 9 inches crossing under I-84 on Jordan Rd. Estimated date
of completion is November 1, 2014.
Updated: 08/16/2013 10:00 am
I-84 MP 18
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: Expect alternating one-way traffic controlled by temporary
signals on Jordan Road at I-84. Please obey parking restrictions in
this area. Project Description: This project replaces two bridges on
I-84 over the Sandy River east of exit 17 in Troutdale, and repairs
two bridges over Jordan Road east of the Sandy River at exit 18.
Traffic Impacts: None anticipated this week. For more information:
Updated: 07/26/2013 8:25 pm
I-84 MP 18.15 To 17.37
Informational only; Commercial Vehicle Information
Details: I-84 MP 17.31 to MP 18.20 EB & WB Effective May 1, 2010, this
section of I-84 will be restricted to 16 feet 00 in. in width between
the hours of 9 PM & 7 AM. Estimated date of completion is November 30,
2014.
Updated: 08/16/2013 10:00 am
I-205 MP 10.83 To 12.94
Informational only; Commercial Vehicle Information
Details: I-205 NB MP 10.83 to MP 12.94 (Clackamas) Effective August
18, 2013, this section of I-205 northbound will be closed between the
hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is
August 20, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 18.89 To 21.49
Informational only; Commercial Vehicle Information
Details: I-205 NB MP 18.89 to MP 21.49 (Portland) Effective August 20,
2013, this section of I-205 northbound will be closed between the
hours of 12:01 AM & 4 AM (NIGHTTIME). Estimated date of completion is
August 21, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 19.61
No to Minimum Delay; Construction Work
Comments: There will be intermittent daytime impacts to path users on
the north side of Division Street this week. Project Description: This
project will build a new section of the I-205 Multi-Use Path that will
split off from the existing path approximately 360 feet north of SE
Division Street, cross under Division Street next to the MAX Green
Line and reconnect with the multi-use path at the north end of the
Division Street Max stop. This new route will offer path users a
non-stop connection through Division Street, without the need to wait
for the signal at the crosswalk.
Updated: 07/26/2013 8:08 pm
I-205 MP 23.02 To 24.92
Informational only; Commercial Vehicle Information
Details: I-205 MP 23 to MP 25 NB (Portland) Effective June 12, 2013,
this section of I-205 northbound will be restricted to 17 feet 00 in.
in width, and 16 feet 10 in. in height between the hours of 10 PM & 5
AM (NIGHTTIME). Estimated date of completion is September 19, 2013.
Updated: 08/16/2013 10:00 am
I-205 MP 24.5
Estimated delay under 20 minutes; Construction Work
Comments: This week, motorists can expect daytime lane closures at the
Airport Way/I-205 ramps in both directions at, from 8 a.m. to 2 p.m.
Project Description: This project will help improve traffic flow at
this busy interchange by constructing a new free-flowing on ramp from
Airport Way westbound onto I-205 northbound. Motorists on Airport Way
eastbound will have two left turn lanes onto I-205 northbound and will
no longer have to share signal time with westbound motorists on
Airport Way.
Updated: 07/26/2013 8:05 pm
I-205 MP 24.92
Informational only; Commercial Vehicle Information
Details: I-205 NB on-ramp from Airport Way (Portland) Effective April
1, 2013, the ramp from Airport Way to I-205 northbound will be
restricted to 16 feet 00 in. in width, and 18 feet 03 in. in height
between the hours of 7 PM & 2 PM. No restrictions will be in place
between 2 PM & 7 PM. Beginning June 18, 2013, these restrictions will
be in place at all hours. Estimated date of completion is December 31,
2013.
Updated: 08/16/2013 10:00 am
I-405 MP 0
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 SB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 southbound will be restricted to
14 feet 00 in. in width between the hours if 8 PM & 5 AM. Estimated
date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-405 MP .77 To .8
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 northbound will be restricted to
14 feet 00 in. in width, and 15 feet 05 in. in height between the
hours of 8 PM & 5 AM. In addition, the ramp from SW 5th St to I-405
southbound will be closed during the same time. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
ORE8 MP 11.28 To 14.66
Informational only; Commercial Vehicle Information
Details: OR8 MP 11.28 to MP 14.66 EB & WB (Hillsboro) Effective June
1, 2013, this section of OR8 will be restricted to 10 feet 00 in. in
width between the hours of 6 PM & 6 AM, and 14 feet 00 in. in width
between the hours of 9 AM & 3 PM. Estimated date of completion is
September 30, 2013.
Updated: 08/16/2013 10:00 am
ORE8 MP 11.28 To 14.66
Estimated delay under 20 minutes; Construction Work
Comments: A paving and utility project is underway with daytime and
nighttime lane closures. ODOT and City of Hillsboro are partnering on
a paving and utility improvement project on Tualatin Valley (TV)
Highway (OR 8) between Minter Bridge Road and 331st Avenue. Work on TV
Highway involves grinding, reconstructing, paving and restriping;
significantly upgrading the City�s water and storm water systems;
improving more than 100 ADA ramps (accessible curb ramps); and
repairing and paving the Dairy Creek Bridge. Traffic Impacts: From
Monday, July 29nd through Friday, August 2nd there will be
intermittent daytime lane closures on TV Highway/Baseline Street/Oak
from 6 a.m. to 3 p.m. on Monday for installation of sidewalk ramps,
under deck bridge work, utility trench repairs, and installation of
erosion control devices. Nighttime lane closures on OR 8, Monday �
Friday, from 7 p.m. to 6 a.m. for utility work, restriping, waterline
work, sewer replacement, .and pavement removal. Expect the area from
11th St. to Maple in Hillsboro to be very noisy at night for sewer
replacement. There will be temporary sidewalk ramp closures at
Baseline Street and Main Street and at 17th Avenue.
Updated: 07/26/2013 4:39 pm
ORE43 MP 0
Informational only; Commercial Vehicle Information
Details: OR43 NB ramp to US26 WB/Kelly Ave (Portland) Effective July
15, 2013, the NB OR43 ramp to US26 WB/Kelly Ave will be intermittently
closed Monday - Friday between the hours of 9 PM & 5:30 AM. Estimated
date of completion is September 1, 2013.
Updated: 08/16/2013 10:00 am
ORE43 MP 11.43
Informational only; Commercial Vehicle Information
Details: OR43 MP 11.43 (Arch Bridge - Oregon City) The Oregon City
Arch Bridge is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle, 80,000 lbs. GVW, Weight Table 1.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.22
Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective
January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from
US26/Kelly Ave will be restricted to 10 feet 00 in. in width.
Estimated date of completion is September 3, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.45 To 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 3.2
Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August
24, 2010, this section of OR99W will be restricted to 14 feet 00 in.
in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are
allowed. In addition, the height will be restricted to 17 feet 00 in.
in height at the same time. Estimated date of completion is December
31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 5.93 To 6.3
Informational only; Commercial Vehicle Information
Details: OR99E MP 5.93 to MP 6.30 NB & SB (Milwaukie) Effective August
12, 2013, this section of OR99E northbound and southbound will be
restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height on
Monday to Friday between the hours of 10 AM & 3 PM (DAYTIME).
Estimated date of completion is August 23, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 12.18 To 16.66
Informational only; Commercial Vehicle Information
Details: OR99W MP 12.03 to MP 16.68 NB & SB (Tualatin) Effective April
15, 2013, this section of OR99W will be restricted to 10 feet 00 in.
in width between the hours of 8 PM & 6 AM. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 12.2
Informational only; Commercial Vehicle Information
Details: OR99W SB MP 12.20 Tualatin River Bridge MP 12.20 Tualatin
River Bridge in King City is restricted to 20,000 lbs. single axle,
34,000 lbs. tandem axle - 105,500 lbs. GVW., Weight Table 2.
Updated: 08/16/2013 10:00 am
ORE120 MP .38
Informational only; Commercial Vehicle Information
Details: OR120 MP 0.38 Columbia Slough Bridge (Swift Hwy in Portland)
This bridge is restricted to 20,000 lbs. single axle, 34,000 lbs.
tandem axle - 105,500 lbs. GVW. Weight Table 2 for divisible loads.
Updated: 08/16/2013 10:00 am
ORE217 MP 0 To 7.52
Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013,
OR217 will be restricted to 13 feet 00 in. in width between the hours
of 9:30 PM & 5 AM. In addition, the height will be restricted to 15
feet 11 in. going northbound and 15 feet 07 in. going southbound
between the hours of 8 PM & 5 AM. Estimated date of completion is
December 31, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 0 To 7.52
Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217.
This project will make operational and safety improvements on OR 217,
including widening the right shoulders on three sections of OR 217,
paving both directions of OR 217 from TV Highway to I-5, improving
signage in the OR 217 corridor, and upgrading the center median
barrier. There will be ongoing lane and shoulder closures both
northbound and southbound at nighttime (7:30 PM to 6 AM Monday-Friday
and until 7 a.m. on Saturday) for roadway grinding and paving. There
will be ongoing shoulder work during the day. On Friday, July 26th
northbound lanes will be closed between S.W. Canyon Rd. and Tualatin
Valley Highway for paving. Detours will be in place. On Monday, July
29th the southbound lanes between S.W. Canyon Rd. and Tualatin Valley
Highway will be closed for paving. A traffic detour will be in place.
Updated: 07/26/2013 4:20 pm
ORE217 MP 1.47 To 1.76
Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May
13, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should
take Exit 2A and re-enter OR217. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.56 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.81 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 4.94
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) Median , 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 07/24/2013 02:33 am
ORE217 MP 4.95 To 5.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective
September 16, 2013, this section of OR217 will be intermittently
closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date
of completion is October 11, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.19 To 6.69
Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective September
16, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is
October 25, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.87 To 6.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 7.00 to MP 6.87 NB (Tigard) Effective August 1,
2013, this section of OR217 northbound will be restricted to 10 feet
00 in. in width between the hours of 9 PM & 5:30 AM (NIGHTTIME).
Estimated date of completion is September 20, 2013.
Updated: 08/16/2013 10:00 am
ORE224 MP -.01 To .93
Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February
4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in
width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of
completion is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE99E MP 1 To 1.5
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures
Motorists can expect daytime lane closures with flaggers controlling
traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday.
The right lane on OR 99E (Martin Luther King, Jr. Boulevard)
southbound starting at Division Street may also be closed this week
between 9 a.m. and 3 p.m. This project will pave and adjust manhole
covers on the �jughandle� on-ramp from SE Ivon Street/SE 4th Place
onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound
viaduct. Construction will be complete by May 2013.
Updated: 07/30/2013 8:16 pm
ORE99E MP 5.93 To 6.3
Informational only; Construction Work
Comments: Expect shoulder closures for Portland-Milwaukie Light Rail
Project. Full weekend closure will occurr in this area Aug. 16-19.
Construction of the Portland-Milwaukie Light Rail Transit Project
requires the closure of McLoughlin Blvd/Hwy 99E between SE Washington
Street and SE River Road from 10 p.m. Friday, August 16 to 5 a.m.
Monday, August 19. Construction crews will be placing large steel
bridge girders over McLoughlin Blvd/ Hwy 99E in order to create the
bridge that will carry light rail from downtown Milwaukie to the west
side of McLoughlin/Hwy 99E. Crews will work 24 hours a day to complete
the work in the shortest time possible. Construction outside normal
hours is approved under a City of Milwaukie noise variance
(503-786-7500). Access to local residences and businesses will be
maintained. McLoughlin will be open for local access only between SE
River Road/Bluebird Street and Park Avenue, and between SE Harrison
and Washington streets. TriMet bus line 33-McLoughlin will be rerouted
to Oatfield Road via Park Avenue. Travelers wanting to get around the
closure will follow a signed detour and use OR 224 and I-205. For more
informaiton and detour maps:
Updated: 08/15/2013 4:23 pm
ORE99W MP 10.95
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays,
use caution. This safety project will widen OR 99W at Beef Bend Road
in Tigard/King City in order to build a dedicated right turn lane for
southbound motorists. This week, there may be brief traffic delays
during the day as trucks enter and exit the work zone from Beef Bend
Road. The contractor will maintain the temporary bike/ped access
through the project area this week. Bicyclists and pedestrians using
the trail near Beef Bend Road should use caution and watch for
equipment and construction activities along the path.
Updated: 07/26/2013 8:22 pm
ORE99W MP 16.58 To 12.15
Estimated delay under 20 minutes; Construction Work
Comments: Nighttime paving on OR 99W through the summer. Expect short
delays between 8 p.m. and 6 a.m. This project will grind off the old
pavement, repave and restripe OR 99W in both directions between the
Tualatin River Bridge in King City and Sunset Boulevard in Sherwood.
This week, motorists can expect nighttime single lane closures on OR
99W in both directions throughout the entire project area from 8 p.m.
to 6 a.m., Monday through Friday, for paving.
Updated: 07/26/2013 8:24 pm
US26 MP .01
OFF RAMP
No to Minimum Delay; Construction Work
Comments: Random shoulder closures including Saturday, July 20 from
7:00 a.m. to 3:30 p.m. No impact to traffic other than on S.W. Meade
St. which is closed Ramps Affected. Project Description: This project
will replace the concrete pavement on the southbound Ross Island Way
ramp from SW Arthur Street to the Ross Island Bridge, and make various
bicycle and pedestrian safety improvements along SW Kelly Avenue on
the west side of the Ross Island Bridge adjacent to the National
College of Natural Medicine.
Updated: 07/26/2013 8:12 pm
US26 MP .01
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave WB ramp to OR99W/Naito Parkway NB (Portland)
Effective July 15, 2013, the US26/Kelly Ave WB ramp to OR99W/Naito
Parkway NB will be intermittently closed Monday - Friday between the
hours of 9 PM & 5:30 AM. Estimated date of completion is September 1,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .16 To .32
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .22
Informational only; Commercial Vehicle Information
Details: US26/Ross Island Bridge WB ramp to I-5 SB & OR43 SB
(Portland) Effective July 15, 2013, the US26/Ross Island WB ramp to
I-5 SB & OR43 SB will be intermittently closed Monday - Friday between
the hours of 9 PM & 5:30 AM. Estimated date of completion is October
15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .25
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave EB ramp to I-5 SB & OR43 SB (Portland)
Effective July 15, 2013, the US26/Kelly Ave EB ramp to I-5 SB & OR43
SB will be intermittently closed Monday - Friday between the hours of
9 PM & 5:30 AM. Estimated date of completion is October 15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .31 To 0
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP 1.46
Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June
15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will
be closed. Estimated date of re-opening is September 1, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 6.03 To 9.96
Informational only; Commercial Vehicle Information
Details: US26 MP 6.00 to MP 10.15 EB & WB (East Portland) Effective
June 24, 2013, this section of US26 will be restricted to 10 feet 00
in. in width per the following schedule: Sunday - Thursday nights
between the hours of 8 PM & 6 AM; Friday night between the hours of 8
PM & 9 AM; Saturday night between the hours of 8 PM & 10 AM. The
estimated date of completion is October 28, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 6.64
No to Minimum Delay; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: During night time hours, various intersections will close to
one lane only in each direction. Project Description: The project
includes safety upgrades and new pavement. The work includes: Traffic
signal upgrades to reduce crashes New curb ramps to meet Americans
with Disabilities (ADA) standards New pedestrian signals Three new
crosswalks with rapid flash beacons at Southeast 119th, 141st,and
156th avenues An eight foot shoulder through the corridor The project,
which began July 8, 2013, will be completed in mid-October, 2013
Updated: 07/26/2013 8:15 pm
US26 MP 56.93 To 57.33
Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North
Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and
off-ramp to/from Glencoe Rd will be intermittently closed per the
following schedule: Monday through Friday nights, 9:30 PM to 5 AM;
Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on
the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 56.98 To 57.38
Informational only; Commercial Vehicle Information
Details: US26 Exit 57 EB & WB on/off ramps to/from Glencoe Rd (North
Plains) Effective June 21, 2013, the US26 Exit 57 EB & WB on- and
off-ramp to/from Glencoe Rd will be intermittently closed per the
following schedule: Monday through Friday nights, 9:30 PM to 5 AM;
Saturday and Sunday nights 10 PM to 8 AM. These closures are NOT on
the US26 mainline. Estimated date of completion is October 31, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 57
Estimated delay under 20 minutes; Construction Work
Comments: Construction is occurring near the roadway. Please use
caution. Project Description: This project replaces the Glencoe Road
overpass at U.S. 26 in North Plains and improves the highway ramps,
bicycle and pedestrian connections, signs, traffic signals, striping
and drainage at this interchange. A culvert under Glencoe Road will
also be replaced with a bridge. Traffic Impacts: None this week as the
contractor is working on tasks off the roadway. For more information:
Updated: 05/22/2013 08:42 am
US26 MP 65.9 To 64.3
Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: there may be lane closures on U.S. 26 around the Bethany
Boulevard overpass for Washington County project. Project Description:
This project widened U.S. 26 between NW Cornell Road and 185th Avenue
in Beaverton to three lanes in each direction, added median cable
barrier and widened the shoulders
Updated: 07/26/2013 8:22 pm
US26 MP 72.36
Informational only; Commercial Vehicle Information
Details: US26 EB on-ramp from Knights Blvd - Zoo - Forestry Center
(East Portland) Effective August 25, 2013, the ramp from Knights Blvd
- Washington Park Zoo - Forestry Center to US26 eastbound will be
closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date
of completion is August 27, 2013.
Updated: 08/16/2013 10:00 am
US30 MP .03
Informational only; Commercial Vehicle Information
Details: US30 (Historic Columbia River Hwy) MP 0.03 (Sandy River
Bridge - Troutdale) US30 (Historic Columbia River Highway) crossing
the Sandy River Bridge is restricted to 30 tons gross weight.
Updated: 08/16/2013 10:00 am
US30 MP 12.5 To 17.93
Estimated delay under 20 minutes; Construction Work
Comments: Daytime lane closures & delays for paving; some access
restrictions This week, motorists can expect daily lane closures and
traffic shifts on U.S. 30 westbound (towards Scappose) from 3 a.m. to
3 p.m., Monday through Friday, for grinding and paving. Direct access
to driveways and cross-roads will be restricted at certain times as
the paving operation moves through. Motorists will be able to drive
past the paving work zone, make a u-turn and access these roads and
driveways from the other direction. Motorists will be driving on a
rough surface with a two-inch lip between lanes in certain areas.
Please slow down and use caution. This project will repave US 30 in
both directions between McNamee Road and milepost 17.93, just east of
the Columbia County line, and apply a waterproof membrane to the
bridge over McCarty Creek.
Updated: 07/26/2013 8:24 pm
US30 MP 12.69
Informational only; Commercial Vehicle Information
Details: US30 WB MP 12.62 to MP 12.76 (south of Scappoose) Effective
August 23, 2013, this section of US30 westbound will be restricted to
14 feet 00 in. in width between the hours of 7 PM & 7 AM. Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
US30 MP 13.14
Informational only; Commercial Vehicle Information
Details: US30 MP 13.14 Historic Columbia River Highway Historic US30
MP13.14 Youngs Creek (Shepperds Dell) Bridge is restricted to 20,000
lbs. single axle, 34,000 lbs. tandem axle, Wt. Table 1.
Updated: 08/16/2013 10:00 am
US30 MP 13.24
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays,
use caution. There is daytime shoulder work planned this week on US 30
as the contractor begins work on this project. This project will
improve safety and mobility at this intersection by lengthening
existing turn lanes from US 30 onto Cornelius Pass Road, adding new
dedicated right and left turn lanes from Cornelius Pass Road onto US
30 and upgrading traffic signals.
Updated: 05/09/2013 3:56 pm
US30 MP 17.68
Informational only; Commercial Vehicle Information
Details: US30 MP 17.68 Historic Columbia River Highway (W Multnomah
Falls Bridge) Historic US30 MP 17.68 West Multnomah Falls Bridge is
restricted to 28,000 lbs. for solo vehicles, 44,000 lbs. for 3-2
combinations, and 56,000 lbs. for 3-3 combinations.
Updated: 08/16/2013 10:00 am
US30BY MP 12.4 To 13.7
Estimated delay under 20 minutes; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: No work is planned this week. Project Description: This
safety improvement project will add a center left-turn lane to this
section of Sandy Boulevard, striped bike lanes in both directions and
sidewalk on the south side of the road. It will also upgrade the
traffic signals at NE 122nd Avenue and NE 138th Avenue and making
pedestrian crossing improvements at NE 131st Place. Traffic Impacts:
None anticipated this week. This project is in "winter shutdown mode,"
with only limited work activities anticipated through early spring.
For more information:
Updated: 07/28/2013 07:07 am
City of Salem Road Conditions by Route
ORE22 MP 1.29 To 2.12
Informational only; Commercial Vehicle Information
Details: OR22 EB MP 1.28 to MP 2.63 (east of Salem) Effective March
18, 2013, this section of OR22 eastbound will be restricted to 16 feet
00 in. in width, and 17 feet 04 in. in height during the following
times: Monday-Thursday from 12:01 AM to 3 PM, and from 6 PM to
midnight; Friday from 12:01 AM to 3 PM. Estimated date of completion
is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 1.38 To 2.08
Informational only; Commercial Vehicle Information
Details: OR22 WB MP 2.63 to MP 1.28 (east of Salem) Effective March
18, 2013, this section of OR22 westbound will be restricted to 16 feet
00 in. in width, and 17 feet 04 in. in height. Estimated date of
completion is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 1.6 To 5.2
Estimated delay under 20 minutes; Construction Work
Comments: The speed has been reduced to 45 mph in the construction
zone. Law enforcement is providing extra patrols on the project. This
project will improve the vertical clearance over the highway at four
overcrossings and resurface the highway between I-5 and Joseph Street.
At the Lancaster Avenue (MP 1.9) and Cordon Road (MP 2.8)
overcrossings the work will consist of lowering the highway
approximately 3 feet. The work will be done in stages. The 72nd Avenue
(MP 5.9) and Albus Road (MP 10.0) overcrossings will be raised
approximately 3 feet. The highway will be resurfaced between I-5 (MP
1.7) and Joseph Street (MP 5.2). This resurfacing will correct
drainage issues on the highway in this section. Starting on August 19,
traffic on OR22 between the Deer Park/Gaffin Road interchange and
Joseph Street will be down to one lane in each direction until the
completion of paving on Friday, September 13. In addition, the Deer
Park/Gaffic Road eastbound on ramp and Joseph Street westbound on ram
will be closed during this time period. However, all lanes on OR 22
will be open during the Labor Day weekend. The detour for the Deer
Park/Gaffin ramp closure is Ganon Drive to 71st Street to Joseph
Street to OR22 and for the Joseph Street closure is to 71st Street to
Ganon Drive to OR22.
Updated: 08/15/2013 10:40 am
ORE22 MP 3.81
Informational only; Commercial Vehicle Information
Details: OR22 EB on-ramp from Deer Park Rd (East of Salem) Effective
August 21, 2013, the ramp from Deer Park Rd to OR22 eastbound will be
closed. Estimated date of completion is September 16, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 3.99 To 5.44
Informational only; Commercial Vehicle Information
Details: OR22 MP 3.90 to MP 5.44 EB & WB (East of Salem) Effective
August 19, 2013, this section of OR22 will be restricted to 14 feet 00
in. in width. Mobile homes with eaves are allowed, provided the base
width does not exceed 14 feet 00 in. in width. No restrictions will be
in place between August 29, 2013 and September 2, 2013. Estimated date
of completion is September 16, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 5.21
Informational only; Commercial Vehicle Information
Details: OR22 WB on-ramp from Joseph St (East of Salem) Effective
August 21, 2013, the on-ramp from Joseph St to OR22 westbound will be
closed. Estimated date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
ORE22 MP 5.7 To 6.1
Estimated delay under 20 minutes; Construction Work
Comments: Expect work on the shoulders. 72nd Ave. over Highway 22
closed June 17 through August 15. Use Aumsville Highway and Joseph
Street as a detour.
Updated: 07/25/2013 1:56 pm
City of Portland Road Conditions by Route
I-5 MP 290.75
Informational only; Commercial Vehicle Information
Details: I-5 NB on-ramp from Lower Boones Ferry Rd and Bridgeport Rd
(Tualatin) Effective August 26, 2013, the ramp from Lower Boones Ferry
Rd and Bridgeport Rd to I-5 northbound will be closed between the
hours of 10 PM & 5 AM (NIGHTTIME). Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.86
Informational only; Commercial Vehicle Information
Details: I-5 SB on-ramp from OR217 SB (Tigard) Effective August 26,
2013, the ramp from OR217 southbound to I-5 southbound will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is September 6, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 291.89
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 292A ramp to OR217 NB (Tigard) Effective August
19, 2013, the ramp from I-5 northbound Exit 292A to OR217 northbound
will be intermittently closed between the hours of 11 PM & 5 AM
(NIGHTTIME). Estimated date of completion is October 25, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 292.56
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 292 to OR217 / Kruse Way (Tigard) Effective
August 26, 2013, the ramp from I-5 southbound Exit 292 will be
intermittently closed between the hours of 9:30 PM & 5:30 AM
(NIGHTTIME). Estimated date of completion is August 30, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 293.28
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 293 ramp to Haines St (Tigard) Effective
September 6, 2013, the ramp from I-5 southbound Exit 293 to Haines St
will be closed between the hours of 9 PM & 6 AM (NIGHTTIME). Estimated
date of completion is September 7, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.04 To 299.25
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 SB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 15 feet 00
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramp from OR43/Hood St to SB I-5 will be
intermittently closed during the same times. Estimated date of
completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 295.041 To 298.93
Informational only; Commercial Vehicle Information
Details: I-5 MP 295 to MP 299 NB Effective May 13, 2011, this section
of I-5 will be restricted to 12 feet 00 in. in width and 14 feet 10
in. in height between the hours of 10 PM & 5 AM (NIGHTTIME). In
addition, the on-ramps from Multnomah Blvd, Terwilliger Blvd &
OR99W/Barbur Blvd to NB I-5 will be intermittently closed during the
same times. Estimated date of completion is December 31, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 297.55
Informational only; Commercial Vehicle Information
Details: I-5 SB MP 298.04 to MP 297.81 (Portland) Effective August 21,
2013, this section of I-5 southbound will be restricted to 12 feet 00
in. in width between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 24, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 298.48 To 297
No to Minimum Delay; Construction Work
Lanes Affected: (Southbound) Median , All Lanes , Shoulder
(Northbound) Median , All Lanes , Shoulder
Comments: The speed limit on I-5 is reduced to 50 mph in the work
area. This speed reduction is in effect 24 hours a day and will remain
in place. This project replaces a viaduct on I-5 that crosses a ravine
at SW Iowa Street, between Terwilliger Boulevard (exit 297) and
Corbett Avenue (exit 298) in Portland, and includes building a
temporary detour bridge on the west side of I-5.
Updated: 07/26/2013 7:36 pm
I-5 MP 299.52
Informational only; Commercial Vehicle Information
Details: I-5 NB Exit 299B ramp to I-405 NB (Portland) Effective July
29, 2013, the ramp from I-5 northbound Exit 299B to I-405 northbound
will be restricted to 14 feet 00 in. in width bewteen the hours of 8
PM & 5 AM. Estimated date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 299.9 To 300.36
Informational only; Commercial Vehicle Information
Details: I-5 NB MP 299.90 to MP 300.36 (Marquam Bridge - Portland)
Effective July 29, 2013, this section of I-5 northbound will be
restricted to 14 feet 00 in. in width, and 15 feet 11 in. in height
between the hours of 8 PM & 5 AM. Estimated date of completion is
August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 300.271
Informational only; Commercial Vehicle Information
Details: I-5 SB ramp to I-405 NB (Portland) Effective July 29, 2013,
the ramp from I-5 southbound to I-405 northbound will be 14 feet 00
in. in width between the hours of 8 PM & 5 AM. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-5 MP 301.911
Informational only; Commercial Vehicle Information
Details: I-5 SB Exit 301 ramp to I-84 EB (Portland) Effective August
13, 2013, the ramp from I-5 southbound Exit 301 to I-84 eastbound will
be closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated
date of completion is August 16, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP .02 To 5.78
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-84 MP .07 To 5.79
Informational only; Commercial Vehicle Information
Details: I-84 MP 0.01 to MP 5.80 EB & WB (Portland) Effective March
27, 2013, this section of I-84 will be restricted to 14 feet 00 in. in
width between the hours of 10 PM & 5 AM (NIGHTTIME). In addition, the
height will be restricted to 15 ft 07 in. in height eastbound, and 14
ft 11 in. in height westbound during the same time. Estimated date of
completion is September 30, 2013.
Updated: 08/16/2013 10:00 am
I-405 MP 0
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 SB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 southbound will be restricted to
14 feet 00 in. in width between the hours if 8 PM & 5 AM. Estimated
date of completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
I-405 MP .77 To .8
Informational only; Commercial Vehicle Information
Details: I-405 SB ramp to I-5 NB (Portland) Effective July 29, 2013,
the ramp from I-405 southbound to I-5 northbound will be restricted to
14 feet 00 in. in width, and 15 feet 05 in. in height between the
hours of 8 PM & 5 AM. In addition, the ramp from SW 5th St to I-405
southbound will be closed during the same time. Estimated date of
completion is August 28, 2013.
Updated: 08/16/2013 10:00 am
ORE43 MP 0
Informational only; Commercial Vehicle Information
Details: OR43 NB ramp to US26 WB/Kelly Ave (Portland) Effective July
15, 2013, the NB OR43 ramp to US26 WB/Kelly Ave will be intermittently
closed Monday - Friday between the hours of 9 PM & 5:30 AM. Estimated
date of completion is September 1, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.22
Informational only; Commercial Vehicle Information
Details: OR99W/Naito Parkway NB on-ramp from US26/Kelly Ave Effective
January 14, 2013, the OR99W/Natio Parkway northbound on-ramp from
US26/Kelly Ave will be restricted to 10 feet 00 in. in width.
Estimated date of completion is September 3, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.45 To 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 1.49
Informational only; Commercial Vehicle Information
Details: OR99E MP 1.2 to MP 1.5 NB & SB (Portland) Effective June 3,
2013, this section of OR99E will be restricted to 16 feet 00 in. in
width between the hours of 9 AM & 3 PM (DAYTIME). In addition, the
height will be restricted to 16 feet 03 in. in height northbound
during the same time. Estimated date of completion is August 31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 3.2
Informational only; Commercial Vehicle Information
Details: OR99W MP 3.10 to MP 3.25 NB (Barbur Blvd) Effective August
24, 2010, this section of OR99W will be restricted to 14 feet 00 in.
in width between the hours of 9 AM & 4 PM. Mobile homes with eaves are
allowed. In addition, the height will be restricted to 17 feet 00 in.
in height at the same time. Estimated date of completion is December
31, 2013.
Updated: 08/16/2013 10:00 am
ORE99 MP 5.93 To 6.3
Informational only; Commercial Vehicle Information
Details: OR99E MP 5.93 to MP 6.30 NB & SB (Milwaukie) Effective August
12, 2013, this section of OR99E northbound and southbound will be
restricted to 14 feet 00 in. in width, and 16 feet 04 in. in height on
Monday to Friday between the hours of 10 AM & 3 PM (DAYTIME).
Estimated date of completion is August 23, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 0 To 7.52
Informational only; Commercial Vehicle Information
Details: OR217 MP 0 to MP 7.5 NB & SB Effective February 25, 2013,
OR217 will be restricted to 13 feet 00 in. in width between the hours
of 9:30 PM & 5 AM. In addition, the height will be restricted to 15
feet 11 in. going northbound and 15 feet 07 in. going southbound
between the hours of 8 PM & 5 AM. Estimated date of completion is
December 31, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 0 To 7.52
Estimated delay under 20 minutes; Construction Work
Comments: Expect nighttime construction and lane closures on OR 217.
This project will make operational and safety improvements on OR 217,
including widening the right shoulders on three sections of OR 217,
paving both directions of OR 217 from TV Highway to I-5, improving
signage in the OR 217 corridor, and upgrading the center median
barrier. There will be ongoing lane and shoulder closures both
northbound and southbound at nighttime (7:30 PM to 6 AM Monday-Friday
and until 7 a.m. on Saturday) for roadway grinding and paving. There
will be ongoing shoulder work during the day. On Friday, July 26th
northbound lanes will be closed between S.W. Canyon Rd. and Tualatin
Valley Highway for paving. Detours will be in place. On Monday, July
29th the southbound lanes between S.W. Canyon Rd. and Tualatin Valley
Highway will be closed for paving. A traffic detour will be in place.
Updated: 07/26/2013 4:20 pm
ORE217 MP 1.47 To 1.76
Informational only; Commercial Vehicle Information
Details: OR217 MP 1.31 to MP 1.99 NB & SB (Beaverton) Effective May
13, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). When closed, traffic should
take Exit 2A and re-enter OR217. Estimated date of completion is
August 30, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.56 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 3.81 To 4.95
Informational only; Commercial Vehicle Information
Details: OR217 MP 3.5 to MP 5.0 NB & SB (Beaverton) Effective
September 9, 2013 this section of OR217 will be intermittently closed
between the hours of 11 PM & 5 AM. Estimated date of completion is
September 27, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 4.94
Estimated delay under 20 minutes; Maintenance Work
Lanes Affected: (Northbound) Median , 1 Lane
Comments: Road maintenance operations are occurring, use caution.
Updated: 07/24/2013 02:33 am
ORE217 MP 4.95 To 5.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 4.8 to MP 6.0 NB & SB (Beaverton) Effective
September 16, 2013, this section of OR217 will be intermittently
closed between the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date
of completion is October 11, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.19 To 6.69
Informational only; Commercial Vehicle Information
Details: OR217 MP 6.0 to MP 6.7 NB & SB (Tigard) Effective September
16, 2013, this section of OR217 will be intermittently closed between
the hours of 11 PM & 5 AM (NIGHTTIME). Estimated date of completion is
October 25, 2013.
Updated: 08/16/2013 10:00 am
ORE217 MP 6.87 To 6.9
Informational only; Commercial Vehicle Information
Details: OR217 MP 7.00 to MP 6.87 NB (Tigard) Effective August 1,
2013, this section of OR217 northbound will be restricted to 10 feet
00 in. in width between the hours of 9 PM & 5:30 AM (NIGHTTIME).
Estimated date of completion is September 20, 2013.
Updated: 08/16/2013 10:00 am
ORE224 MP -.01 To .93
Informational only; Commercial Vehicle Information
Details: OR224 MP 0 to MP 1.05 EB & WB (Milwaukie) Effective February
4, 2013, this section of OR224 will be restricted to 14 feet 00 in. in
width between the hours of 9 AM and 3 PM (DAYTIME). Estimated date of
completion is November 15, 2013.
Updated: 08/16/2013 10:00 am
ORE99W MP 10.95
No to Minimum Delay; Construction Work
Comments: Road construction is occurring causing no to minimum delays,
use caution. This safety project will widen OR 99W at Beef Bend Road
in Tigard/King City in order to build a dedicated right turn lane for
southbound motorists. This week, there may be brief traffic delays
during the day as trucks enter and exit the work zone from Beef Bend
Road. The contractor will maintain the temporary bike/ped access
through the project area this week. Bicyclists and pedestrians using
the trail near Beef Bend Road should use caution and watch for
equipment and construction activities along the path.
Updated: 07/26/2013 8:22 pm
ORE99E MP 1 To 1.5
Estimated delay under 20 minutes; Construction Work
Comments: Road construction is occurring; Daytime lane closures
Motorists can expect daytime lane closures with flaggers controlling
traffic on the ramp from 7 a.m. to 4:30 p.m., Monday through Friday.
The right lane on OR 99E (Martin Luther King, Jr. Boulevard)
southbound starting at Division Street may also be closed this week
between 9 a.m. and 3 p.m. This project will pave and adjust manhole
covers on the �jughandle� on-ramp from SE Ivon Street/SE 4th Place
onto the OR 99E (Martin Luther King, Jr. Boulevard) southbound
viaduct. Construction will be complete by May 2013.
Updated: 07/30/2013 8:16 pm
ORE99E MP 5.93 To 6.3
Informational only; Construction Work
Comments: Expect shoulder closures for Portland-Milwaukie Light Rail
Project. Full weekend closure will occurr in this area Aug. 16-19.
Construction of the Portland-Milwaukie Light Rail Transit Project
requires the closure of McLoughlin Blvd/Hwy 99E between SE Washington
Street and SE River Road from 10 p.m. Friday, August 16 to 5 a.m.
Monday, August 19. Construction crews will be placing large steel
bridge girders over McLoughlin Blvd/ Hwy 99E in order to create the
bridge that will carry light rail from downtown Milwaukie to the west
side of McLoughlin/Hwy 99E. Crews will work 24 hours a day to complete
the work in the shortest time possible. Construction outside normal
hours is approved under a City of Milwaukie noise variance
(503-786-7500). Access to local residences and businesses will be
maintained. McLoughlin will be open for local access only between SE
River Road/Bluebird Street and Park Avenue, and between SE Harrison
and Washington streets. TriMet bus line 33-McLoughlin will be rerouted
to Oatfield Road via Park Avenue. Travelers wanting to get around the
closure will follow a signed detour and use OR 224 and I-205. For more
informaiton and detour maps:
Updated: 08/15/2013 4:23 pm
US26 MP .01
OFF RAMP
No to Minimum Delay; Construction Work
Comments: Random shoulder closures including Saturday, July 20 from
7:00 a.m. to 3:30 p.m. No impact to traffic other than on S.W. Meade
St. which is closed Ramps Affected. Project Description: This project
will replace the concrete pavement on the southbound Ross Island Way
ramp from SW Arthur Street to the Ross Island Bridge, and make various
bicycle and pedestrian safety improvements along SW Kelly Avenue on
the west side of the Ross Island Bridge adjacent to the National
College of Natural Medicine.
Updated: 07/26/2013 8:12 pm
US26 MP .01
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave WB ramp to OR99W/Naito Parkway NB (Portland)
Effective July 15, 2013, the US26/Kelly Ave WB ramp to OR99W/Naito
Parkway NB will be intermittently closed Monday - Friday between the
hours of 9 PM & 5:30 AM. Estimated date of completion is September 1,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .16 To .32
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP .22
Informational only; Commercial Vehicle Information
Details: US26/Ross Island Bridge WB ramp to I-5 SB & OR43 SB
(Portland) Effective July 15, 2013, the US26/Ross Island WB ramp to
I-5 SB & OR43 SB will be intermittently closed Monday - Friday between
the hours of 9 PM & 5:30 AM. Estimated date of completion is October
15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .25
Informational only; Commercial Vehicle Information
Details: US26/Kelly Ave EB ramp to I-5 SB & OR43 SB (Portland)
Effective July 15, 2013, the US26/Kelly Ave EB ramp to I-5 SB & OR43
SB will be intermittently closed Monday - Friday between the hours of
9 PM & 5:30 AM. Estimated date of completion is October 15, 2013.
Updated: 08/16/2013 10:00 am
US26 MP .31 To 0
Informational only; Commercial Vehicle Information
Details: US26 MP 0 to MP 0.31 EB & WB (Portland) Effective July 15,
2013, this section of US26 (on SW Kelly Ave and SW Ross Island Way)
will be restricted to 14 feet 00 in. in width Monday - Friday between
the hours of 9 AM & 3 PM. Estimated date of completion is October 15,
2013.
Updated: 08/16/2013 10:00 am
US26 MP 1.46
Informational only; Commercial Vehicle Information
Details: US26 WB on-ramp from NB 17th Ave - Portland Effective June
15, 2012, the ramp from northbound SE 17th Ave to US26 westbound will
be closed. Estimated date of re-opening is September 1, 2013.
Updated: 08/16/2013 10:00 am
US26 MP 65.9 To 64.3
Estimated delay of 20 minutes - 2 hours; Construction Work
Lanes Affected: (Westbound) Median , All Lanes , Shoulder (Eastbound)
Median , All Lanes , Shoulder
Comments: there may be lane closures on U.S. 26 around the Bethany
Boulevard overpass for Washington County project. Project Description:
This project widened U.S. 26 between NW Cornell Road and 185th Avenue
in Beaverton to three lanes in each direction, added median cable
barrier and widened the shoulders
Updated: 07/26/2013 8:22 pm
US26 MP 72.36
Informational only; Commercial Vehicle Information
Details: US26 EB on-ramp from Knights Blvd - Zoo - Forestry Center
(East Portland) Effective August 25, 2013, the ramp from Knights Blvd
- Washington Park Zoo - Forestry Center to US26 eastbound will be
closed between the hours of 10 PM & 5 AM (NIGHTTIME). Estimated date
of completion is August 27, 2013.
Updated: 08/16/2013 10:00 am
Sitemap Mobile Site Contact Us Oregon Department of Transportation
Copyright © 2013. All Rights Reserved. Oregon Department of Transportation.
--
President of The United States
Guy Ralph Perea Sr President of The United States
Weatherdata1046am0426 a Discussion Group of
Weatherdata<http://groups.google.com/group/weatherdata1046am0426>
USFMSC
http://www.cityfreq.com/ca/avalon/>
QUALIFY QICP
OCCUPS
http://www.occupationalinfo.org/02/025062010.html
goldlandabstracts; link check
own search engine - The United
States International Policies
http://lnk.ms/8d5gl aol
http://groups.google.com/group/united-states-of-american
http://twitter.com/ptusss Federal Communication
Commission<http://columbiabroadcast.spaces.live.com/>
Ambassador Chevy Chase; Kevin Corcran; Jack Nickolas; Cher; Shirley Temple
Black; Liza Minnille; Ansari; Ernest Tascoe; Food, Drug and Cosmetic Act
Agent Jodie Foster; Department of Veterans Affairs Director George H.W. Bush
Title 22 USCS section 1928 (b) The e-mail
transmission may contain legally privileged information that
is intended only for the individual or entity recipient, you are hereby,
notified that any disclosure, copying, distribution, or reliance upon the
contents of this E-mail is strictly prohibited. If you have received this
E-mail transmission in error, please reply to the sender, so arrangements
can be made for proper delivery. Title 42
USCS section 192 etseq Margie Paxton Chief of Childrens Bureau
Director of The United States Department of Human Services; Defendant
Article IV General Provisions Section 2
(Supreme Law of The Land) The Constitution of The United States "Any thing
in The Constitution or Laws of any State to the Contrary Notwithstanding"
Contrary to Law (of an act or omission) illegal;
https://twitter.com/ptusss
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.